![FutureSmart HBT-122P Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/futuresmart/hbt-122p/hbt-122p_installation-manual_2352325003.webp)
FutureSmart HBT-122P Telephone Distribution hub Installation Guide
Termin tion
Telephone wire color code EIA/TIA568A:
air #1: Blue:
ring
blue/white.
air #2 Orange:
,
ring
orange/white.
air #3 Green:
ring
green/white.
air #4 Brown:
,
ring
brown/white.
Fig. 2
Patching
Patching phone lines to outlets:
e hub by
h
ur
Patching KSU phone extensions to TP hub:
he incoming lines are routed to the KSU and
ve
tem or
g
e
ctor
e
ront of
a
T R
1 2 3 4 5 6 7 8
T R T R T R
Blue
Orange
Brown
Green
T=Tip(White with color stripe)
R=Ring(Color)
EIA/TIA 568A
P
Tip
white/blue,
P
Tip
white/orange
P
Tip
white/green,
P
Tip
white/brown
Standard POT's phones
TP DISTRIBUTION HUB
Phone Company
Incoming CO lines
(upto two)
Service Input Hub
2 pair patch
cord
Note: to break out lines 1-2
at the individual outlet you
must use a Line Break Out
Box.
Fig.3
TP DISTRIBUTION HUB
Phone Company
Incoming CO lines
Fig.4
KSU
Lines 1&2
Phone KSU
Connecting
Cable
-HYD12
-HYD8
Phone extensions 8 or 12
phones
Front view
Back view
KSU System
The incoming service is routed to th
plugging the 6” jumper that came with the
hub into the Cat 5 port on the service input
hub into the #1 port on the hub. Use patch
cords to route telephone signals from the
distribution hub to the individual jacks. Eac
jack should be terminated to the back of
patching panel. (See Fig.3) Reference yo
panels install manual for instructions on
terminating the individual cable runs.
T
terminated. Take the two screws off of the
Shorting block labeled “Lines1&2” and remo
Shorting Block. Then use a Phone KSU
Connecting Cable (HYD12 a two pair sys
HYD8 3 pair system, which one is used will
depend on the type of KSU being used). Plu
the male amphenol connector on the KSU cabl
onto the now open female amphenol conne
on the TP hub, then plug the other end of th
KSU cable with the RG11 connectors into the
KSU in the extension ports. Then on f
hub patch extensions into rooms. (See Fig.4)
3