
16
In the data review state, long press the "SET" button, then
press the "POWER" button to delete the stored data
Ⅹ
. Battery Instructions
When the voltage drops to 5.2V, the battery symbol "
" is
displayed. Please replace the battery. Low battery voltage affects
measurement accuracy.
Ⅹ
I. Field Application
1. Multi-Point Grounding System
As for the multi-point grounding system (such as electricity
transmission
tower
grounding
system, grounding
cable
communications systems, certain buildings, etc.), They usually
pass the overhead ground wire (cable shielding layer) connected
to form a grounding system.See below. As the Meter is in the
above measurement, its equivalent electric circuit is shown in the
figure below:
Содержание FR2000+
Страница 1: ...0 ...