background image

7

OPERA

OPERA

OPERA

OPERA

OPERATOR CONTROLS      2

TOR CONTROLS      2

TOR CONTROLS      2

TOR CONTROLS      2

TOR CONTROLS      2

2-4

Combistream and Combi 65 Expansion Relief

2-4.1  Tundish

The Combi boiler’s hot water system has two TPR valves, one for the hot water storage
cylinder and one for the incoming cold supply.  In the event of pressure within the hot
water or incoming cold supply becoming too high, either of the TPR valves will vent.
A Tundish should be fitted and located in the same space or compartment as the hot
water storage cylinder.  This device provides an air break when pressure is being vented.
When pressure is being vented water/steam will be evident at the Tundish and from the
discharge pipe of the Tundish.
Cold water will normally only discharge when there is an increase in pressure caused by
loss of air pressure in the Accumulator.
In the event of water/steam being seen at the discharge pipe or Tundish, do the
following:-
1. Turn ON a hot and cold tap to relieve the pressure.
2. Turn OFF the Heating System.
3. Investigate possible cause for high pressure e.g.:-

i Hot Water Thermostat Control is set too high.
ii Mains water is not on or fully on.
iii Restriction in hot water pipework.
iv Loss of air pressure in the Accumulator.

4. Contact the installer before restarting the system.

2-4.2  Heating TPR Valve

Combi boilers have a Heating TPR valve mounted on top of the Heat Exchanger and
discharging to the rear of the Boiler.  In the event of the pressure within the heating
system becoming too high the TPR valves will vent.
In the event of water/steam being seen at the discharge pipe or Tundish, do the
following:-
1. Check that the radiators are turned on, the heating system should never be operated

with all radiators OFF.
If all radiators are fitted with thermostatic valves, these can all be in a shut condition
if the temperature in the dwelling is sufficient.  In this circumstance the heating
system should have a bypass that should be open - see 6-1.3.

2. Turn OFF the Heating System.
3. Investigate possible cause for high pressure e.g.:-

i Boiler Thermostat Control is set too high.
ii Air in the system.

4. Contact the installer before restarting the system.

Fig. 2-4a  Tundish

AIR BREAK

DISCHARGE PIPE

Note
Either the Tundish or discharge pipe must
remain in view, do not box in or cover up.

Note
For more information see 6-2.12.

2-3

Combistream and Combi 65 Thermostatic Mixing Valve

The Mixing Valve will be positioned outside the Boiler case and may be in a different
location than the Boiler.  This valve mixes hot water from the Boiler with cold water to
provide hot water of a constant temperature at the taps.
The recommended maximum hot water temperature at the taps is 65ºC.
The recommended setting of the valve is between No.4 and 7 (49º to 63ºC).
The Mixing Valve is factory set to the following approximate mixed outlet temperatures:-

 Knob Position

Min

1

2

3

4

5

6

7

Max

 Output Temp. ºC

27º

32º

38º

44º

49º

53º

58º

63º

67º

Fig. 2-3a  Combistream Mixing Valve

22222

0

1

2

3

4

5

6

0

20

40

60

80

bar 

psi

Содержание 0100/150

Страница 1: ...Installation Section 5 Installation 5 1 Select and Option Internal Floor Standing 11 5 2 Select Internal Wall Mounted 12 5 3 Select External Wall Mounted 14 5 4 Select Free Standing External 16 5 5 Option Floor Standing System Boiler 18 Section 6 Installation Combistr Section 6 Installation Combistr Section 6 Installation Combistr Section 6 Installation Combistr Section 6 Installation Combistream ...

Страница 2: ...c i v r e S e c i v r e S e c i v r e S e c i v r e S e c i v r e S e c i v r e S e c i v r e S 1 1 Installer 1 2 Householders Information 1 3 Service History Note The price of fuel has seasonal fluctuations and varies from supplier to supplier You are advised to shop around for a good deal USER INFORMA USER INFORMA USER INFORMA USER INFORMA USER INFORMATION 1 TION 1 TION 1 TION 1 TION 1 DO NOT in...

Страница 3: ...o 23 5 23 5 to 27 6 26 4 to 34 9 29 3 to 44 0 Combistream Combi 65I Combi 65E Model C40 65 Model C40 65E Btu hr x 1000 40 to 65 Btu hr x 1000 40 to 65 kW 11 7 to 19 1 kW 11 7 to 19 1 Select Wall Mounted Internal Model W40 50I W50 80I Btu hr x 1000 40 to 50 50 to 80 kW 11 7 to 14 7 14 7 to 23 4 Select Wall Mounted External Model W40 50E W50 80E Btu hr x 1000 40 to 50 50 to 80 kW 11 7 to 14 7 14 7 t...

Страница 4: ...nter Heating and Hot Water 80 C 2 Summer Hot Water only 65 C A setting below 60 C can on some heating systems induce corrosion and reduce the life of the Boiler 2 1 Control Panel Select Combistream and Combi 65 Select and Internal Wall Fig 2 1a Control Panels HIGH LIMIT THERMOSTAT MANUAL RESET OPTIONAL HINGED FLAP HELD CLOSED BY A PUSH OPEN PUSH SHUT MAGNET HIGH LIMIT THERMOSTAT MANUAL RESET OPTIO...

