![FUTABA 9z Скачать руководство пользователя страница 58](http://html.mh-extra.com/html/futaba/9z/9z_user-manual_2351606058.webp)
V
FUTABA 9Z
THE UNOFFICIAL WORKSHOP MANUAL
WARNING:
THE INFORMATION IN THIS MANUAL IS FOR INFORMATION PURPOSES ONLY AND MAY BE INCORRECT, CAUSE DAMAGE
TO YOUR RADIO OR INJURY TO YOURSELF AND OTHERS. IF YOU USE THIS MANUAL YOU DO SO SOLEY AT YOUR OWN RISK.
www.jamesandtracy.co.uk
Copyright 2012 jamesandtracy.co.uk
Page 58 of 84
DISASSEMBLE TO THE CORRECT STAGE:
Specific maintenance, servicing or
upgrade procedures are allocated to a stage. For example: To replace a corner switch
you will need to disassemble to Stage 3, and to replace the lithium back up battery you
will need to disassemble to Stage 4. The stage you’ll need to disassemble to for carrying
out procedures is shown in the Servicing and Upgrade Matrix in Section 2.2.
FURTHER DISASSEMBLY IS POSSIBLE & SOMETIMES REQUIRED
: The stages
detailed in this manual only deal with the 9Z’s case. For many procedures you’ll also
need to disassemble a PCB board, these procedures are detailed at the relevant
Servicing or Upgrade section in this manual. In addition, it is possible to completely
disassemble the 9Z’s case (i.e. beyond Stage 4) if required.
An overview of 9Z case disassembly is provided in Figure 53 below.
9Z CASE BACK
MODULE
MAIN BATTERY PACK
BATTERY HATCH
9Z CASE BOTTOM COVER
LCD PANEL ASSEMBLY
9
Z
CAS
E
L
E
F
T
S
ID
E
9
Z
C
A
S
E
RI
G
H
T
S
IDE
9Z CASE LEFT CORNER
9Z CASE RIGHT CORNER
KEY TO DISASSEMBLY
STAGE 1
STAGE 2
STAGE 3
STAGE 4
F
R
ON
T
O
F
9
Z
TR
A
N
S
M
IT
TE
R
B
A
C
K
OF
9
Z
T
R
A
N
S
M
ITT
E
R
Figure 53 Overview of 9Z Case Disassembly