GAELCO - TOKYOCOP
15
To assemble the machine proceed as follows:
1. Take out the boxes containing the accessories.
2. Remove the metal brackets that fix each unit to its pallet.
3. Raise the leg levellers and put the units down on the floor with the help of a ramp. Be
very careful to avoid the risk of being crushed!
4. Place the monitor cabinet is at its final location and strictly follow the instructions
described in section 3.2. Ensure that the cabinet is level, then secure the height
of the leg levelers by fastening the adjuster nut upwards.
5.2
ASSEMBLING & INSTALLATION
Содержание TOKYOCOP
Страница 4: ...GAELCO TOKYOCOP 4 ...
Страница 34: ...GAELCO TOKYOCOP 34 ...
Страница 57: ...GAELCO TOKYOCOP 57 ...
Страница 59: ...GAELCO TOKYOCOP 59 ...
Страница 61: ...GAELCO TOKYOCOP 61 ...
Страница 66: ...GAELCO TOKYOCOP 66 ...
Страница 67: ...GAELCO TOKYOCOP 67 11 1 POWER WIRING DIAGRAM 11 WIRING DIAGRAMS ...
Страница 68: ...GAELCO TOKYOCOP 68 11 2 CABINET WIRING DIAGRAM ...
Страница 69: ...GAELCO TOKYOCOP 69 11 3 UNION HARNESS WIRING DIAGRAM ...
Страница 70: ...GAELCO TOKYOCOP 70 11 4 PLATFORM WIRING DIAGRAM ...
Страница 71: ...GAELCO TOKYOCOP 71 11 5 DASHBOARD WIRING DIAGRAM ...
Страница 72: ...GAELCO TOKYOCOP 72 11 6 COIN TOWER WIRING DIAGRAM ...