RX600 S6
Service Supplement
21
4
Replacement routines
V
CAUTION!
When handling systems and boards, make sure you observe the safety
information in the
chapter "Safety instructions" on page 17
.
4.1
Preparation
To replace components which are not hot-pluggable, proceed as follows:
Ê
Terminate all applications and shut down the server correctly.
Ê
If your operating system has not switched off the server, press the On/Off
button for 5 seconds.
Ê
Disconnect all AC power cords from the system and wait for at least 15
seconds.
Ê
Disconnect all cables on the rear side of the server.
4.1.1
Opening the server
I
You will find a detailed description of how to open the server in the
"PRIMERGY RX600 S6 Server Options Guide".
Figure 2: Extending the server out of the rack
Содержание PRIMERGY RX600 S6
Страница 1: ...Service Supplement English PRIMERGY RX600 S6 Server Service Supplement August 2011 ...
Страница 6: ...Service Supplement RX600 S6 ...
Страница 14: ...14 Service Supplement RX600 S6 Introduction ...
Страница 16: ...16 Service Supplement RX600 S6 Procedure ...
Страница 54: ...54 Service Supplement RX600 S6 Replacement routines ...
Страница 62: ...62 Service Supplement RX600 S6 Appendix ...