FutureSmart HBT-122P Скачать руководство пользователя страница 2

FutureSmart                                       HBT-122P Telephone Distribution hub Installation Guide 

Description 

 

This FutureSmart 12 port, two line, RJ11 patch-style twisted pair hub is used to 

Features 

ng CO lines 

 

Pot’s lines to up to 11 locations (RJ11) 

 

Cat 3 rated 

 

Surge protection 

 

Interface port to a Key System unit (Amphenol connector) 

Important 

 

Never install or work with telephone wiring during a lightning storm. 

ifically designed for use 

♦ 

sulated telephone wires or terminals unless the telephone line has been 

♦ 

ne lines. 

it power. The connection should be 

Installation 

The TP hub fit into one of the expansion slots of a Hot wired, Pro, and SuperPro series. 

t is 

 

 

 RJ11 ports 

  Shorting block w/surge 

nes1&2) 

collect and distribute voice and is an interface between a Key System Unit 

 

• 

2 incomi

 

 

 

 

 
 

 


♦ 

Never install telephone jacks in wet locations unless the jack is spec

in wet locations 

Never touch unin

disconnected at the network interface. 

Use caution when installing or modifying telepho

♦ 

Have the Electrician connect the AC outlet to branch circu

in accordance with the National Electrical Code, Articles 110, 250 and 300. 

 

 

Terminate the incoming lines on the service input hub; follow the color code for 568A tha
printed on the insert. (See Fig.2)  Then use a 2 pair patch cord and patch from service input 
hub to the TP hub.  Be sure to connect both of the surge protection ground wires to a good 
earth ground.   Use the screws from the 
expansion slot to mount into panel. 
(SeeFig.3)    

   

TP DISTRIBUTION HUB

Lines 1&2

IE

S T

P

SURGE-1

EC

C-2

   9

4V

-0   0999

Front view

Back view

2

Fig.1

1

 
 
 
1  12
 
2

suppression and  
grounding wire. (Li
 
 

Отзывы: