1. Align a guard rail (#20)
to the pre-drilled holes
along the ends of the
front guard rails (#18)
and upper front side
rail (#16). Then insert
4 bolts (#E) and secure
using the Allen wrench.
#18
#16
2. Align a guard rail (#19) to the pre-
drilled holes along the center of the
rails. Insert 3 screws (#F) into each
guard rail (#19) and secure.
1. Insert a metal dowel
(#J) into the large pre-
drilled holes along the
top corners of the
bottom bunk.
2. With the help of another person,
carefully place the top bunk onto
those metal dowels (#J).