background image

 

© Galvin Engineering Pty Ltd 

 

Product Installation Guidelines 

Document No.: 001.00.10.24 

Version 1, 19 October 2022, Page 

1

 of 

24

 

 
 
 
CliniMix

®

 CMV2 Wall Mounted Hands Free POU,  

Wave on/off sensor with Temp. Monitoring 

 
PRODUCT CODE:

 

 

 

 

100.41.11.20 

– CP Faceplate

 

100.41.11.30 

– Glass Faceplate

 

 

TABLE OF CONTENTS 

1.0

 

INTRODUCTION 

2

 

2.0

 

SAFETY 

2

 

3.0

 

DESCRIPTION 

2

 

4.0

 

DIMENSIONS 

2

 

4.1

 

TECHNICAL DATA 

3

 

4.2

 

SENSOR DETAILS 

3

 

5.0

 

WATER SUPPLY CONDITIONS 

3

 

5.1

 

INTRODUCTION 

3

 

5.2

 

SUPPLY PRESSURE REQUIREMENTS 

3

 

6.0

 

PRE-INSTALLATION 

4

 

7.0

 

INSTALLATION 

5

 

7.1

 

OPERATION AND TESTING 

8

 

7.2

 

SENSOR SETTING INSTRUCTIONS 

8

 

8.0

 

COMMISSIONING 

9

 

9.0

 

OPERATION 

11

 

10.0

 

SERVICING 

11

 

10.1

 

FREQUENCY OF REGULAR SERVICING 

11

 

10.2

 

GENERAL SERVICING 

12

 

10.2.1

 

STRAINER AND NON-RETURN VALVES 

12

 

10.2.2

 

THERMOSTATIC CARTRIDGE 

13

 

11.0

 

MAINTENANCE 

15

 

11.1

 

MIXED WATER TEMPERATURE ADJUSTMENT 

15

 

11.2

 

REMOVAL AND INSPECTION OF CARTRIDGE 

17

 

11.3

 

IMPORTANT NOTES ON DEBRIS 

17

 

11.4

 

MAINTENANCE CLEANING 

17

 

12.0

 

DISINFECTION 

18

 

13.0

 

TROUBLESHOOTING 

19

 

14.0

 

WARRANTY 

20

 

 

 
 
 
 
 
 
 
 
 
 
 

                        

          

Содержание 100.41.11.20

Страница 1: ...TER SUPPLY CONDITIONS 3 5 1 INTRODUCTION 3 5 2 SUPPLY PRESSURE REQUIREMENTS 3 6 0 PRE INSTALLATION 4 7 0 INSTALLATION 5 7 1 OPERATION AND TESTING 8 7 2 SENSOR SETTING INSTRUCTIONS 8 8 0 COMMISSIONING...

Страница 2: ...es with the requirements of AS 4032 4 Thermostatic Mixing Valves Self draining spout design Unique hygiene flush feature for in situ disinfection Remote activation and mixed water temperature monitori...

Страница 3: ...G must be followed 5 2 SUPPLY PRESSURE REQUIREMENTS This mixer is designed to be installed on all types of plumbing systems Hot and cold water supply pressures should be reasonably balanced however th...

Страница 4: ...MOUNTING DETAILS WALL PREPARATION 1 Cut out hole in wall as per dimensions shown below The depth of the hole must be between 75 and 95mm from the finished wall face 2 Drill four holes located as per...

Страница 5: ...s nstru t ns T h eve pt mum performance from the valve it is recommended that the inlet pressures are balanced to within 10 of each other To ensure that the mixing valve operates correctly it is neces...

Страница 6: ...inside the box Using suitable fittings attach the box inside the wall Box must be leveled and installed parallel to the finished wall Ensure the box is not twisted Connect supplied inlets to the ther...

Страница 7: ...ixing valve body until it stops Tighten to a torque of 10Nm Attach frame using the screws removed from the installation cover Align the position of the back nut with the faceplate recess in frame and...

Страница 8: ...the spout before installing the outer spout Push spout to the end and lock with grub screw to secure Ensure the disinfecton key cover is fitted to the open hole as shown 7 1 OPERATION AND TESTING Afte...

Страница 9: ...peration restart electronics 1x app 2 sec till 1x extended function mode is active 2x a app 0 5 sec pulsing during active function 1x app 5 sec till 4x 1x sec Release and wait till 1x sec keep out of...

Страница 10: ...n following the isolation The volume of mixed water discharged for a period of between 5 35 seconds should be measured and should not exceed the maximum volume set out in the applicable standard or co...

Страница 11: ...p t p valve line strainer and non return v ve f tted t the h t nd d w ter supp y nes The n et f tt ngs supp ed w th e h TMV will ensure this requirement is met If the CliniMix Thermostatic Mixing Val...

Страница 12: ...ING General Servicing of the CliniMix CMV2 Wall Mounted Hands Free Point Of Use Thermostatic Mixers 10 2 1 STRAINER AND NON RETURN VALVES 1 Activate the Temp r ry ff fun t n f r the sens r See section...

Страница 13: ...THERMOSTATIC CARTRIDGE 1 Disassemble spout and faceplate refer to 10 2 1 Strainer and Non Return Valves step 1 2 Turn the s t ng v ves t C O E p s t n 3 Break remove the plastic lock in the center of...

Страница 14: ...installed by screwing into the mixer body until it reaches a firm stop and tightened The cartridge should be tightened to a torque of 15Nm Re install or install new plastic lock Note Plastic locks are...

Страница 15: ...the s me pr edure s the nnu nten n e Pr edure sted p us the therm st t m xer rtr dge must be replaced After replacing the thermostatic mixer cartridge a thermal shut down test is performed and the te...

Страница 16: ...in direction marked on the body When the mixing temperature is set holding the adjustment rod tight the tightening ring to prevent changing the adjustment t p the C nt nues run fun t n Note Turning th...

Страница 17: ...tion 8 0 Commissioning Record the mixed water temperature 11 3 IMPORTANT NOTES ON DEBRIS Although this product is protected by built in filters debris can still find its way to the thermostat housing...

Страница 18: ...n it 180 direction not important Place the warning tag in the keys gr ve t v te C nt nu us run Function See section 7 2 Sensor Setting Instructions WARNING Spout and water temperature flowing out from...

Страница 19: ...he correct connections The thermostatic mixing valve will not shut down The hot to cold mix temperature differential is not 10 C or greater Thermostatic cartridge contains debris or is damaged Non ret...

Страница 20: ...shown on the schedule in the manufacturer s w rr nty Dur ng the w rr nty per d v n Eng neer ng w rep e r rep r ny defective products manufactured by Galvin Engineering without charge so long as the te...

Страница 21: ...ter Pressure _______kPa Make of Mixing Valve _______________________ Model No ________________________ Size __________________ Valve Location Building _________________________________________________...

Страница 22: ...sioning Work It is hereby certified that all the commissioning work has been carried out by the undersigned in accordance with the requirements of the Codes of Practice indicated prior Date of Valve C...

Страница 23: ...rm Water C One Outlet in Use All Req d Outlets in Use One Outlet in Use All Req d Outlets in Use 1 2 3 4 5 6 7 8 9 10 11 Give details of brand and model designation Commensurate with the design flow r...

Страница 24: ...____________________________Signature ______________________ Date _______________________ Maintenance Tests Yes Date of Previous Service ______________________________________________ Previous Service...

Отзывы: