Galvin Engineering Thermostatic Mixing Valve or Tempering 
Valve Commissioning Report and/or Maintenance Report

 

Note: 

1.  

Please use a separate form for each valve. 

2. 

The original copy of the report is to be given to the owner/occupier and retained on site for a minimum of 7 years. 

Cross off appropriate box  

 

Thermostatic Mixing Valve 

 

 

Tempering Valve   

 

Commissioning Report 

 

 

 

Maintenance Report  

 

Name of Establishment:    _____________________________________________________________________________   

Address of Establishment: ____________________________________________________________________ 

Phone Number: _____________________________ Date: _____________________  Work Order #:  _________________   

Contact Person: _______________________  Make & Model of Hot Water System: _________________________  ______ 

Temperature of Hot Water to the Valve: _____________ Temperature of Cold Water to the Valve: ______________ 

Hot Water Pressure: ________kPa Cold Water Pressure: _______kPa 

Make of Mixing Valve: _______________________ Model No: ________________________ Size:   __________________   

Valve Location/Building:  ______________________________________________________________________________   

Valve Identification No:   ______________________________________________________________________________   

Total No of Valves on the Site/Building:  __________________________________________________________________   

No of Outlets Serviced by this Valve: Baths (    )   Basins (    )  Showers (    ) 

Other Outlets - Details  _______________________________________________________________________________   

Valves Installed to the requirements of:

 

The Valves manufacturers requirements 

Yes 

No 

The specifications and drawings for the project 

Yes 

No 

The Local Water Supply or Authority 

Yes 

No 

 

If No, give details and actions taken: 
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
_________________________________________________________________________________________________ 

 

 

 

 

 

Содержание 100.41.21.20

Страница 1: ...ER SUPPLY CONDITIONS 3 5 1 INTRODUCTION 3 5 2 SUPPLY PRESSURE REQUIREMENTS 3 6 0 PRE INSTALLATION 4 7 0 INSTALLATION 5 7 1 OPERATION AND TESTING 8 7 2 SENSOR SETTING INSTRUCTIONS 8 8 0 COMMISSIONING 9...

Страница 2: ...ate fast and easy cleaning Complies with the requirements of AS 4032 4 Thermostatic Mixing Valves Self draining spout design Unique hygiene flush feature for in situ disinfection Suitable for connecti...

Страница 3: ...5 2 SUPPLY PRESSURE REQUIREMENTS This mixer is designed to be installed on all types of plumbing systems Hot and cold water supply pressures should be reasonably balanced however the mixer will functi...

Страница 4: ...MOUNTING DETAILS WALL PREPARATION 1 Cut out hole in wall as per dimensions shown below The depth of the hole must be between 75 and 95mm from the finished wall face 2 Drill four holes located as per...

Страница 5: ...s nstru t ns T h eve pt mum performance from the valve it is recommended that the inlet pressures are balanced to within 10 of each other To ensure that the mixing valve operates correctly it is neces...

Страница 6: ...m of free cable inside the box Using suitable fittings attach the box inside the wall Box must be leveled and installed parallel to the finished wall Connect supplied inlets to the thermostatic mixer...

Страница 7: ...he inner part of the spout to the mixing valve body until it stops Tighten to a torque of 10Nm Align the position of the back nut with the faceplate recess in frame and secure using grub screw The bac...

Страница 8: ...er part of the spout before installing the outer spout Push spout to the end and lock with grub screw to secure Ensure the disinfecton key cover is fitted to the open hole as shown 7 1 OPERATION AND T...

Страница 9: ...peration restart electronics 1x app 2 sec till 1x extended function mode is active 2x a app 0 5 sec pulsing during active function 1x app 5 sec till 4x 1x sec Release and wait till 1x sec keep out of...

Страница 10: ...n following the isolation The volume of mixed water discharged for a period of between 5 35 seconds should be measured and should not exceed the maximum volume set out in the applicable standard or co...

Страница 11: ...strainer and non return v ve f tted t the h t nd d w ter supp y nes The n et f tt ngs supp ed w th e h TMV will ensure this requirement is met If the CliniMix Thermostatic Mixing Valve is to be instal...

Страница 12: ...eratures 10 2 GENERAL SERVICING General Servicing of the CliniMix CMV2 Wall Mounted Hands Free Point Of Use Thermostatic Mixers 10 2 1 STRAINER AND NON RETURN VALVES 1 t v te the Temp r ry ff fun t n...

Страница 13: ...THERMOSTATIC CARTRIDGE 1 Disassemble spout and faceplate refer to 10 2 1 Strainer And Non Return Valves step 1 2 Turn the s t ng v ves t C O E p s t n 3 Break remove the plastic lock in the center of...

Страница 14: ...be re installed by screwing into the mixer body until it reaches a firm stop and tightened The cartridge should be tightened to a torque of 15Nm Re install or install new plastic lock Note Plastic loc...

Страница 15: ...lve fails to shut down or fails to maintain its set temperature then refer to Troubleshooting section 5 Year Maintenance Procedure Every five years the thermostatic mixer needs to have a full service...

Страница 16: ...without the faceplate 3 Insert spout without faceplate and flange and secure 4 Using wrench size 23mm untight the tightening ring t v te the C nt nu us run fun t n and using wrench 16mm adjust the te...

Страница 17: ...ource not found if the mixer malfunctions or should the test results fail to fall within the specified limits consider replacing the cartridge with a new one see section 11 3 Important Notes On Debris...

Страница 18: ...ridge and carry out an inspection 11 4 MAINTENANCE CLEANING On a regular basis the anti splash nozzle should be inspected and cleaned if necessary This should be done immediately before sterilising is...

Страница 19: ...n it 180 direction not important Place the warning tag in the keys gr ve t v te C nt nu us run Function See section 7 2 SENSOR SETTING INSTRUCTIONS WARNING Spout and water temperature flowing out from...

Страница 20: ...he correct connections The thermostatic mixing valve will not shut down The hot to cold mix temperature differential is not 10 C or greater Thermostatic cartridge contains debris or is damaged Non ret...

Страница 21: ...wn on the schedule in the m nuf turer s w rr nty Dur ng the w rr nty per d v n Eng neer ng w rep e r rep r ny defective products manufactured by Galvin Engineering without charge so long as the terms...

Страница 22: ...ter Pressure _______kPa Make of Mixing Valve _______________________ Model No ________________________ Size __________________ Valve Location Building _________________________________________________...

Страница 23: ...oning Work It is hereby certified that all the commissioning work has been carried out by the undersigned in accordance with the requirements of the Codes of Practice indicated prior Date of Valve Com...

Страница 24: ...Water C One Outlet in Use All Req d Outlets in Use One Outlet in Use All Req d Outlets in Use 1 2 3 4 5 6 7 8 9 10 11 Give details of brand and model designation Commensurate with the design flow rat...

Страница 25: ..._________________________Signature ______________________ Date _______________________ Maintenance Tests Yes Date of Previous Service ______________________________________________ Previous Service ca...

Отзывы: