Installing/Removing the Server into/from the Rack
Hardware Installation
Rack with clearance depth differing from 735 mm
For rack systems with clearance depth differing from 735 mm a length
adjustment of the delivered rails is to be made before mounting it into the rack.
This length adjustment is possible within the scope of the slide element.
Ê
Mount the telescopic rails as described in
section “Mounting into the PRIME-
CENTER/DataCenter Rack” on page 38
Ê
Mount the server (see
section “Installing the Server” on page 42
) and route
the cables as described in the original manual of the Rack.
4.2.3
Installing the Server
Figure 8: Preparing the server
Ê
Attach the telescopic rail to the server, one onto each side (see arrow 1 in
). Push the telescopic rails towards the server front until they lock in
place (see arrow 2 in
Ê
Open the telescopic rails completely toward the front. They must click into
place so that you can no longer push them back.
1
1
2
Содержание Primergy RX300 S3
Страница 1: ...PRIMERGY RX300 S3 Operating Manual Edition December 2006 ...
Страница 6: ......
Страница 48: ......
Страница 64: ......
Страница 74: ......
Страница 96: ......
Страница 110: ...110 Operating manual RX300 S3 Index W weight 19 ...
Страница 112: ......