
7 | SECURE POWER BEAM TO WORKSTATION
Use a 6" drill extension to secure power beam end to center cutout
of SR Beam Mounting Bracket with 4 screws on each end.
8 | SET POWER BEAM WIDTH
Using the set screws, interconnect the inner and outer power beam
sections for additional stability.
Note: Use 2 screws with 48" width workstations and 4 screws for all
other widths.
Slide the inner tray/outer tray beam into the grooves of the outer
bream and place onto the underside of the power beam and adjust
width as needed and secure.
After power beam is secured, remove data plate from the outer
beam.
10 | ASSEMBLE DATA TRAY
9 | REMOVE DATA PLATE
S
PRO
U
T
PRO
S
PRO
U
T
PRO
S
ID
E
-
B
Y
-S
ID
E
L
-S
H
A
P
E
S
ID
E
-
B
Y
-S
ID
E
L
-S
H
A
P
E
16
17