22
GBC 2700
Istruzioni originali—rev.2011—in accordo al 1.7.4 della direttiva macchine 2006/42/CE
G.B.C. Industrial Tools S.p.A.
Via Artigiani,17 – 25030 Torbiato di Adro (Bs) – Italia – Tel. + 39 030 7451154 – Fax. + 39 030 73 56 629
Install the motor flange on the end of the electric drive assembly making sure it is orientated as per the
above picture.
Fix the motor flange in place by inserting the spacer and then the elastic ring.
Install the motor spacer orientated as shown in the above picture and subsequently install the pinion
assembly on the drive shaft, making sure its orientation matches with the key.