![G-Tek LM Pro RF Скачать руководство пользователя страница 9](http://html2.mh-extra.com/html/g-tek/lm-pro-rf/lm-pro-rf_operating-manual_5050658009.webp)
G-Tek Corporation Pvt. LTD
8
Operation
O
PERATION
3.1
LM
P
RO
RF
I
NTERNAL
S
CHEMATICS
D
IAGRAM
The internal schematic of LM Pro RF consists of various blocks as shown in figure 4.
Figure 4 Internal Schematic diagram of LM Pro RF
3.2
LM
P
RO
RF
OPERATION
•
Once the Setup is done as per the schematic diagram, LM Pro RF show Room Temperature
and %RH on display continues Scrolling every 5 minutes.
•
The HBT Led will flicker at 5 minutes time interval and display will be updated.
•
The STR led will flicker with HBT Led at 5 minutes time interval, if Batch is running.
Otherwise STR led will remain in OFF state.
•
When the Batch is running, recording indication is shown on LCD display as
•
If alarm condition is created in any channel (Temperature or RH), Alarm high/low
indication will be shown on display as per
. Note that the display
will be blinked in Alarm condition.
•
The Temperature and %RH data is also sent to the Moderator via RF signal and with the
help of Moderator the data will be observed on GtekNet Application.
•
We can download the data in csv, pdf format using GtekNet application.