Premiere Movie Server Installation Manual
9
Chapter 2
Setting up your Premiere Movie Server
POWERING UP THE SYSTEM:
Your Premiere system is a hard drive based server with the ability to store
all your DVD and Blu-rays as well as play them back.
When placing the system in your equipment rack or elsewhere, it is impor-
tant to provide adequate ventilation. All server based products will gener-
ate some heat and will require ventilation, failure to provide adequate
airflow may result in hard drive damage or other hardware issues.
To power the unit up or down, touch the front silver power button once
and release.
DO NOT hold the power button down to force the unit to
shutdown. Doing so may damage the operating system.
Tech Tip:
Great effort has been made to engineer this server to
be as quiet as possible; however it is important to understand that
this is both a player and a powerful server. The system will still
emit some fan noise, especially under load and thought must be given to
the placement of the unit to keep it cool and well ventilated.
CONNECTIONS ON THE PREMIERE MOVIE SERVER:
To begin setting up your server, plug in the power
(
Note:
Fusion servers
should always be plugged into a UPS device.)
Connect the HDMI cable to
your display, connect to your home’s internet service
(required for import-
ing movies)
and connect the USB-based IR device for the supplied remote
control.
Содержание Premiere Movie Server
Страница 1: ...FUSION RESEARCH Premiere Movie Server Installation Guide April 2012...
Страница 2: ......