Fujitsu SPARC ENTERPRISE T1000 Скачать руководство пользователя страница 77

Appendix C

Configuring the Network Management Port

51

Note –

The network addresses and parameters shown in the examples are for

illustration purposes only. The four parameters marked with asterisks must be set
according to the specific details of your network configuration for the network
management port to function properly.

sc>

showsc

Advanced Lights Out Manager CMT v1.x

parameter                value

---------                -----

if_network*              true

if_connection            ssh

if_emailalerts           false

netsc_dhcp               true

netsc_ipaddr*

xxx

.

xxx

.

xxx

.

xxx

netsc_ipnetmask*         255.255.255.0

netsc_ipgateway*

xxx

.

xxx

.

xxx

.

xx

mgt_mailhost

mgt_mailalert

sc_customerinfo

sc_escapechars           #.

sc_powerondelay          false

sc_powerstatememory      false

sc_clipasswdecho         true

sc_cliprompt             sc

sc_clitimeout            0

sc_clieventlevel         2

sc_backupuserdata        true

diag_trigger             power-on-reset error-reset

diag_verbosity           normal

diag_level               max

diag_mode                normal

sys_autorunonerror       false

ser_baudrate             9600

ser_parity               none

ser_stopbits             1

ser_data                 8

netsc_enetaddr

xx

:

xx

:

xx

:

xx

:

xx

:

xx

sys_enetaddr

yy

:

yy

:

yy

:

yy

:

yy

:

yy

Содержание SPARC ENTERPRISE T1000

Страница 1: ......

Страница 2: ......

Страница 3: ...SPARC Enterprise T1000 Server Installation Guide Manual Code C120 E383 01EN Part No 875 4021 10 April 2007 ...

Страница 4: ... and the Fujitsu logo are registered trademarks of Fujitsu Limited All SPARC trademarks are used under license and are registered trademarks of SPARC International Inc in the U S and other countries Products bearing SPARC trademarks are based upon architecture developed by Sun Microsystems Inc SPARC64 is a trademark of SPARC International Inc used under license by Fujitsu Microelectronics Inc and ...

Страница 5: ...Toutes les marques SPARC sont utilisées sous licence et sont des marques de fabrique ou des marques déposées de SPARC International Inc aux Etats Unis et dans d autres pays Les produits portant les marques SPARC sont basés sur une architecture développée par Sun Microsystems Inc SPARC64 est une marques déposée de SPARC International Inc utilisée sous le permis par Fujitsu Microelectronics Inc et F...

Страница 6: ......

Страница 7: ...rview 3 Slide Rail Assembly Notes 5 Cable Management Notes 7 Data Port and Cabling Notes 8 Port Locations 8 Cabling Notes 8 Safety Precautions 9 2 Installing the Server 11 Rackmount Kit 11 Installing the Server in a Rack 12 To Install the Mounting Brackets 12 To Install the Slide Rails 15 To Install the Server in the Rack 19 ...

Страница 8: ...stem Console 25 ALOM CMT System Controller 26 Passwords 26 To Power On the System for the First Time 27 Logging In To the ALOM CMT System Controller 29 To Log In To the System Controller Using the Serial Management Port 29 To Log In To the System Controller Using the Network Management Port 30 To Configure the System Controller Network Management Port 31 To Reset the System Controller 34 Using the...

Страница 9: ... Update the Firmware 44 B Selecting a Boot Device 47 Connecting the Network Interface to the Network 47 To Connect the Network Interface to the Network 47 C Configuring the Network Management Port 49 Configuring the System Controller Network Manager Port 49 To Configure the System Controller Network Management Port 49 Index 53 ...

Страница 10: ...viii SPARC Enterprise T1000 Server Installation Guide April 2007 ...

Страница 11: ...GURE 2 3 Attaching a Mounting Bracket to the Chassis 14 FIGURE 2 4 Captive Screws on the Slide Rail 15 FIGURE 2 5 Using the Extension Bracket 16 FIGURE 2 6 Mounting the Slide Rail 17 FIGURE 2 7 Using the Slide Rail Spacing Tool to Adjust the Distance Between the Slide Rails 18 FIGURE 2 8 Mounting the Chassis on the Slide Rails 20 FIGURE 2 9 Rear Panel Connectors 21 FIGURE 2 10 System Controller Se...

Страница 12: ...x SPARC Enterprise T1000 Server Installation Guide April 2007 ...

Страница 13: ...xi Tables TABLE 1 1 Ethernet Connection Transfer Rates 9 TABLE 3 1 Server Device List 38 ...

Страница 14: ...xii SPARC Enterprise T1000 Server Installation Guide April 2007 ...

Страница 15: ...XAMPLE 3 1 Boot Sequence Example 28 CODE EXAMPLE 3 2 Example of Normal System Initialization Output 37 CODE EXAMPLE 3 3 Example of Server Boot from Disk 0 39 CODE EXAMPLE A 1 Typical Boot Sequence Following Firmware Update 45 ...

Страница 16: ...xiv SPARC Enterprise T1000 Server Installation Guide April 2007 ...

Страница 17: ...y qualified service technicians only FOR SAFE OPERATION This manual contains important information regarding the use and handling of this product Read this manual thoroughly Pay special attention to the section FOR SAFE OPERATION on page xv Use the product according to the instructions and information available in this manual Keep this manual handy for further reference Fujitsu makes every effort ...

Страница 18: ...e APPENDIX A Updating the Server Firmware Provides instructions for updating the system controller firmware and the host firmware APPENDIX B Selecting a Boot Device Provides instructions for selecting a boot device APPENDIX C Configuring the Network Management Port Provides configuration instructions for servers that use an earlier version of firmware than system firmware 6 2 INDEX Provides keywor...

Страница 19: ...d documentation to get your system installed and running quickly C120 E379 SPARC Enterprise T1000 Server Overview Provides an overview of the features of this server C120 E380 SPARC Enterprise T1000 Server Service Manual How to run diagnostics to troubleshoot the server and how to remove and replace parts in the server C120 E384 SPARC Enterprise T1000 Server System Administration Guide How to perf...

Страница 20: ...al uses the following fonts and symbols to express specific types of information The settings on your browser might differ from these settings Typeface Meaning Example AaBbCc123 The names of commands files and directories on screen computer output Edit your login file Use ls a to list all files You have mail AaBbCc123 What you type when contrasted with on screen computer output su Password AaBbCc1...

Страница 21: ...l injury potential hazard if the user does not perform the procedure correctly Caution This indicates a hazardous situation that could result in minor or moderate personal injury if the user does not perform the procedure correctly This signal also indicates that damage to the product or other property may occur if the user does not perform the procedure correctly Tip This indicates information th...

Страница 22: ...e malfunction Unpacking optional adapters and such packages delivered to the users Also important alert messages are shown in Important Alert Messages on page xx Notes on Safety Important Alert Messages This manual provides the following important alert signals Caution This indicates a hazardous situation could result in minor or moderate personal injury if the user does not perform the procedure ...

Страница 23: ...d inspections repairing and regular diagnosis and maintenance Caution The following tasks regarding this product and the optional products provided from Fujitsu should only be performed by a certified service engineer Users must not perform these tasks Incorrect operation of these tasks may cause malfunction Unpacking optional adapters and such packages delivered to the users Plugging or unpluggin...

Страница 24: ...Server Installation Guide April 2007 Alert Labels The followings are labels attached to this product Never peel off the labels The following labels provide information to the users of this product Sample of SPARC Enterprise T1000 ...

Страница 25: ...Preface xxiii Reader s Comment Form ...

Страница 26: ...OLD AND TAPE BUSINESS REPLY MAIL FIRST CLASS MAIL PERMIT NO 741 SUNNYVALE CA NO POSTAGE NECESSARY IF MAILED IN THE UNITED STATES POSTAGE WILL BE PAID BY ADDRESSEE FUJITSU COMPUTER SYSTEMS ATTENTION ENGINEERING OPS M S 249 1250 EAST ARQUES AVENUE P O BOX 3470 SUNNYVALE CA 94088 3470 ...

Страница 27: ...tion about the installation procedures that begin in Chapter 2 This chapter contains these topics Tools Needed on page 2 Optional Components on page 3 Installation Overview on page 3 Slide Rail Assembly Notes on page 5 Cable Management Notes on page 7 Data Port and Cabling Notes on page 8 Safety Precautions on page 9 ...

Страница 28: ...2 SPARC Enterprise T1000 Server Installation Guide April 2007 Server Overview FIGURE 1 1 shows the server FIGURE 1 1 Server Tools Needed No 2 Phillips screwdriver ESD mat and grounding strap ...

Страница 29: ...ce such as an antistatic discharge mat an antistatic bag or a disposable antistatic mat Wear an antistatic grounding strap connected to a metal surface on the chassis when you work on system components Note The list of optional components can be updated without notice Installation Overview This installation guide provides procedures that must be performed in the following order 1 Verify that you h...

Страница 30: ... Cables on page 21 7 Connect the AC power cable to the server and examine the display for any error messages See Powering On the Server for the First Time on page 25 Caution There is a potential for electric shock if the server and related equipment are not properly grounded Note The system controller SC runs on the 3 3v standby voltage As soon as AC power is connected to the system the system con...

Страница 31: ...ontaining software to help you operate configure and administer your server Refer to the documentation provided with the media kit for a complete listing of included software and detailed installation instructions Slide Rail Assembly Notes The rackmount kit has two slide rail assemblies Each slide rail assembly can be installed on either the right or left side of the rack A slide rail assembly con...

Страница 32: ... in 330 mm out of the slide rail then locks in place If you unlock the mounting bracket it slides an additional 4 in 100 mm before separating from the slide rail The mounting brackets mount directly to the sides of the server chassis There are two locks on each server mounting bracket FIGURE 1 3 The lock enables the mounting bracket to slide forward The mounting bracket release allows you to remov...

Страница 33: ...nagement Notes A cable management bracket FIGURE 1 4 is included in the server slide rail kit The cable management bracket clips onto the slide rails Use cable ties or cable straps to attach cabling to the bracket FIGURE 1 4 Cable Management Bracket ...

Страница 34: ...ler SC management ports There are two SC management ports for use with the ALOM CMT system controller The SC serial management port labeled SERIAL MGT uses an RJ 45 cable and is always available This is the default connection to the ALOM CMT system controller The SC network management port labeled NET MGT is the optional connection to the ALOM CMT system controller See To Configure the System Cont...

Страница 35: ...the ALOM CMT system controller initializes Tip The serial terminal or a terminal emulator should be connected before you connect the power cables As soon as AC power is connected to the system the system controller immediately powers on and runs diagnostics Diagnostic test failures will be printed on the serial terminal For more information refer to the Advanced Lights out Management ALOM CMT v1 x...

Страница 36: ...10 SPARC Enterprise T1000 Server Installation Guide April 2007 ...

Страница 37: ... you have all of the parts before you begin the installation of the server Note In this guide references to left and right are from your viewpoint as you face either the front or the rear of the system Rackmount Kit The server rackmount kit includes two mounting slides a slide spacing tool and a cable management bracket The kit also includes two extension brackets for use with racks up to 39 5 in ...

Страница 38: ...etely out of their respective slide rails a Simultaneously press and hold the upper and lower lock buttons of the slide rail lock FIGURE 2 1 FIGURE 2 1 Unlocking the Slide Rail Assembly b Pull the mounting bracket out until it stops c Slide the mounting bracket release button to the left FIGURE 2 2 then slide the mounting bracket completely out of the slide rail ...

Страница 39: ...a mounting bracket to the right side of the server chassis a Position the mounting bracket against the server chassis FIGURE 2 3 so that the slide rail lock is at the front and the two keyed openings on the mounting bracket are aligned with the two locating pins on the side of the chassis ...

Страница 40: ... two keyed openings in the mounting bracket slide the mounting bracket toward the front of the chassis until the bracket locks into place with an audible click c Verify that both locating pins are trapped in the keyed openings and that the front locating pin has engaged the mounting bracket lock FIGURE 2 3 3 Attach the second mounting bracket to the left side of the server chassis ...

Страница 41: ...etermine whether the threads are metric or standard Select the appropriate screws from the package included in the mounting kit If your rack does not have threaded mounting holes the mounting screws go through bracket and rack post and are secured with a caged nut Select the appropriate screws and nuts from the package included in the mounting kit 3 Loosen the two captive screws FIGURE 2 4 approxi...

Страница 42: ...xtension brackets under the following conditions If your rack is deeper than 29 0 in 740mm If your rack requires the ends of the slide rails to be side mounted If required use M6 screws to attach an extension bracket to the rear of each slide rail as shown in FIGURE 2 5 FIGURE 2 5 Using the Extension Bracket Note In some very rare cases it may be necessary to mount the extension bracket with its s...

Страница 43: ...e Rail b Adjust the length of the slide rail by sliding the rear section to reach the outside edge of the rear rack post then tighten the captive screws FIGURE 2 4 to freeze the length of the slide rail c Loosely attach the rear of the slide rail to the rear rack post with screws 6 Attach the second slide rail to the left rack posts in a similar manner Do not tighten the attachment screws at the f...

Страница 44: ...djust the Distance Between the Slide Rails b Insert the right side of the tool into slots at the end of the right rail while simultaneously sliding the end of the rail to the right or left as needed to allow the ends of the tool to enter both middle sections When the tool is properly inserted the distance between the rails is 17 4 in 442 mm c Tighten the screws to lock the ends of the slide rails ...

Страница 45: ...pacing tool Slide the rails sideways as needed until the sides of the spacing tool touch both rails At this point the distance between the ends of the rails is 17 4 in 442 mm f Tighten the two screws to lock the rails in place To Install the Server in the Rack 1 Deploy the antitilt feature if the rack is so equipped Caution Deploy the antitilt feature on the rack before beginning an installation ...

Страница 46: ...Slide the chassis into the rack Caution Before continuing verify that the server is securely mounted in the rack and that the slide rails are locked in the mounting brackets To Install the Cable Management Bracket 1 Place the cable management bracket across the slide rail assemblies behind the system chassis 2 Press down on each end of the cable management bracket until the ends click into place o...

Страница 47: ...terprise T1000 Server Service Manual Connecting the Server Cables To boot the server you must connect and configure the network and serial ports The procedures are given in the following sections To Connect the SC Serial Management Port on page 22 To Connect the SC Network Management Port on page 22 To Connect the Ethernet Network Cables on page 23 To Connect the AC Power Cable to the Server on pa...

Страница 48: ...he SER MGT serial management port to the terminal device When connecting either a DB 9 or a DB 25 cable use an adapter to perform the crossovers given for each connector To Connect the SC Network Management Port The system controller network management port is marked NET MGT FIGURE 2 10 Note The SC network management port is configured by default to retrieve network settings via Dynamic Host Confi...

Страница 49: ...it Note This serial port is not the same as the SC serial management port Use the serial port only for general purpose serial data transfers FIGURE 2 11 Serial Port TTYA To Connect the AC Power Cable to the Server Powering on the system for the first time requires special preparation and procedures For example if you have not prepared a display before connecting the AC power cable system messages ...

Страница 50: ... Installation Guide April 2007 Caution The server goes into Standby mode and the system controller initializes as soon as the AC power cable is connected to the power source 2 Go to Powering On the Server for the First Time on page 25 ...

Страница 51: ...gging In To the ALOM CMT System Controller on page 29 Using the ALOM CMT System Controller for Common Operations on page 35 Booting the Solaris Operating System on page 39 Powering On the Server for the First Time Power On Overview System Console When you power on the system the boot process begins under the control of the system console The system console displays status and error messages genera...

Страница 52: ...k configuration using Dynamic Host Configuration Protocol DHCP and to allow connections using Secure Shell SSH Note If you are unable to use DHCP and SSH on your network you must connect to the ALOM CMT system controller using the serial management port to reconfigure the network management port See To Configure the System Controller Network Management Port on page 31 Once the network management p...

Страница 53: ...stem console For more information refer to the Advanced Lights Out Management ALOM CMT Guide The system controller runs on the 3 3v standby voltage As soon as AC power is connected to the system the system controller powers on runs diagnostics and initializes the ALOM CMT firmware 1 Connect a terminal or a terminal emulator PC or workstation to the SC serial management port Configure the terminal ...

Страница 54: ...LOM BOOTMON v1 x ALOM Build Release 000 Reset register f0000000 EHRS ESRS LLRS SWRS ALOM POST 1 x Dual Port Memory Test PASSED TTY External Internal Loopback Test TTY External Internal Loopback Test PASSED TTYC Internal Loopback Test TTYC Internal Loopback Test PASSED ETHERNET CPU LOOPBACK TEST PASSED Full VxDiag Tests PASSED Status summary Status 7FFF VxDiag PASSED POST PASSED LOOPBACK PASSED I2C...

Страница 55: ...nagement port To Log In To the System Controller Using the Serial Management Port After the system controller boots you can access the ALOM CMT command line interface to configure and manage the system The sc prompt is displayed the first time the system controller is booted The default configuration provides an ALOM CMT user account called admin There is no default password so you must create a p...

Страница 56: ...The SC network management port is configured by default to retrieve network settings through DHCP and allow connections using SSH After the network management port NET MGT has been assigned an IP address by a DHCP server you can connect to the ALOM CMT system controller using SSH TTYD PASSED TTYC PASSED MEMORY PASSED MPC885 PASSED sc password password Changing password for admin Setting password f...

Страница 57: ...k Management Port Note If your network allows the use of DHCP and SSH this configuration is performed automatically at the first time you boot the system Use this procedure only if If you are unable to use DHCP and SSH on your network If you need to modify the SC network management port settings In this procedure you connect to the ALOM CMT system controller using the serial management port to man...

Страница 58: ...ere the value can be one of the following none telnet ssh netsc_dhcp The system controller obtains its network interface configuration through a DHCP server See the Advanced Lights Out Management ALOM CMT Guide for more information about SSH support in ALOM CMT 3 Choose one of these methods to configure the system controller using information from your network administrator Use DHCP to retrieve th...

Страница 59: ...ters were set correctly sc setsc netsc_ipaddr service processor IPaddr sc setsc netsc_ipgateway gateway IPaddr sc setsc netsc_ipnetmask 255 255 255 0 sc showsc Advanced Lights Out Manager CMT v1 x parameter value if_network true if_connection ssh if_emailalerts false netsc_dhcp true netsc_ipaddr xxx xxx xxx xxx netsc_ipnetmask 255 255 255 0 netsc_ipgateway 0 0 0 0 mgt_mailhost mgt_mailalert sc_cus...

Страница 60: ... bypass the confirmation message specify the y flag to the resetsc command The system controller resets runs diagnostics and returns to the login prompt diag_verbosity normal diag_level max diag_mode normal sys_autorunonerror false ser_baudrate 9600 ser_parity none ser_stopbits 1 ser_data 8 netsc_enetaddr xx xx xx xx xx xx sys_enetaddr yy yy yy yy yy yy sc resetsc Are you sure you want to reset th...

Страница 61: ...t Management ALOM CMT Guide TTYC Internal Loopback Test PASSED TTYD Internal Loopback Test TTYD Internal Loopback Test PASSED Full VxDiag Tests PASSED Status summary Status 7FFF VxDiag PASSED POST PASSED LOOPBACK PASSED I2C PASSED EPROM PASSED FRU PROM PASSED ETHERNET PASSED MAIN CRC PASSED BOOT CRC PASSED TTYD PASSED TTYC PASSED MEMORY PASSED MPC885 PASSED Please login ...

Страница 62: ...stem console This indicates that the system has reset To Connect to the System Console Output from POST OpenBoot and the Solaris OS is displayed in the system console using the console command on the system controller Execute the console command and use the f option to force the console to be attached to your session Multiple users can be connected to the console but only one can be attached sc po...

Страница 63: ...e 0 0 VBSC enabling Full Memory Scrub Find dropin Copying Done Size 0000 0000 0000 1110 Find dropin copied Decompressing Done Size 0000 0000 0006 06e0 Qcpu cpu cpu cpu cpu cpu cpu cpu cpu cpu cpu cpu cpu cpu cpu cpu cpu cpu cpu cpu cpu cpu cpu cpu cpu cpu cpu cpu vpci mem32base mem64base cfgbase e800000000 e000000000 e900000000 pci pci 780 Device 0 pci pci pci 780 pci 0 Device 0 Nothing there pci ...

Страница 64: ... 3 1 Server Device List Identifier Device Device Path Location MB CMP0 Pn cpun cpu n where n 0 31 MB CMP0 CH0 R0 D0 dimm0 CH0 R0 D0 J0501 MB CMP0 CH0 R0 D1 dimm1 CH0 R0 D1 J0601 MB CMP0 CH0 R1 D0 dimm2 CH0 R1 D0 J0701 MB CMP0 CH0 R1 D1 dimm3 CH0 R1 D1 J0801 MB CMP0 CH3 R0 D0 dimm4 CH1 R0 D0 J1001 MB CMP0 CH3 R0 D1 dimm5 CH1 R0 D1 J1101 MB CMP0 CH3 R1 D0 dimm6 CH1 R1 D0 J1201 MB CMP0 CH3 R1 D1 dimm...

Страница 65: ...m Disk 0 ok boot disk0 Boot device pci 7c0 pci 0 pci 8 scsi 2 disk 0 0 File and args Notice Unimplemented procedure encode unit in pci 7c0 pci 0 pci 2 pci 0 LSILogic sas 4 Loading ufs file system package 1 4 04 Aug 1995 13 02 54 FCode UFS Reader 1 12 00 07 17 15 48 16 Loading platform SUNW T1000 ufsboot Loading platform sun4v ufsboot Hostname wgs94 181 The system is coming up Please wait NIS domai...

Страница 66: ...power the system off and on with this procedure 1 Halt the Solaris OS At the Solaris OS prompt issue the init 0 command to halt the Solaris OS and to return to the ok prompt 2 Switch from the system console prompt to the SC console prompt by typing the escape sequence 3 Using the SC console type the poweroff command init 6 init 0 WARNING proc_exit init exited syncing file systems done Program term...

Страница 67: ...41 4 Type the poweron command 5 Reconnect to the system console using the console command The systems displays various messages followed by the ok prompt sc poweron sc SC Alert Host System has Reset sc console f Enter to return to ALOM ...

Страница 68: ...42 SPARC Enterprise T1000 Server Installation Guide April 2007 ...

Страница 69: ...he Firmware Flash Image Overview The flash image consists of the following components System controller firmware OpenBoot POST Reset Comfit Sequencer Partition description Updating the Firmware The flashupdate command updates both the ALOM CMT system controller firmware and the host firmware To use the features and fixes in subsequent firmware releases perform this procedure ...

Страница 70: ...ashupdate SC command updates the system controller flash image and the host firmware The flashupdate command requires the following information IP address of an FTP server on the network that can access the flash image Full path name to the flash image that the IP address can access Username and password of an account registered on the system that is specified by the IP address The command usage i...

Страница 71: ...played on the serial console on the system controller The system controller resets runs diagnostics and returns to the login prompt on the serial console similar to CODE EXAMPLE A 1 sc flashupdate s xxx xxx xx xx f pathname Username username Password password Update complete Reset device to use new image sc sc resetsc Are you sure you want to reset the SC y n y User Requested SC Shutdown CODE EXAM...

Страница 72: ...ull VxDiag Tests PASSED Status summary Status 7FFF VxDiag PASSED POST PASSED LOOPBACK PASSED I2C PASSED EPROM PASSED FRU PROM PASSED ETHERNET PASSED MAIN CRC PASSED BOOT CRC PASSED TTYD PASSED TTYC PASSED MEMORY PASSED MPC885 PASSED sc CODE EXAMPLE A 1 Typical Boot Sequence Following Firmware Update ...

Страница 73: ...des the following topic Connecting the Network Interface to the Network Connecting the Network Interface to the Network To boot from a network you must connect the network interface to the network This procedure assumes that you are familiar with the OpenBoot firmware and that you know how to enter the OpenBoot environment For more information see the SPARC Enterprise T1000 Server Administration G...

Страница 74: ... nondefault boot device variable the Solaris OS specifies the full device path of the boot device Note You can specify the name of the program to be booted as well as the way the boot program operates For more information refer to the OpenBoot 4 x Command Reference Manual for your specific Solaris OS release If you want to specify a network interface other than an on board Ethernet interface as th...

Страница 75: ...cludes the following topic Configuring the System Controller Network Manager Port Configuring the System Controller Network Manager Port To Configure the System Controller Network Management Port To access the system controller using the network for the first time you must first configure the SC network management port through the SC serial management port You set these network parameters accordin...

Страница 76: ...work environment subnet might require a different netmask Use a netmask number most appropriate to your environment 2 Set the IP address for the system controller 3 Set the IP address for the system controller gateway 4 Set the if_network parameter to true 5 Use the showsc command to verify that the parameters were set correctly The showsc command displays all the configuration parameters and thei...

Страница 77: ...rk true if_connection ssh if_emailalerts false netsc_dhcp true netsc_ipaddr xxx xxx xxx xxx netsc_ipnetmask 255 255 255 0 netsc_ipgateway xxx xxx xxx xx mgt_mailhost mgt_mailalert sc_customerinfo sc_escapechars sc_powerondelay false sc_powerstatememory false sc_clipasswdecho true sc_cliprompt sc sc_clitimeout 0 sc_clieventlevel 2 sc_backupuserdata true diag_trigger power on reset error reset diag_...

Страница 78: ...52 SPARC Enterprise T1000 Server Installation Guide April 2007 ...

Страница 79: ...order 47 booting the Solaris OS 39 brackets cable management 20 C cabinet defined 4 cable management bracket description 7 cables adapters for serial data cables 22 cable management bracket 20 connections list 8 component internal installation by qualified service technician 3 configuration information software setup 3 connecting to system console 36 console command 36 41 D default boot device 47 ...

Страница 80: ...ort Gigabit network 8 network management port system controller 8 network setting if_network 31 49 O order of installation procedures 3 P parallel management port 8 parity setting for terminal 27 password command 29 password for admin account setting 30 passwords ALOM CMT 26 pins mounting bracket locating 12 port locations illustrated 8 power cycling the system 40 powering on for the first time 25...

Страница 81: ...nt port 8 powering on 4 powering on for the first time 27 poweron command 36 resetting 34 45 serial management port 8 setsc command 32 50 showsc command 32 50 system messages require terminal or emulator 4 T technician qualified for internal component installation 3 Telnet session 44 terminal configuration settings 27 terminal or emulator for installation 4 tools list 2 slide rail spacing tool 17 ...

Страница 82: ...56 SPARC Enterprise T1000 Server Installation Guide April 2007 ...

Страница 83: ......

Страница 84: ......

Отзывы: