21
ENGLISH
6 - START UP
1
TANK LID
2
TANK
3
POWER CABLE
4
ELECTRIC OUTLET
5
MAIN SWITCH
6
LEVEL CONTROL PLATE
7
LIGHT FOR WATER LACK LEVEL IN TANK
8
COFFEE SWITCH (WITH DISTRIBUTION AND
BOILER LOADING LIGHT)
9
BOILER MANOMETER
10
HOT WATER TAP
11
HOT WATER PIPE
12
VAPORIZER TAP
13
VAPORIZER PIPE
14
GROUP VACUUM UNIT
15
BASIN
16
FILTER HOLDER
Fig.6.01
- The self-level device will start at the same time as the relevant
light (Fig.6.01-pos.8), so that the water can reach the regular
level in the boiler. Only during the first loading, this operation
can take quite a long time and make the machine stop; in this
case switch off the machine and switch it on again by acting on
the main switch (Fig.6.01-pos.5).
After completing the machine preparation, proceed to the start up.
-
By positioning the main switch (Fig.6.02) on I the switch light
will turn on.
A
B
Fig.6.02
Fig.6.03
Warning !!
When the machine is new the filter-holder sump may not
be aligned (perpendicular to the machine itself) as shown
in the figure at the side, however this does not effect the
efficient function of the same.
After a short period of use the sump will gradually settle
into a correct position.
A = Position of closed filter-holder with new machine.
B = Position of closed filter holder with machine after a short
period of use.
-
Then wait until the machine reaches the operating pressure of
“1,2 - 1,3 BAR” by checking the boiler pressure on the
manometer (Fig.6.01-pos.9).
- The machine is now ready for use.
IMPORTANT: N°2 under-tile packings with are thinner
(8.1mm ) than that fitted as standard are included. These
packings may be used in the event of difficulty with insertion
of the filter holder.
Содержание TS
Страница 60: ...MARRONE BROWN ...