Page 3/4
aspenhome
R
ASSEMBLY INSTRUCTIONS
MADE IN VIETNAM
ah
STEP 5: The side rails may be used on
either side. Arrange the side rails so the
slat bearers are in UPPER POSITION
prior to attachment in STEP 6.
Slat bearer in
upper position
Slat bearer in
lower position
STEP 6: Screw the bolts(F) into HB & FB. Align the bolts with the holes in the end of side rails and
attach the side rails to HB & FB using half moon washers(G), lock washers(H) and nuts (I).Then use
a hex wrench to tighten all the nuts.
Make sure the slat bearer is
in the UPPER position.
Headboard
Slat bearer
Side Rail
F
G H
I J
05-31-2017
ITEM NO: I240-400-RIV Queen Sleigh HB
I240-402-RIV Queen Rails
I240-403D-RIV Queen Storage FB
STEP 7: Attach center rail to the footboard and center support leg of headboard using 4 bolts(M),
lock washers(N) and flat washers(O), push the left drawer back in.
M
N O
P