Страница 5: ...nd Combistream Boilers Boilers fitted with Manual Reset High Limit Thermostats will not restart automatically after overheating has occurred The Limit Indicator Lamp is OFF when the Boiler is operating normally If the Lamp is ON the water within the Boiler is or has overheated i e the High Limit Thermostat of the Boiler control is tripped When the Limit Lamp is ON High Limit Thermostat tripped the...

Страница 6: ...UAL RESET 2 1 8 Hot Water High Limit Thermostat With Manual Reset A Hot Water High Limit Thermostat with an integral Manual Reset button is fitted to the Boiler When the Hot Water High Limit Thermostat has tripped the Boiler shuts down and will not restart automatically The Limit lamp 2 1 6 will not be on as this is only for the Heating High Limit To reset after hot water overheating has occurred ...

Страница 7: ... to the rear of the Boiler In the event of the pressure within the heating system becoming too high the TPR valves will vent In the event of water steam being seen at the discharge pipe or Tundish do the following 1 Check that the radiators are turned on the heating system should never be operated with all radiators OFF If all radiators are fitted with thermostatic valves these can all be in a shu...

Страница 8: ...N To set Boiler for operation 3 1 1 Boiler Operation The Boiler Thermostat switches power to the Burner ON and OFF in response to the temperature of the water within the Heat Exchanger The Burner will automatically fire when the water temperature within the Boiler falls below the thermostat control setting and will continue to run until the water temperature rises to the set C The Burner has its o...

Страница 9: ...sequence After 15 seconds the Burner should fire normally If the Burner does not fire the lockout symptoms will persist and the Burner control box Reset button will again glow 4 Wait at least 45 seconds and press the lockout button on the control box again IMPORTANT If the Boiler fails to start on the second attempt then Switch off the Electricity Supply Refer to Section 12 Fault Finding DO NOT AT...

Страница 10: ...s 5 Sound levels in small rooms may appear more intrusive than the same sound pressure in a larger room 6 Some building materials can tend to amplify the sound from Wall Mounted Boilers using battens to space the Boiler off the wall may reduce this effect 4 2 2 The Hearth Floor Standing The hearth temperature of Select and Option Boilers is less than 85 C A suitable level hearth which is imperviou...

Страница 11: ...on either side on the top of the Boiler heat exchanger see fig 5 1c The mains electricity supply preferably from a spur switched and fused 5 amp socket should enter the Boiler casing through one of the holes or knockouts provided A plug is provided for connection to the mains supply The plug fits into the mains connection on the underside of the Control Panel Select The Burner has cable and plug t...

Страница 12: ...ll for oil pipes fire check valve and electric cable 7 Remove panel and accurately drill required holes and fit 3 rawl bolts into holes R 8 Remove required knockouts K from back panel For top entry flues ignor For top entry flues ignor For top entry flues ignor For top entry flues ignor For top entry flues ignore steps 9 to 16 and move onto 17 e steps 9 to 16 and move onto 17 e steps 9 to 16 and m...

Страница 13: ...referably from a spur switched and fused 5 amp should enter the Boiler casing through one of the holes or knockouts provided see fig 5 2c The Burner is supplied with a 4 wire cable and plug The plug fits into the Burner supply socket on the Control Panel A 3 pin plug is provided for connection to the mains supply This plug fits into the socket in the rear of the Control Panel IMPORTANT Do not trap...

Страница 14: ...e can be wall mounted at ground level however the following conditions must be considered 1 A terminal guard must be fitted not supplied 2 A 50mm free air space must be provided under the Boiler 3 The Burner is supplied for two pipe operation and will probably require changing to single pipe operation 4 Protection against rodent intrusion is essential SERVICE DOOR W40 80E SHOWN Fig 5 3a Service Ac...

Страница 15: ...te Before removing main case study the Burner position and the Boiler wall position and decide on the best oil pipe configuration see Section 5 3 6 and Section 7 K x 2 R R R K R 3 HOLES DRILL 12Ø FOR RAWL BOLTS K KNOCKOUT POSITIONS Fig 5 3c Drilling Positions W W W W WARNING ARNING ARNING ARNING ARNING The weight of the Boiler Heat Exchanger bare is 50kg 110 lbs it is a two person job to lift it i...

Страница 16: ...ncoming pipes should enter the Boiler through the cut outs provided in the bottom panel as shown 5 4 3 Base Details See fig 5 4b The Base must be level impervious to kerosene and non combustible Pipes must be fully protected and insulated Cables must be suitable for outside and or underground use Note For Service Access see p 14 Connecting Control Panel see p 15 A 4 pin plug is provided for connec...

Страница 17: ...OFF VALVE FILTER SUPPLIED WITH BOILER SEE SECTION 13 Fig 5 4c Recommended Two Pipe Oil Connection 1 2 4 3 1 OIL SUPPLY 2 ELECTRICAL SUPPLY 3 FLOW AND RETURN PIPES FULLY INSULATED 4 RAWL BOLTS FOR BOILER FIXING Fig 5 4b Base Details Fig 5 4d External Boiler Flue Assembly SEAL FITTED INSIDE TERMINAL SCREWS X 4 MAIN CASE FLUE BEND FLUE TERMINAL GASKET FIT FLUE GUARD IF APPLICABLE 5 4 5 Fitting the Fl...

Страница 18: ...R FLOW RETURN OPTIONAL EXTRA PUMP ON RETURN FOR LARGER SYSTEMS COLD MAINS FEED 7 5 1 PUMP 2 PRESSURE GAUGE 3 PRESSURE RELIEF VALVE 4 PRESSURE VENT 5 EXPANSION VESSEL 6 AIR VENT 7 FILLING LOOP Note No other pump should be fitted to the system 2 bar 1 3 4 0 5 5 Option Floor Standing System Boiler OS60 80 OS80 95 OS90 120 OS100 150 5 5 1 Boiler Arrangement 4 3 1 2 5 COOLED RETURN EITHER SIDE HOT FLOW...

Страница 19: ...es OS100 150 20 litres for maximum system expansion of 18 litres The expansion vessel supplied is suitable for systems with a static head of up to 5 metres If the static head is greater than 5 metres the charge pressure of the expansion vessel will need to be increased Increase the pressure using a standard car tyre pump and pressure gauge when the system is empty zero pressure Expansion vessels a...

Страница 20: ...vessel should be set at 0 5 Bar below the cold fill pressure This should be done prior to filling the system using a conventional car tyre gauge and pump IMPORTANT The pressure of the expansion vessel cannot be checked when there is water in the system 5 5 12 Filling the System 1 Switch OFF electrical supply to the Boiler 2 Check all drain cocks are closed 3 Check spare sockets on the Boiler are p...

Страница 21: ... WAY MOTORISED VALVE 6 HEATING SYSTEM EXPANSION VESSEL 7 HOT WATER SYSTEM EXPANSION VESSEL 9 MIXING VALVE 8 BOILER BURNER 6 1 2 The Combistream System BYPASS MAINS SUPPLY OUTSIDE TAP DOUBLE CHECK VALVE 33 STOP COCK 33 HOT AND COLD TAPS COLD FEED TO BOILER 22mm copper HOT WATER FEED 22mm copper HEATING RETURN 1 BSP HEATING FLOW 1 BSP HOT WATER TPR DISCHARGE Tundish 15mm to 22mm PRESSURE REGULATING ...

Страница 22: ...vided for the Boiler when it is sited in a garage or outhouse when it is sited in a garage or outhouse when it is sited in a garage or outhouse when it is sited in a garage or outhouse when it is sited in a garage or outhouse All components must be fitted inside the dwelling All components must be fitted inside the dwelling All components must be fitted inside the dwelling All components must be f...

Страница 23: ...ill pressure it means that the system requires topping up 6 2 3 Pump The pump is a standard 3 speed central heating circulating pump which pumps the heated water from the Boiler through the heating system and hot water system Normally the pump will be set at speed 2 The pump is wired so that it is ON at all times when the control system is set for heating ON ON when the control system is set for h...

Страница 24: ...r cylinder A 15mm bypass pipe with an isolating valve is fitted in the event of the plate heat exchanger becoming blocked e g excessive scale then the valve can be opened and hot water will still be produced although with less efficiency To maintain efficient operation the plate heat exchanger must be free of scale it is therefore essential to have a scale prevention device fitted and in areas kno...

Страница 25: ... ball that is visible through the yellow bowl of the unit when this ball reaches the bottom of the cartridge it indicates that the cartridge should be replaced The Cleanstream unit should be fitted to the incoming main before the Accumulator and after any drinking water outlets as shown in fig 6 2d When a water softener is fitted the Cleanstream unit should not be necessary To enable cartridge cha...

Страница 26: ...tion G3 specific details of Tundish installation e z i s t e l t u o e v l a V o t e p i p e g r a h c s i d f o e z i s m u m i n i M h s i d n u T 1 D1 D1 D1 D1 D e p i p e g r a h c s i d f o e z i s m u m i n i M h s i d n u T m o r f 2 D2 D2 D2 D2 D d e w o l l a e c n a t s i s e r m u m i x a M t h g i a r t s f o h t g n e l a s a d e s s e r p x e s d n e b r o s w o b l e o n e i e p i p...

Страница 27: ... to move 6 3 4 Connecting the Control Panel Combi Boilers are despatched with the Control Panel fitted The phials of the two heating thermostats are inserted vertically into the pockets situated on either side on the top of the Boiler heat exchanger The phials of the two hot water thermostats are inserted horizontally in the hot water cylinder see fig 6 3c Connections have to be made for the remot...

Страница 28: ...torage Tanks 7 1 1 Size and Siting of Tank The size and site of the tank should be chosen to be least obtrusive with consideration to the following 1 Access for fuel delivery vehicles 2 Distance of tank from the road Most delivery vehicles can deliver up to 30m 3 To obtain discounts on fuel it is normally required to purchase a delivery of 500 gallons 2 300 ltrs therefore a 2 500 ltr tank is ideal...

Страница 29: ...stem 7 3 1 Single Pipe System Tank Above Burner Where installations have the bottom of the tank above the Oil Burner a single pipe system can be used see fig 7 3a Fig 7 3a Typical Single Pipe Oil System Tank Above Burner MAX OIL LEVEL 4 metres ABOVE BURNER SHUT OFF VALVE FILTER THE OIL BURNER PUMP SHOULD BE SET FOR SINGLE PIPE OPERATION SEE 13 4 5 FIRE VALVE SENSOR FIXED ABOVE BOILER FIRE VALVE PL...

Страница 30: ...M OUTLET PLASTIC TANK ALSO SUITABLE SEE 7 1 2 BOTTOM OUTLET STEEL TANK ALSO SUITABLE SEE 7 1 3 LIFT 1M UP TO 4 0M TIGERLOOP 1 MAY BE ABOVE BURNER 2 MUST BE POSITIONED OUTSIDE BUILDING 3 MUST BE INSTALLED UPRIGHT Fig 7 3c Typical Arrangement for Tigerloop Oil System 7 3 4 Two Pipe System Where installations have the bottom of the tank below the Oil Burner pump it is necessary to install a two pipe ...

Страница 31: ...ical Conventional Flue with Brick Chimney CONVENTIONAL FLUE 100mm 4 ADAPTOR TEST POINT AIR DUCT TO BURNER FL FL FL FL FLOOR STANDING OOR STANDING OOR STANDING OOR STANDING OOR STANDING not 190 240 240 270 CONVENTIONAL FLUE 100mm 4 ADAPTOR WALL MOUNTED WALL MOUNTED WALL MOUNTED WALL MOUNTED WALL MOUNTED Fig 8 1b Flue Adaptor INFORMATION SUPPLIED BY OFTEC FOR FUR FOR FUR FOR FUR FOR FUR FOR FURTHER ...

Страница 32: ... Flat Roof Flashings packed separately 160 to 350 LLR100 160 to 350 150 LLE EXS EXT EXL LLR075 100 B AØ Extensions Kit 590 to 790 B AØ 590 to 790 150 LLE Extensions LLR075 LLE075 100 Kit LLR100 EXS100 EXS EXT EXL 1600 to 2110 C AØ HLR100 VBC100 1760 to 2280 150 Extensions HLR075 VBC075 240 to 440 B 240 to 440 For Vertical and Horizontal Kit EXS EXT EXL EXS EXT EXL EXS EXT EXL 1600 to 2110 C AØ 176...

Страница 33: ...nternal or external corner 300 600 G Above ground or balcony level 300 H From a surface or a boundary facing the terminal 600 J From a terminal facing the terminal 1200 K Vertically from a terminal on the same wall 1500 L Horizontally from a terminal on the same wall 750 M Above the highest point of an intersection with the roof 600 N From a vertical structure to the side of the terminal 750 O Abo...

Страница 34: ...n Compartments 9 3 2 Burner Air Duct All Floor Standing Boilers are supplied with an adaptor and flexible air duct fitted for conventional flue connection For balanced flue applications the conventional flue adaptor has to be removed the air duct is then reconnected to the balanced flue Internal Wall Mounted Boilers are supplied with the flexible air duct ready to connect to a balanced flue Always...

Страница 35: ...ies are found This will damage the Burner pump 10 1 2 Two Pipe Oil Supply System Check that a non return valve is fitted in the suction line refer to fig 7 3d page 30 The return pipe should have an anti syphon cut made just inside the top of the oil tank This pipe must then continue to within 50mm of the bottom of the tank preferably not near the sludge end 10 1 3 The Boiler Check that an imperfor...

Страница 36: ...und terracotta pot has been used and that the draught stabiliser is working freely if fitted Check that the flexible air duct is correctly fitted from the adaptor to the Burner Check that the test point bolt is fitted in the adaptor 10 1 6 Balanced Flues Check all balanced flues for their positioning and that the installation complies with details in this manual Check that the flexible air duct is...

Страница 37: ... Test holes are provided for all flues Check the smoke reading with the Boiler up to temperature and then measure the CO and flue gas temperature Reducing air into the Burner decreases the flue gas temperature and increases the CO See Section 13 4 for typical Burner settings and test data IMPORTANT DO NOT drill any test holes in balanced flues Any test hole drilled in a conventional flue must be p...

Страница 38: ... size for output required see 13 3 2 In very dusty conditions the fan and photocell may need cleaning Flexible oil lines should be carefully inspected It is recommended that flexibles are renewed every two years If in any doubt fit new 11 1 1 Boiler All Boilers have a flueway door giving access to remove baffles Baffles should be lifted out to enable the heat exchanger to be thoroughly vacuumed cl...

Страница 39: ...istorted the Boiler efficiency will be drastically reduced Baffles should be removed cleaned and replaced during routine servicing Care should be taken when replacing baffles to ensure that they are correctly fitted Fig 11 4a shows the right and wrong way of fitting some baffles IMPORTANT All baffles must be fitted All baffles must be correctly positioned Replace distorted baffles If baffles appea...

Страница 40: ...60 80 O60 80 O60 80 O60 80 O60 80 O60 80 S80 95 S80 95 S80 95 S80 95 S80 95 O80 95 O80 95 O80 95 O80 95 O80 95 S90 120 S90 120 S90 120 S90 120 S90 120 O90 120 O90 120 O90 120 O90 120 O90 120 S140 190 S140 190 S140 190 S140 190 S140 190 O140 190 O140 190 O140 190 O140 190 O140 190 S190 240 S190 240 S190 240 S190 240 S190 240 O190 240 O190 240 O190 240 O190 240 O190 240 S240 270 S240 270 S240 270 S2...

Страница 41: ... t r e w o p k c e h C 3 s e Y l a m r o N g n i k r o w r e l i o B e h t s I r o g n i l b b u b g n i k a m t u b e s i o n g n i l g r u g s e Y t l u a F m e t s y s e h t n i r i a s i e r e h t t a h t s e t a c i d n i s i h T s r o t a i d a r e h t d e e l B 1 e v l a v l l a b e h t r e t a w f o l l u f s i t f o l e h t n i k n a t r e d a e h e h t t a h t k c e h c e l b a e r a u o...

Страница 42: ... r o t s i s e r o t o h p k c e h C 1 e d a r g t c e r r o c f o d n a t n e i c i f f u s s i y l p p u s l e u f k c e h C 2 t n e s e r p s i r e t a w o n d n a r e n r u B o t w o l f e e r f h t i w n a e l c s i r e t l i f e h t t a h t k c e h C 3 g n i n e p o r e t t u h s r i a e c u d e r e p y t d n a e z i s t c e r r o c f o e l z z o n w e n t i F 4 d n a n u g e k o m s e g u a...

Страница 43: ... e c a l p e R 3 k c e h C r e e n i g n E n o i t u l o S e l b i s s o P t i m i l h g i h t a r e l i o B C 3 9 t a s r u c c o t i m i l e p i p w o l f r e l i o B f o e r u t a r e p m e t e h t k c e h C 1 V R T g n i k a e l g e s s e r g n i r i a r o f p m u p f o m a e r t s n w o d k c e h c t n e s e r p f I m e t s y s e h t n i r i a r o f k c e h C 2 m o r f g n i g r a h c s i d r...

Страница 44: ... n a n a n a n a n g n i c i v r e s t n o r F t n o r F d n a p o t g n i c i v r e s a n a n a n a n a n a n e s a b d e l o o c r e t a W e z i s e u l f d e c n a l a B m m 5 7 m m 5 7 m m 5 7 m m 5 7 m m 0 0 1 m m 0 0 1 m m 0 0 1 m m 5 2 1 m m 5 7 l a r g e t n I m m 5 7 l a r g e t n I m m 5 7 m m 5 7 m m 5 7 l a r g e t n I e u l f l a n o i t n e v n o C e z i s m m 0 0 1 m m 0 0 1 m m 0 0...

Страница 45: ... 1 x a M 13 3 Burner Setting Data The following Burner settings given for all Option Select and Wall Mounted Boilers are for Kerosene 28 Second Class C fuel For 35 Second Class D Gas Oil the following changes are required 1 Fit Burner pre heater 2 Raise pump pressure to 9 7 10 3 bar 140 150 psi 3 Lower nozzle size by 2 sizes W W W W Wall Mounted Boilers ar all Mounted Boilers ar all Mounted Boiler...

Страница 46: ...7 2 2 0 6 5 7 0 5 1 1 9 7 9 3 2 5 1 1 0 1 5 0 2 0 8 4 3 2 0 6 5 7 0 0 3 1 0 9 6 5 2 6 1 1 0 1 0 1 2 5 9 0 8 S 5 9 0 8 S 5 9 0 8 S 5 9 0 8 S 5 9 0 8 S 5 9 0 8 O 5 9 0 8 O 5 9 0 8 O 5 9 0 8 O 5 9 0 8 O 1 r o n i M r o x a M x a M x a M x a M x a M 0 8 4 3 2 0 6 5 7 0 0 3 1 0 9 6 5 2 3 1 1 0 1 0 1 2 8 7 5 5 8 9 4 2 0 6 5 8 0 0 1 9 6 3 7 2 5 1 1 0 1 0 1 2 n o N e l b a t s u j d A 0 9 4 6 2 0 6 5 8 0 ...

