20
GAELCO - RING RIDERS
12. If the machine has to be moved, though a little bit, retract the leg levellers.
To clean the game machine, wipe with a soft cloth damped with a neutral detergent
and wrung out. Using organic solvents like thinner may damage the plastic parts.
10. Level the platform.Carefully adjust all the levellers so that the whole machine rests firm
and level on the floor. (See section 3.2). Remember that the platform contains a motion
system!
11. Proceed to assemble the back rail to the platform. First of all connect the cable, then
fix the rail. The screws for that purpose are already installed on its place. Loose them
and screw them again fixing the rail.
WARNING!
If you find some difficulties when inserting the tubes, please do not push hard.
Remove the tubes and inspect the cable, as it could be bended and blocking the way.
Содержание Ring Riders
Страница 4: ...GAELCO RING RIDERS 4 ...
Страница 55: ...GAELCO RING RIDERS 55 NOTES ...
Страница 59: ...59 GAELCO RING RIDERS ...
Страница 69: ...69 GAELCO RING RIDERS ...
Страница 75: ...75 GAELCO RING RIDERS ...
Страница 77: ...77 GAELCO RING RIDERS ...
Страница 81: ...GAELCO RING RIDERS 81 ...
Страница 83: ...83 GAELCO RING RIDERS ...
Страница 86: ...86 GAELCO RING RIDERS 11 1 CABINET WIRING 1 11 WIRING DIAGRAMS ...
Страница 87: ...87 GAELCO RING RIDERS 11 2 CABINET WIRING 2 ...
Страница 88: ...88 GAELCO RING RIDERS 11 3 POWER 220ACV GROUND WIRING ...
Страница 89: ...89 GAELCO RING RIDERS 11 4 PLATFORM WIRING ...
Страница 90: ...90 GAELCO RING RIDERS 11 5 CHASSIS WIRING ...