175
Returning the Server to Operation
These topics explain how to return SPARC Enterprise T5120 and T5220 servers to
operation after you have performed service procedures.
■
“Install the Top Cover” on page 175
■
“Reinstall the Server in the Rack” on page 176
■
“Return the Server to the Normal Rack Position” on page 177
■
“Connect Power Cords to the Server” on page 178
■
“Power On the Server Using the
■
“Power On the Server Using the Front Panel Power Button” on page 180
▼
Install the Top Cover
1. Place the top cover on the chassis.
Set the cover down so that it hangs over the rear of the server by about an inch
(25.4 mm).
2. Slide the top cover forward until it seats.
Содержание SPARC Enterprise T5120
Страница 1: ......
Страница 2: ......
Страница 6: ......
Страница 44: ...18 SPARC Enterprise T5120 and T5220 Servers Service Manual July 2009 FIGURE Diagnostics Flowchart ...
Страница 82: ...56 SPARC Enterprise T5120 and T5220 Servers Service Manual July 2009 ...
Страница 181: ...Servicing Boards and Components 155 FIGURE Installing a Hard Drive Backplane in a SPARC Enterprise T5120 Server ...
Страница 200: ...174 SPARC Enterprise T5120 and T5220 Servers Service Manual July 2009 ...
Страница 234: ...208 SPARC Enterprise T5120 and T5220 Servers Service Manual July 2009 ...
Страница 239: ......
Страница 240: ......