Powering On the System
47
Note –
Only one power connection is required for operation. Use two power
connections for redundancy.
The service processor runs on the 3.3V standby voltage. As soon as AC power is
connected to the system, the service processor powers on, runs diagnostics, and
initializes the ILOM firmware.
After a few minutes, the SP login prompt appears on the terminal device. The host
is not initialized or powered on yet.
8. At the terminal device, log in to the SP as
root
with a password of
changeme
.
After a brief delay, the SP prompt is displayed (
->
). At this point, there are many
commands you can perform using the Integrated Lights Out Manager interface.
Additional SP information, such as how to change the password and how to set
up the SP network parameters is available in the online documentation set.
9. Power on the server and redirect the host output to display on the serial
terminal device:
After you start the SP console, the server initialization takes approximately 20
minutes to complete.
10. When prompted, follow the onscreen instructions for configuring the Solaris
Operating System on your host and enter the following configuration
information.
You will be prompted to confirm the configuration several times, enabling
confirmation and changes. If you are not sure how to respond to a particular
value, you can accept the default, and make future changes when the Solaris OS is
running.
XXXXXXXXXXXXXXXX login:
root
Password:
changeme
. . .
->
->
start /SYS
Are you sure you want to start /SYS (y/n)?
y
->
start /SP/console
Are you sure you want to start /SP/CONSOLE (y/n)?
y
Serial console started. To stop, type #.
. . .
Parameter
Description
Language
Select a number from the displayed language list.
Содержание SPARC Enterprise T5140
Страница 1: ......
Страница 2: ......
Страница 6: ......
Страница 22: ...xx SPARC Enterprise T5140 and T5240 Servers Installation Guide July 2009 ...
Страница 63: ...Installing the SPARC Enterprise T5140 and T5240 Servers 41 ...
Страница 64: ...42 SPARC Enterprise T5140 and T5240 Servers Installation Guide July 2009 ...
Страница 128: ...106 SPARC Enterprise T5140 and T5240 Servers Installation Guide July 2009 ...
Страница 129: ......
Страница 130: ......