![FutureSmart HBT-122P Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/futuresmart/hbt-122p/hbt-122p_installation-manual_2352325002.webp)
FutureSmart HBT-122P Telephone Distribution hub Installation Guide
Description
This FutureSmart 12 port, two line, RJ11 patch-style twisted pair hub is used to
Features
ng CO lines
Pot’s lines to up to 11 locations (RJ11)
Cat 3 rated
Surge protection
Interface port to a Key System unit (Amphenol connector)
Important
Never install or work with telephone wiring during a lightning storm.
ifically designed for use
♦
sulated telephone wires or terminals unless the telephone line has been
♦
ne lines.
it power. The connection should be
Installation
The TP hub fit into one of the expansion slots of a Hot wired, Pro, and SuperPro series.
t is
RJ11 ports
Shorting block w/surge
nes1&2)
collect and distribute voice and is an interface between a Key System Unit
•
2 incomi
•
•
•
•
♦
♦
Never install telephone jacks in wet locations unless the jack is spec
in wet locations
Never touch unin
disconnected at the network interface.
Use caution when installing or modifying telepho
♦
Have the Electrician connect the AC outlet to branch circu
in accordance with the National Electrical Code, Articles 110, 250 and 300.
Terminate the incoming lines on the service input hub; follow the color code for 568A tha
printed on the insert. (See Fig.2) Then use a 2 pair patch cord and patch from service input
hub to the TP hub. Be sure to connect both of the surge protection ground wires to a good
earth ground. Use the screws from the
expansion slot to mount into panel.
(SeeFig.3)
TP DISTRIBUTION HUB
Lines 1&2
IE
S T
P
SURGE-1
EC
C-2
9
4V
-0 0999
Front view
Back view
2
Fig.1
1
1 12
2
suppression and
grounding wire. (Li
2