1. OPERATIONAL OVERVIEW
1-9
TEST-DISTRESS ALERT
Sending test distress alert to LES
WAITING FOR ACTIVATION
Waiting start of PV test
WAITING FOR TEST RESULT
Waiting for results of PV test
CLEARING
Clearing PV test
PV TEST is Completed.
PV test is completed.
PV TEST Failure.
PV test failed.
(3b) RF CON board program version number
DCE F16 Ver. XX (XX = Version Number)
(4) Frame synchronization
Blank
Changing channel, or during transmission
SYNC (NCS)
Synchronizing with NCS
SYNC (LES)
Synchronizing with LES
MES Sig. Ch
Transferring to MES signaling channel
MES Msg. Ch
Transferring to MES message channel
UNSYNC
Out of synchronization
Retuning
Synchronizing with NCS or LES
(5) Ocean region receiving
No display
Out of synch with satellite
AOR-W Atlantic
Ocean
Region-West
AOR-E Atlantic
Ocean
Region-East
IOR
Indian Ocean Region
POR Pacific
Ocean
Region
(6) Logging status
LOGOUT
Logged out with ocean region
LOGIN
Logged in with ocean region
LOGIN (Flashing)
Logging in with ocean region
Содержание FELCOM 16
Страница 1: ...INMARSAT MINI C MOBILE EARTH STATION FELCOM 16 OPERATOR S MANUAL www furuno co jp MODEL ...
Страница 18: ...INMARSAT C SYSTEM xvi This page is intentionally left blank ...
Страница 34: ...1 OPERATIONAL OVERVIEW 1 14 This page intentionally left blank ...
Страница 74: ...This page is intentionally left blank ...
Страница 130: ...4 INMARSAT C OPERATIONS 4 36 This page intentionally left blank ...
Страница 144: ...5 DATA REPORTING AND POLLING 5 14 This page intentionally left blank ...
Страница 167: ...APPENDIX AP 7 ...
Страница 184: ...This page is intentionally left blank ...