
39
SUPERBOILER T5
Original Instructions—rev.2011—
In compliance with the step 1.7.4 of the Machinery Direc-
tive 2006/42/CE
G.B.C. Industrial Tools S.p.A.
Via Sandro Pertini 41/43 –
25046
Cazzago San Martino (Bs) –
Italia –
Tel. + 39 030 7451154 –
Fax. + 39 030 73 56 629
Unscrew and remove the nipple and install the air connector between the nipple and the security switch.
Connect the air tube to the air connector and the pneumatic locking device as shown in the picture.