Страница 47: ...ven Note Always check electrodes settings after fitting nozzle Fig 13 4a Combustion Air Setting LOOSEN BOLT AND SLIDE ADJUSTMENT SPANNER SUPPLIED AIR NUMBER ON SCALE INDICATED BY THE END OF THE SLIDE 13 4 2 Combustion Head Setting Minor Series Burners 13 4 3 Nozzle Electrode Settings Minor Series Burners TURN SCREW TO ADJUST SETTING MEASURE SETTING AS SHOWN Fig 13 4b Combustion Head Setting Fig 13...

Страница 48: ... TION 13 TION 13 13 4 5 Combustion Air Setting Max Series Burners Note The recommended settings for the combustion head and combustion air are shown on pages 45 46 Settings should not differ greatly from the settings given Fig 13 4d Combustion Air Setting ROTATE SCALE TO ADJUST SETTING SET TO ARROW LOCK SCREW X 2 MAX MAX 1 MAX 12 ...

Страница 49: ...ORSE SHOE WASHER FITTED UNDER SCREW INLET Danfoss Type BFP 11 R3 RETURN PORT PLUGGED INLET PORT RETURN PORT Danfoss Type BFP 11 R3 SCREW FITTED WASHER REMOVED SINGLE PIPE OPERATION SINGLE PIPE OPERATION SINGLE PIPE OPERATION SINGLE PIPE OPERATION SINGLE PIPE OPERATION TWO PIPE OPERATION TWO PIPE OPERATION TWO PIPE OPERATION TWO PIPE OPERATION TWO PIPE OPERATION 13 4 7 Burner Oil Pump An ECOFLAM Bu...

Страница 50: ...L EARTH GY LIVE BR EARTH YG NEUTRAL BL MAINS PLUG Live Neutral and Earth to be wired to plug Fig 13 5a Wiring Diagram for Floor Standing Select and Wall Mounted Internal Fig 13 5b Wiring Diagram for Option Range 2 LIMIT STAT CONTROL STAT C 2 1 C L N BL BR GY BL GY R TO BURNER PREWIRED BR GY MAINS SOCKET PREWIRED BL L N GY REMO EMO EMO EMO EMOVE MAINS PL VE MAINS PL VE MAINS PL VE MAINS PL VE MAINS...

Страница 51: ...UG BEFORE REMO UG BEFORE REMO UG BEFORE REMO UG BEFORE REMOVING VING VING VING VING PANEL CO PANEL CO PANEL CO PANEL CO PANEL COVER VER VER VER VER Notes PERMANENT LIVE Required for frost protection OVERRIDE Runs Boiler pump for servicing MAINS CONNECTOR IN Normal Boiler operation Frost protection Boiler starts when temperature falls below 5 and stops when temperature rises above 14 MAINS CONNECTO...

Страница 52: ...OILER PUMP ROOM THERMOSTAT 1 R 1 2 3 4 5 6 7 8 9 10 11 12 R R EARTH STUD 2 N HTG 1 FROM TIME CLOCK YG Fig 13 5d Combistream and Combi 65 Internal Wiring Diagram Time Clock Connections 1 Hot Water ON 2 Hot Water OFF HTG Heating N Neutral Terminal Block Connections 1 Spare 2 Neutral 5 Earth 6 Time Clock Timed Heating REMO EMO EMO EMO EMOVE MAINS PL VE MAINS PL VE MAINS PL VE MAINS PL VE MAINS PLUG B...

Страница 53: ...1 Spare 2 Neutral 5 Earth 6 Time Clock Timed Heating REMO EMO EMO EMO EMOVE MAINS PL VE MAINS PL VE MAINS PL VE MAINS PL VE MAINS PLUG BEFORE UG BEFORE UG BEFORE UG BEFORE UG BEFORE REMO REMO REMO REMO REMOVING PANEL CO VING PANEL CO VING PANEL CO VING PANEL CO VING PANEL COVER VER VER VER VER Remove Link if not required 8 Spare 9 Time Clock Timed Hot Water OFF 3 Room Stat Neutral 6 Room Stat 7 Ro...

Страница 54: ...oiler 13 6 1 SELECT and OPTION Floor Standing 1 2 3 5 6 7 4 8 Fig 13 6b Wall Mounted m e t I t r a P s e t o N 1 e s o H d e t n u o m l l a w t s o m s a d e i l p p u s e r a s e s o h 2 m e t s y s l i o e p i p o w t a e v a h s r e l i o B 2 r e t l i F e l b a l i a v a e r a s t n e m e l e e r a p S 3 P S B x m m 0 1 4 2 m e t i r e t l i f g n i t c e n n o c r o f 2 1 m e t i s e s o h g...

Страница 55: ... r e n n a p S s g n i t t e s r i a d n a p m u p r e n r u B g n i t s u j d a r o F 7 r e n n a p S x o B e l z z o n r e n r u B g n i c a l p e r d n a g n i v o m e r r o F 8 p o o L g n i l l i F m e t s y s g n i t a e h f o g n i l l i f r o F 9 r a B 3 e v l a V g n i c u d e R e r u s s e r P y l p p u s s n i a m g n i m o c n i r o F 0 1 e v l a V k c e h C e l b u o D m m 2 2 y l p p...

Страница 56: ...P O N O I T P O N O I T P O N O I T P O 5 6 0 4 O 5 6 0 4 O 5 6 0 4 O 5 6 0 4 O 5 6 0 4 O 0 8 0 6 O 0 8 0 6 O 0 8 0 6 O 0 8 0 6 O 0 8 0 6 O 5 9 0 8 O 5 9 0 8 O 5 9 0 8 O 5 9 0 8 O 5 9 0 8 O 0 2 1 0 9 O 0 2 1 0 9 O 0 2 1 0 9 O 0 2 1 0 9 O 0 2 1 0 9 O 0 5 1 0 0 1 O 0 5 1 0 0 1 O 0 5 1 0 0 1 O 0 5 1 0 0 1 O 0 5 1 0 0 1 O 0 9 1 0 4 1 O 0 9 1 0 4 1 O 0 9 1 0 4 1 O 0 9 1 0 4 1 O 0 9 1 0 4 1 O 0 4 2 0 9 ...

Страница 57: ...0 Rawl Bolts K Knockouts for Electric Oil Pipes FULLY PUMPED SYSTEMS ONLY ALL DIMENSIONS ARE NOMINAL Fig 13 7b Thermecon Boilers Overall Dimensions INTERNAL L E D O M L E D O M L E D O M L E D O M L E D O M I 0 5 0 4 W I 0 5 0 4 W I 0 5 0 4 W I 0 5 0 4 W I 0 5 0 4 W I 0 8 0 5 W I 0 8 0 5 W I 0 8 0 5 W I 0 8 0 5 W I 0 8 0 5 W t u p t u O W k 7 4 1 7 1 1 4 3 2 7 4 1 h u t B 0 0 0 0 5 0 4 0 0 0 0 8 0...

Страница 58: ...ON 13 TION 13 TION 13 13 7 3 W40 50E W50 80E EXTERNAL Fig 13 7c Thermecon Boilers Overall Dimensions EXTERNAL FULLY PUMPED SYSTEMS ONLY ALL DIMENSIONS ARE NOMINAL L E D O M L E D O M L E D O M L E D O M L E D O M E 0 5 0 4 W E 0 5 0 4 W E 0 5 0 4 W E 0 5 0 4 W E 0 5 0 4 W E 0 8 0 5 W E 0 8 0 5 W E 0 8 0 5 W E 0 8 0 5 W E 0 8 0 5 W t u p t u O W k 7 4 1 7 1 1 4 3 2 7 4 1 h u t B 0 0 0 0 5 0 4 0 0 0...

Страница 59: ...Holes 12Ø for M10 Rawl Bolts 320 PLAN ON BASE Base must be level impervious to kerosene and non flammable 38 50 144 147 43 222 390 2 Slots 14 wide 2 Slots 25 wide SUGGESTED PIPE CONNECTION L E D O M L E D O M L E D O M L E D O M L E D O M E 0 5 0 4 X E F E 0 5 0 4 X E F E 0 5 0 4 X E F E 0 5 0 4 X E F E 0 5 0 4 X E F E 0 8 0 5 X E F E 0 8 0 5 X E F E 0 8 0 5 X E F E 0 8 0 5 X E F E 0 8 0 5 X E F t...

Страница 60: ...mm HEATING RETURN 1 BSP F F L F F L Right Side Left Side 135 F F L Rear Thermecon 700 F F L 20 20 HOT WATER FLOW 22mm COLD FEED TO BOILER 22mm HEATING FLOW 1 BSP HEATING RETURN 1 BSP Front HOT WATER TPR 15mm 705 SOCKET FOR CONVENTIONAL FLUE 45 810 HEATING TPR DISCHARGE 15mm M A E R T S I B M O C M A E R T S I B M O C M A E R T S I B M O C M A E R T S I B M O C M A E R T S I B M O C I 5 6 I B M O C...

Страница 61: ...ATER TPR 15mm 705 45 HEATING TPR DISCHARGE 15mm Fig 13 7f Thermecon Boilers Overall Dimensions Combi 65 External FULLY PUMPED SYSTEMS ONLY ALL DIMENSIONS ARE NOMINAL E 5 6 I B M O C E 5 6 I B M O C E 5 6 I B M O C E 5 6 I B M O C E 5 6 I B M O C r e l i o B 5 6 0 4 C r e l i o B 5 6 0 4 C r e l i o B 5 6 0 4 C r e l i o B 5 6 0 4 C r e l i o B 5 6 0 4 C t a e H r e g n a h c x E r e t a W t o H r ...

Страница 62: ...o h t i W S V n o i t c e S R L H t i K d r a d n a t S S L H t i K d r a d n a t S 0 2 1 0 9 5 9 0 8 0 8 0 6 5 6 0 4 5 7 0 C B V 5 7 0 R L H 5 7 0 C B V 5 7 0 R L H 5 7 0 C B V 5 7 0 R L H 5 7 0 C B V 5 7 0 R L H 5 7 0 C B V 5 7 0 R L H 5 7 5 2 1 0 1 1 2 o t 0 0 6 1 0 5 5 1 0 6 1 0 4 4 o t 0 4 2 0 4 7 o t 0 4 5 0 0 3 1 s e d u l c n i n o i s n e t x e 0 0 3 0 4 2 0 9 1 0 9 1 0 4 1 0 5 1 0 0 1 0 ...

