29
ENGLISH
6 - START UP
1
Tap
2
Hot Water Outlet Button D90
3
Hot Water Outlet Switch E90
4
Machine on/off indicator
5
Gas on/off valve
6
Main switch
7
Right Vaporiser Tap
8
Left Vaporiser Tap
9
Cup-warmer switch
10
Boiler pressure gauge
11
Pump pressure gauge
12
Boiler level indicator
13
Right Vaporiser Pipe
14
Left Vaporiser Pipe
15
Hot Water Outlet Pipe
16
Unit D90 Control Keyboard
17
Unit E90 Control Keyboard
18
Hot Water Outlet Indicator
19
D90 Delivery Led
20
E90 Delivery Led
Once the water, gas and electrical connections have been made,
proceed to start up the machine.
Open the mains water supply tap (A).
Close the protection switch (D)
Position the machine main switch (8) to position
the machine
on indicator will come on (3).
The auto-levelling device will come into operation so that the water
reaches a normal level in the boiler (12). Also press lever of water
supply tap (1) for a faster operation.
Position the main switch (6) to position
for operation at
normal power or to position for operation at full power, thereby
powering the resistances.
Wait for the pressure to reach its operational pressure 1.1
÷
1.3 atm
checking the boiler pressure on the gauge (10).
Should the machine fail to stabilize on the indicated values it is
necessary to calibrate the pressure switch as described in paragraph
6.2.
In the event of a machine featuring a gas heating system, it is
necessary to switch on the gas by operating the gas valve (4) after
operating the main switch (6), keeping the piezoelectric switch
pressed (5) until the gas remains on.
Then check the pressure on the pump gauge (11) putting a unit into
operation with filter holder engaged filled with ground, dosed and
pressed coffee in order to achieve an effective working pressure of
8/9 atm.
Should re-calibration of the pump pressure be necessary this
operation should be undertaken as indicated in paragraph 6.3.
The machine is now ready for use.
6.1
LONG COFFEE GIGLEUR
The machine is fitted with a gigleur ( 1 per unit) with a clearance of
0.6 mm (Cod.26G0074/01).
For greater coffee delivery speed, in the case of long coffees, no.2
gigleurs are also included with the machine (complete with seals)
with a clearance of 0.8 mm (Cod.26G0073/01).
The gigleur is located in the exchanger supply fitting (1 per group).
IMPORTANT
Do not press the hot water delivery switch or button (2)
before the correct working temperature of 1.1 atm is
reached, as indicated on the boiler gauge (10).
5
4
12
1
2
17
20
18
19
16
10
7
6
13
14
15
11
8
3
9
Fig.6.01
Fig.6.02