background image

 

© 2012 G Force Automatic Gates All Rights Reserved 

Internal Manual Release 

 

Internal Release 
Plate 

Engaged

 

Drive Arm 

Remove the motor cover. Use two 13 mm spanners to loosen the manual release nut and bolt. 
Push the DC motor away from the gears to disengage the motor and allow the gate drive arm 
to move by hand. 

Pull the DC motor back towards the gears to engage. Ensure the DC motor gear has meshed 
with the drive gear. Fully tighten the Internal Release Bolt and check the gears are engaged. 

External Manual Release 

 

Swing Arm 

Drive Arm 

Swing Arm 

Use a 19 mm spanner to undo the two bolts. Fold 
the swing arm back and tie up to the bottom of 
the gate. Screw the two bolts back into the Drive 
Arm. 

Internal  Release 
Bolt 

Engaged

 

Internal Release 
Bolt 

Disengaged

 

Internal Release 
Plate 

Disengaged

 

DC Motor 

DIY Automatic Gate Kits

 

PH 1800 111 930 

[email protected] 

www.gforceautogates.com.au

  

DSG5 DC2 GATE MOTOR 

INSTALLATION AND SET UP 

INSTRUCTIONS 

Содержание DSG 5 DC2

Страница 1: ...l DSG 5 DC2 Double Swing Gate Motor Kit Solar Powered and 12V Low Voltage July 2019 Installation and Set Up Instructions Unit 27 49 Corporate Boulevard Bayswater Vic 3153 Phone 1800 111 930 Email info...

Страница 2: ...ng the cover turn off and or disconnect the power to the gate motor If you are unable to do this then we strongly recommend you call an electrician Care should be taken as there are moving components...

Страница 3: ...te We recommend 1 5mm twin active lighting cable for power supply wiring and 1mm figure 8 wire for wiring push buttons and other auxiliary items Place the gate motors on a suitable work bench Unpack t...

Страница 4: ...ormer Terminals Push Button Wire in Receiver Terminals Connect wires to OSC and COM PE Beam Terminals Connect wires to PEB and COM 12V Power Out Terminals V positive terminal 0V Negative terminal Moto...

Страница 5: ...motor gear has meshed with the drive gear Fully tighten the Internal Release Bolt and check the gears are engaged External Manual Release Swing Arm Drive Arm Swing Arm Use a 19 mm spanner to undo the...

Страница 6: ...ill need to open first therefore close last Typically one or other of the gates may be fitted with a lip or tab to help align the gates when closed The lip or tab may be fitted to the leading edge of...

Страница 7: ...board should now be powered and great care should be taken to avoid shorting out or otherwise damaging the circuit board WARNING Care should be taken as there are moving components inside the gate mo...

Страница 8: ...n disconnect all power Refer to the DC2 Circuit Board data sheet included with this manual and locate the Motor M1 and Motor M2 terminals on the circuit board Identify which motor is going in the wron...

Страница 9: ...d circuit board from the gate motor mounting cradle by undoing the 4 nuts underneath the motor holding the drive assembly in the mounting cradle and remove the drive assembly and circuit board from th...

Страница 10: ...er tab The spacer tabs allow the lip of the motor cover to be correctly fitted over the mounting cradle and drive assembly Firmly attach the mounting cradle to the post and check that the cradle is le...

Страница 11: ...rd gate bracket touches the gate Measure approximately 40mm back towards the gate motor from the marked position and attach the standard gate bracket to the gate at this point Tighten the two swing ar...

Страница 12: ...nstallation The primary power source can be connected after all the necessary set up procedures and adjustments are made Refer to the DC 2 Circuit Board data sheet included with this manual and locate...

Страница 13: ...rrect cam until it clicks the corresponding limit switch see above Re tighten the cams Repeat for second motor Engage the Internal Release see page 5 CAUTION The gates will now open close when the gat...

Страница 14: ...oard This adjustment controls the motor torque and obstruction sensing of both gate motors The motors need to have enough torque force to fully open and close the gate However the more torque the moto...

Страница 15: ...lay flick DIP switch 1 to ON Press and hold down OPN button for the required open delay close delay time you need and release the button For example if you want a 15 second open delay close delay time...

Страница 16: ...the OSC button for 30 seconds and release the button Once time is set flick DIP switch 1 back to OFF To start the Auto Close function flick DIP switch 8 to ON and leave it on To disable the Auto Close...

Страница 17: ...should be taken to avoid shorting out or otherwise damaging the circuit board Turn on the transformer replace the metal motor cover and test Terminal Block 12 v Low Voltage Transformer Wires 1 5mm Twi...

Страница 18: ...over and test Solar Panel Wires RED tipped wire POSITIVE BLACK tipped wire NEGATIVE Terminal Block 1 5mm Twin Active Low Voltage Cable Weather Proof Enclosure Terminal Block from solar regulator Conne...

Страница 19: ...ing from normal operating conditions G Force Automatic Gates is not responsible for any special incidental consequential or punitive damages arising from the use or Warranty Returns POLICY 1 year DIY...

Страница 20: ...tighten all terminal block screws and ensure any cables are not frayed at the ends 5 Ensure Receiver is firmly mounted 6 Tighten all mounting and attachment bolts 7 Check screws on Push Button covers...

Отзывы: