FutureSmart HBT-122P Скачать руководство пользователя страница 3

FutureSmart                                       HBT-122P Telephone Distribution hub Installation Guide 

Termin tion  

 

 

 

 

 

Telephone wire color code EIA/TIA568A: 

air #1: Blue: 

ring

 blue/white. 

air #2 Orange: 

ring

 orange/white. 

air #3 Green:  

 

ring

 green/white. 

air #4 Brown: 

,

 ring

 brown/white. 

 

 

 

 

Fig. 2 

 

Patching 

Patching phone lines to outlets: 

e hub by 

 

ur 

Patching KSU phone extensions to TP hub: 

he incoming lines are routed to the KSU and 

ve 

tem or 

ctor 

ront of 

a

 

  T     R   

1 2 3 4 5 6 7 8

  T     R    T     R     T      R

Blue

Orange

Brown

Green

T=Tip(White with color stripe)
R=Ring(Color)

EIA/TIA 568A

 

P

Tip

 white/blue, 

 
P

Tip

 white/orange

 
P

Tip

 white/green,

 
P

Tip

 white/brown

 

 

 

 

 

Standard POT's phones

TP DISTRIBUTION HUB

Phone Company

Incoming CO lines

(upto two)

Service Input Hub

2 pair patch

cord

Note: to break out lines 1-2
at the individual outlet you
must use a Line Break Out
Box.

Fig.3

TP DISTRIBUTION HUB

Phone Company

Incoming CO lines

Fig.4

KSU

Lines 1&2

Phone KSU
Connecting
Cable
-HYD12
-HYD8

Phone extensions 8 or 12

phones

Front view

Back view

KSU System

 

The incoming service is routed to th
plugging the 6” jumper that came with the 
hub into the Cat 5 port on the service input
hub into the #1 port on the hub. Use patch 
cords to route telephone signals from the 
distribution hub to the individual jacks. Eac
jack should be terminated to the back of 
patching panel. (See Fig.3) Reference yo
panels install manual for instructions on 
terminating the individual cable runs.  

 
 
 
 
 

 

T
terminated.  Take the two screws off of the 
Shorting block labeled “Lines1&2” and remo
Shorting Block. Then use a Phone KSU 
Connecting Cable (HYD12 a two pair sys
HYD8 3 pair system, which one is used will 
depend on the type of KSU being used). Plu
the male amphenol connector on the KSU cabl
onto the now open female amphenol conne
on the TP hub, then plug the other end of th
KSU cable with the RG11 connectors into the 
KSU in the extension ports. Then on f
hub patch extensions into rooms. (See Fig.4) 
 
 
 

Отзывы: