background image

 

 

© Galvin Engineering Pty Ltd 

 

Product Installation Guidelines 

Version 1, 25

th

 May 2022, Page 

3

 of 5 

INSTALLATION

 

INSTALLATION COMPLIANCE: Galvin Engineering products must be installed in accordance with these 
installation  instructions  and  in  accordance  with  AS/NZS  3500,  the  PCA  and  your  local  regulatory 
requirements. Water and/or electrical supply conditions must also comply to the applicable national and/or 
state standards. Failing to comply with these provisions shall void the product warranty and may affect 
the performance of the product.  

 
 
 
 
 

 
 
 
 
 
 
 
WARNING: Install with stainless 
steel 304 or 316 screws. Other 
type of screws may rust and void 
warranty. 

 
 
 
 
 

 
 
 
 
 

 
 
When marking out the grab 
rails, use centre base holes of 
flange protector.

 

 
 
 
 
 
 
 
 
 
 
 
 
When marking out corner grab 
rails follow the fixing guide lug 
diagram shown above to suit grab 
rail orientation. 

 

 
 
 
 

 

1. 

Install straight grab rails including the 
horizontal section of any grab rail as per 
AS 1428.1, 800-810mm from floor to top 
of rail. Make sure the wall surface is flat 
and free from contaminants.

 

2. 

For straight grab rails, position the flange 
protector guide lugs either vertical or 
horizontal. 

 

 

 

 
 
 
 
 
 

3.   

Remove flange protector from grab rail 

flange. Align guide lug marks from step 2 
and mark wall through base holes to 
pinpoint screw holes.

 

 
 
 
 
 
 

4.   

Fit dress ring if applicable. Drill spot 

marks with 7mm bit. Screw wall mount 
plate to wall. Ensure screws engage wall 
stud or other solid substrate.

 

Отзывы: