
Assembly
Step1
1. Attach the frame components to intermediate connecting tube.
Attach the frame components to intermediate connecting tube,using:
Eighteen M10*10 hex socket round head bolts Eighteen
11*
20*2 washers
Step2
1.Install guiderod(6017-04-18) into guiderod hole of press
components
;
Install the guiderod into left and right spacing components(
6017-0201
、
6017-0202)
;
Attach the rope fixed group(6017-03-00) ,the
press
components to the location
guide(6017-04-18).Using:
two M10*70 hexagon socket head screws two
11*
20*2 washers
two power metallurgy
Sleeves (GT002)
two damping components(057)
two M10*40 hexagon socket head screws four guiderod protective pads(056)
four M8*30 hexagon socket head screws four Hex Jam Nut(M8)
two tie wire fixed axis(6017-05-05) eight
socket set screws(M8*8)
four hex nuts(M10)
Step3
1.
Install the rope according to the ropewalking map.Using:
two tie wire ropes eight socket set screws (M8*8 )
two tie wire fixed
axis(6017-05-05)
─
10
─
Содержание TZ-6017
Страница 1: ...TZ 6017 Smith Machine USER MANUAL The training equipment is in accordance with EN957 GB17498 Class S...
Страница 7: ...Exploded View 7...
Страница 8: ...8...
Страница 11: ...Step1 Drawing 11...
Страница 12: ...Step2 Drawing 12...
Страница 13: ...Step3 Drawing 13...