Setup Manual
Hints
•
Wipe the sand off the posts before storing them.
• Store each anchor in one single pole section so they cannot drop out inside the bag.
Each post is assembled from three pieces. The section
with the black cap is the top piece. Insert the metal eyebolts
into the holes and secure with the threaded nut provided.
You can choose between the two different holes to obtain
different net heights.
Assemble the two parts of the yellow straps as shown.
Make sure the loops are positioned at the ends of the belt
and not near the metal clip lock. Place the small loops of the
straps under the disks on the top of the four sand anchors.
Use two anchors per post. Make sure to knock the anchors
into the ground at a slight angle away from the posts to aid
tensioning.
Put the loops on the other end of the straps over the top
end of the posts and put the posts up sloping inwards. Then
position the cable loops attached to the top ends of the net
over the top of the posts as well.
Tighten the yellow straps and adjust the position of the
post as necessery to get the posts upright. The net must be
aligned midway between the poles by adjusting the short
yellow ropes at the top of the net. Adjust the lower ropes to
length at the metal eyebolts at the poles.
The net tension and net height can be altered to achieve
the perfect net by adjusting the straps and the tension of the
ropes at the bottom corners of the net.
To obtain the ideal position for the sand anchors, unfold
the net completely 1 . The loops at the ends of the top cable
mark the places for the posts 2 . Drive the anchors into the
ground at a distance of approx. 3.3 m from the post position
to form an angle of approx. 45deg with the post 3 . Please
refer to figure 7 at the bottom of this page to get an overview
of the correct placement of posts and anchors.
FUNTEC Sports GmbH
| Löhestr. 25 | DE - 53773 Hennef | +49 (0) 2242 3231 | [email protected] | www.funtec.de