Страница 63: ...ear Balanced Flue Dimensions SELECT OPTION RANGE SELECT SHOWN l e d o M t e l t u O e d i S e u l F A Ø B C D t i K d r a d n a t S a r t x e 1 h t i W n o i s n e t x E 0 0 3 s n o i s n e t x E e l b a l i a v A 0 2 1 0 9 5 9 0 8 0 8 0 6 5 6 0 4 5 7 0 E L L 5 7 0 R L L 5 7 0 E L L 5 7 0 R L L 5 7 0 E L L 5 7 0 R L L 5 7 0 E L L 5 7 0 R L L 5 7 0 E L L 5 7 0 R L L 5 7 0 0 1 5 5 7 0 6 1 0 8 7 o t ...

Страница 64: ...e V t u o h t i W S V n o i t c e S 0 2 1 0 9 5 9 0 8 0 8 0 6 5 6 0 4 5 7 0 B C V 5 7 0 L T V 5 7 0 B C V 5 7 0 L T V 5 7 0 B C V 5 7 0 L T V 5 7 0 B C V 5 7 0 L T V 5 7 0 B C V 5 7 0 L T V 5 7 5 2 1 0 2 1 5 7 0 3 o t 0 5 2 2 0 0 5 2 o t 0 0 2 2 0 0 3 0 5 9 0 0 6 0 4 2 0 9 1 0 9 1 0 4 1 0 5 1 0 0 1 0 0 1 B C V 0 0 1 L T V 0 0 1 B C V 0 0 1 L T V 0 0 1 B C V 0 0 1 L T V 0 0 1 B C V 0 0 1 L T V 0 0 ...

Страница 65: ...CUT TO LENGTH TELESCOPIC EXTENSIONS AVAILABLE 300MM FLUES CANNOT BE CUT TO LENGTH r a e R r o e d i S A B t i K R L H t i K S L H n o i s n e t x e o n h t i W I 0 5 0 4 W I 0 8 0 5 W 5 7 0 R L H 5 7 0 C H W 5 7 0 R L H 5 7 0 C H W 5 7 0 R L H 5 7 0 C H W 5 7 0 R L H 5 7 0 C H W 5 7 0 R L H 5 7 0 C H W 5 7 0 S L H 5 7 0 C H W 5 7 0 S L H 5 7 0 C H W 5 7 0 S L H 5 7 0 C H W 5 7 0 S L H 5 7 0 C H W ...

Страница 66: ...NGTH Terminal Section VTL Length 1120 Extra Extensions FLUE BRACKETS SCREWS 88 615 A 300mm SCREWS 300mm EXS 075 Extension included Ø125 Ø200 B PITCHED ROOF l a n r e t n I d e t n u o M l l a W A 0 0 3 h t i w t i K L T V d e i l p p u S n o i s n e t x E m m 0 5 9 x 1 s u l p t i K L T V n o i s n e t x E a r t x e I 0 5 0 4 W I 0 8 0 5 W 5 7 0 L T V 5 7 0 C H W 5 7 0 L T V 5 7 0 C H W 5 7 0 L T ...

Страница 67: ...5 7 0 S X E 5 7 0 R L H 5 7 0 S X E 5 7 0 R L H 5 7 0 S X E 5 7 0 R L H 5 7 0 S X E 5 7 0 R L H 5 7 0 S X E 5 7 0 R L H 5 7 0 S V 5 7 0 S V 5 7 0 S V 5 7 0 S V 5 7 0 S V 0 9 7 1 o t 0 9 1 1 m m 0 0 6 o t 1 s e d u l c n i n o i s n e t x E 5 5 0 1 13 8 8 Combistream and Combi 65I REAR SIDE 13 8 9 Combistream Accumulator Dimensions Fig 13 8j Cold Water Storage Accumulator Overall Dimensions 730 Ø 4...

Страница 68: ...oms where there is an Extractor Fan the following Building Regulations apply Part F F F F F England and Wales also recommended in Northern Ireland Part K K K K K Scotland The Control of Pollution Oil Regulations AP1 2 OFTEC OFTEC publish Technical Books that summarise and illustrate the requirements of the above Standards and Regulations OFTEC Oil Firing Technical Association Foxwood House Dobs La...

Страница 69: ...to damage caused by cuts and abrasions 3 Skin rashes oil Acne Immediately seek medical attention for any rash wart or sore developing on any part of the body particularly on the scrotum 4 As far as possible avoid any skin contact with mineral oil or clothing contaminated with mineral oil 5 Never breathe any mineral oil vapours Do not fire the Burner in the open i e out of the Boiler as misfire wil...

Отзывы: