background image

 

Rev. 9/11 

 

FILLING AND BLEEDING INSTRUCTIONS

 

 

WARNING: 

DO NOT CYCLE TOOL WITHOUT AIR BLEEDER, OR THE SCREW AND STAT-O-SEAL, INSTALLED IN TOOL HEAD.  

 

SEVERE PERSONAL INJURY MAY RESULT. 

 

CAUTION: 

BEFORE FILLING HANDLE, AIR PISTON SHOULD BE ALL THE WAY DOWN.  

 

 CAUTION: 

 

WHEN FORCING PISTON ROD ASSEMBLY DOWNWARD WITH HEAD CYLINDER ASSEMBLY REMOVED,  

 

 

HYDRAULIC FLUID WILL EJECT FORCIBLY FROM HANDLE. 

 

 

 

 

 

 

 

To replace a small amount of oil in the tool follow steps 19 and 20 below. 
 
Should it become necessary to completely refill the tool (as would be required after tool has been dismantled and reassembled), take 
the following steps after depressing trigger

 

AND DISCONNECTING THE AIR SUPPLY:

 

  
  1. Ensure air piston is at the full bottom of stroke by pushing power piston rod down. 
  2. Fill power cylinder and oil passage to the top. 
  3. Place gasket and o'ring on top of the handle. 
  4. Push head piston in head cylinder until it stops. 
  5. Press head cylinder down on top of handle, being careful not to tear o'ring on top of power cylinder, install screws and tighten 

evenly.  

  6. Remove front screw and seal from top of head. Attach 4oz. bottle assy (745163). 
  7. Squeeze bottle gently until no air rises into bottle. (Be careful not to move head piston when filling with oil).  
   8. Remove 4oz. bottle assy. (745163) from front hole. Replace screw and stat-o-seal. Remove rear screw and  
 

stat-o-seal and attach 4 oz. bottle assy. (745163) Repeat step 7. 

  9. Remove 4oz. bottle assy. (745163) from rear hole, install screw and stat-o-seal. 
10. Reattach 4oz. bottle assy. (745163) to front bleeder hole and connect to air. 
11. Cycle tool 10 times holding trigger down for 5 seconds between cycles. 
12. Remove 4oz. bottle assy. (745163), replace screw and stat-o-seal.  
13. Cycle tool 5-6 times and check stroke of .500 (see below), We recommend using a pair of dial calipers.  With the trigger released, 

check dimension (A).  Holding trigger down check dimension (B).  Subtract dimension (A) from dimension (B).  If stroke is not 
consistent within 1/64" (.0156) follow steps 14-21. If stroke checks O.K. and piston comes completely forward (see below) the 
bleeding procedure is complete.  

14. Disconnect air while piston is in rear position. 
15. Remove screw and stat-o-seal from both front and rear holes. 
16. Gently push piston in until it stops. 
17. If fluid is not at top of rear hole, attach 4oz. bottle (745163) and repeat step 7. 
18. Remove 4oz. bottle assy. (745163), replace rear screw and stat-o-seal. 
19. Attach 4oz. bottle assy. (745163) to front hole, connect air. 
20. Cycle 10 times, remove 4oz. bottle assy. (745163), replace screw and stat-o-seal. 
21. Repeat step 13. 

'A'

.190 (4.8mm)

'B'

.690 (17.5mm)

Содержание GB730

Страница 1: ...E BILT MADE IN U S A GAGE BILT Inc 44766 Centre Court 586 226 1500 Clinton Twp MI 48038 586 226 1505 Fax e mail solutions gagebilt com www gagebilt com GAGE BILT TOOLS ARE AVAILABLE WORLDWIDE E MAIL US FOR A DISTRIBUTOR NEAR YOU ...

Страница 2: ...o Hazards Found TABLE OF CONTENTS Description Page Warnings 3 Principle of Operation 4 How to use the GB730 5 Description Operation and Maintenance 6 Filling and Bleeding 7 Troubleshooting and Overhaul 8 Parts Lists 9 10 DEXRON III Oil Safety Data 11 Nose Assembly Selection Chart 12 EU Conformity and Warranty 13 7 30 185 4mm 4 69 119 1mm 4 12 104 6mm 1 90 48 3mm 11 67 296 4mm 5 07 128 8mm 3 88 Ø 9...

Страница 3: ... ON ANY PROPOSED MODIFICATION WARNING Be sure there is adequate clearance for tool and operator s hands before proceeding Keep fingers clear of any moving parts Keep fingers clear from fasteners and installed materials Severe personal injury may result WARNING It is required to use hearing protection A test was carried out in a simulated work environment where the background level was 73 2 DBA In ...

Страница 4: ...nt side of the cylinder head causing the piston to move to the rear of the cylinder head The oil from the rear of the head cylinder is directed to the top of the piston rod assembly inside the power cylinder The internal components of the attached nose assembly are also moving with the piston to start the fastener installation When the fastener installation is completed the trigger is released Air...

Страница 5: ...pping plug from Swivel A 249 and screw in your air fitting 2 Attach Deflector 752122 to rear of Cylinder Head Assembly 730398 WARNING ROTATE DEFLECTOR AWAY FROM OPERATOR AND OTHER PERSONS WORKING IN THE VICINITY 3 Connect air hose to tool 3 8 minimum diameter air line is mandatory 90 p s i is recommended and cycle tool a few times by depressing and releasing trigger Clean dry air is recommended WA...

Страница 6: ...on good maintenance practices Following these minimal requirements for service and care will extend the life of your tool Only use an air supply set at 90 100 psi equipped with a filter regulator to prevent wear The tool will eventually lose some hydraulic oil Keep the hydraulic system full only use Dexron III or equivalent and free of air by using the air bleeder 745163 on a regular basis Proper ...

Страница 7: ...ul not to move head piston when filling with oil 8 Remove 4oz bottle assy 745163 from front hole Replace screw and stat o seal Remove rear screw and stat o seal and attach 4 oz bottle assy 745163 Repeat step 7 9 Remove 4oz bottle assy 745163 from rear hole install screw and stat o seal 10 Reattach 4oz bottle assy 745163 to front bleeder hole and connect to air 11 Cycle tool 10 times holding trigge...

Страница 8: ... traced to its source An o ring or seal that leaks should be replaced 5 AIR BYPASS FROM VALVE HOUSING a If the spring 704141 breaks or dislodges air will flow freely through the muffler 704146 Replace or reset Valve spring installation tool 704162 is recommended b Check o rings on valve sleeve 703139 valve spool 703142 and valve plug 704145 If worn or damaged replace Valve sleeve removal tool 7041...

Страница 9: ... 40 inch lbs to prevent leakage around the gasket CLEANING AND LUBRICATING PROCEDURE Daily cleaning and lubrication of nose assembly will greatly reduce downtime and increase life of components Using sewing machine oil or an equivalent cleaner lubricant follow instructions below 1 Disconnect tool vacuum line if equipped 2 Point nose assembly into oil as shown Fig A 3 Cycle tool 8 10 times and wipe...

Страница 10: ... 40 inch lbs Attach air piston ass y 704121 to piston rod ass y 730233 With the piston rod ass y in the down position fill oil passage on top of handle with automatic transmission fluid Dexron III or equivalent when looking at top of handle the oil passage is the hole that has a counterbore for S832 o ring Replace gasket 745124 and o ring S832 just prior to replacing head cylinder 730398 See Filli...

Страница 11: ...O2 dry powder foam or water fog DO NOT use water jets ENVIRONMENT Waste disposal In accordance with all environmental laws and regulations applicable to your area Spillage Prevent entry into drains sewers and water course Soak up with diatomaceous earth or other inert material Store in appropriate container for disposal HANDLING Eye protection required Protective gloves recommended Chemically resi...

Страница 12: ...B 54RA UAB04 752A 43OS 5 32 UAB568 713 21 UAB568 713 61 3 16 UAB06 751B 54RA UAB06 752A 43OS 1 8 SMLS04 752B 20 SMLS04 752B 45 SMLS04 751B 54RA SMLS04 752A 43OS 5 32 SMLS05 752B 20 SMLS05 752B 45 SMLS05 751B 54RA SMLS05 752A 43OS 3 16 SMLS06 752B 20 SMLS06 752B 45 SMLS06 751B 54RA SMLS06 752A 43OS 1 4 SMLS08 713 20 SMLS08 713A 58RA SMLS08 752A 43OS3 1 RIGHT ANGLE NOSE ASSEMBLY S MAY REQUIRE MORE T...

Страница 13: ...d will replace or repair F O B our plant any goods providing defective from faulty workmanship or material for 90 days from date of shipment Said warranty to remain in effect if and only if such goods are used in accordance with all instructions as to maintenance operation and use set forth in manuals and instruction sheets furnished by seller Sellers obligation under this warranty shall be limite...

Отзывы: