2-3-1
DUALPALMA
MECHANICAL ALIGNMENT PROCEDURES
Explanation of alignment for the tape to correctly run
starts on the next page. Refer to the information below
on this page if a tape gets stuck, for example, in the
mechanism due to some electrical trouble of the unit.
Service Information
A.
Method for Manual Tape Loading/Unloading
To load a cassette tape manually:
1. Disconnect the AC plug.
2. Remove the Top Case and Front Assembly.
3. Insert a cassette tape. Though the tape will not be
automatically loaded, make sure that the cassette
tape is all the way in at the inlet of the Cassette
Holder. To confirm this, lightly push the cassette
tape further in and see if the tape comes back out,
by a spring motion, just as much as you have
pushed in.
4. Turn the LDG Belt in the appropriate direction
shown in Fig. M1 for a minute or two to complete
this task.
To unload a cassette tape manually:
1. Disconnect the AC plug.
2. Remove the Top Case and Front Assembly.
3. Make sure that the Moving guide preparations are
in the Eject Position.
4. Turn the LDG Belt in the appropriate direction
shown in Fig. M1 until the Moving guide prepara-
tions come to the Eject Position. Stop turning
when the preparations begin clicking or can not be
moved further. However, the tape will be left
wound around the cylinder.
5. Turn the LDG Belt in the appropriate direction con-
tinuously, and the cassette tape will be ejected.
Allow a minute or two to complete this task.
B.
Method to place the Cassette Holder in the tape-
loaded position without a cassette tape
1. Disconnect the AC Plug.
2. Remove the Top Case and Front Assembly.
3. Turn the LDG Belt in the appropriate direction
shown in Fig. M1. Release the locking tabs shown
in Fig. M1 and continue turning the LDG Belt until
the Cassette Holder comes to the tape-loaded
position. Allow a minute or two to complete this
task.
Moving guide T preparation
(Eject Position)
LDG Belt
Push the locking tab gently to unlock
when loading without a cassette.
Side View
Moving guide S preparation
(Eject Position)
Push the tape
to load it.
UNLOAD
/EJECT
LOAD
Fig. M1
Top View
Cam Gear
LDG Belt (B)
UNLOAD
/EJECT
Bottom View
Fig. M2
Содержание DPVR-2600
Страница 32: ...1 10 6 1 10 7 1 10 8 H9300SCM2 Main 2 7 Schematic Diagram VCR Section ...
Страница 33: ...Main 3 7 Schematic Diagram VCR Section 1 10 9 1 10 10 1 10 11 H9300SCM3 ...
Страница 34: ...Main 4 7 Schematic Diagram VCR Section 1 10 12 1 10 13 1 10 14 H9300SCM4 ...
Страница 35: ...1 10 15 1 10 16 Main 5 7 Schematic Diagram VCR Section H9300SCM5 ...
Страница 36: ...1 10 17 1 10 18 H9300SCM6 Main 6 7 Schematic Diagram VCR Section ...
Страница 37: ...1 10 19 1 10 20 H9300SCM7 Main 7 7 Schematic Diagram VCR Section ...
Страница 43: ...1 10 31 1 10 32 BH9311F01012 B Function CBA Top View Function CBA Bottom View ...
Страница 46: ...1 10 38 1 10 39 1 10 40 BH9311F01012 A Main CBA Bottom View ...
Страница 47: ...1 10 41 1 10 42 1 10 43 H9300SCD1 DVD Main 1 4 Schematic Diagram DVD Section ...
Страница 48: ...1 10 44 1 10 45 1 10 46 H9300SCD2 DVD Main 2 4 Schematic Diagram DVD Section ...
Страница 49: ...1 10 47 1 10 48 1 10 49 H9300SCD3 DVD Main 3 4 Schematic Diagram DVD Section ...
Страница 50: ...1 10 50 1 10 51 1 10 52 H9300SCD4 DVD Main 4 4 Schematic Diagram DVD Section ...
Страница 72: ...2 4 6 DUALPALDA S 12 19 Cap Belt Fig DM11 Fig DM12 20 C 1 21 ...
Страница 79: ...3 1 3 H9300PEX S1 A14 X20 X6 B Some Ref Numbers are not in sequence X2 X3 X4 X1 Unit S3 X5 S2 S2 Packing ...
Страница 99: ...DPVR 2600 DPVR 2700 DPVR 2605 H9300 06 20ED ...