Installation Instructions subject to change without notice.
Page 7 of 7
INS-FHEZ, Rev A
HotSpot EZ Exit
12. Connector the two-battery quick connects together
and close the junction box.
13. Restore power to the circuit. Verify the red “Test”
button is illuminated and test the fixture by pushing
the test button to illuminate the fixture. Turn the
power off and verify the fixture turns on when power
is lost.
14. Re-install all ceiling tiles, and the install is complete.
Fulham Co. Inc.
: 12705 South Van Ness Ave., Hawthorne, CA 90250
Telephone
: 1-323-779-2980
Fax
: 1-323-754-9060
www.fulham.com
Note: Please make sure that all electrical
connections conform to National Electrical
Code and local regulations.
11/09/18