manualshive.com logo in svg
background image

PRIMERGY RX300 S3    

Operating Manual

Edition December 2006

Содержание Primergy RX300 S3

Страница 1: ...PRIMERGY RX300 S3 Operating Manual Edition December 2006 ...

Страница 2: ...according to DIN EN ISO 9001 2000 To ensure a consistently high quality standard and user friendliness this documentation was created to meet the regulations of a quality management system which complies with the requirements of the standard DIN EN ISO 9001 2000 cognitas Gesellschaft für Technik Dokumentation mbH www cognitas de Copyright and Trademarks Copyright 2006 Fujitsu Siemens Computers Gmb...

Страница 3: ...k 30 3 5 Environment Protection 31 4 Hardware Installation 33 4 1 Unpacking the Server 34 4 2 Installing Removing the Server into from the Rack 34 4 2 1 Mounting into the PRIMECENTER DataCenter Rack 38 4 2 2 Mounting into 3rd Party Racks 41 4 2 3 Installing the Server 42 4 3 Connecting Devices to Server 44 4 4 Connecting the Server to the Line Voltage 45 4 5 Instructions on Connecting and Disconne...

Страница 4: ...n Indicator Remains Dark 67 7 2 The Server switches itself OFF 68 7 3 The Monitor Remains Dark 68 7 4 Flickering Stripes Across the Monitor 69 7 5 No Monitor Display or the Display Drifts 69 7 6 No Mouse Pointer Displayed on the Monitor 69 7 7 The Floppy Disk Cannot be Read or Written 70 7 8 Incorrect Time and or Date 70 7 9 System Fails to Boot 70 7 10 Drives Are Reported as Dead 71 7 11 Added Dr...

Страница 5: ... 1 Handling Hard Disk Drives HDD Modules 77 8 2 2 Removing installing the dummy module 78 8 2 3 Installing Removing HDD Module 80 8 2 4 Hot swap for HDD Modules 87 8 3 Replacing a Hot plug Fan 88 8 3 1 Replacing the Fan 89 8 4 Replacing hot plug PCI Boards 90 8 4 1 Mounting the PCI board into the pull out aid 94 8 5 Opening Closing the Housing 95 Abbreviations 97 Related Publications 103 Index 105...

Страница 6: ......

Страница 7: ... provided by the the lockable rack door The rack model occupies 2 height units HU in the rack 1 1 Overview of the Documentation I PRIMERGY manuals are available in PDF format on the ServerBooks DVD The ServerBooks DVD is part of the ServerView Suite delivered with each server system The PDF files for the manuals can also be downloaded free of charge from the Internet The overview page showing the ...

Страница 8: ...ks DVD supplied BIOS Setup PDF file available on the ServerBooks DVD supplied PRIMERGY RX300 S3 Server Options Guide PDF file available on the ServerBooks DVD I The Options Guide describes the server expansion and modifi cation options ServerView Suite includes the ServerStart Disc 1 the ServerStart Disc 2 and the ServerBooks DVD The PDF version of the PRIMERGY ServerView Suite ServerStart user ma...

Страница 9: ...cumentation information files of your operating system see also Related Publications on page 103 1 2 Features System board The features of the system board D2119 are described in the technical manual for the system board in relation to the hardware and in the BIOS setup manual see Related Publications on page 103 Slots for additional boards There are up to fife extension slots for additional contr...

Страница 10: ...ality are indicated by two LEDs 6 and 7 on each slot see section The Rear Side on page 56 Pos Slot No Type Features PCI Board 1 1 standard PCI X 64 bit 133 MHz low profile 2 2 3 3 hot plug PCI express x4 4 4 5 5 standard PCI express x8 Table 1 PCI slots basic configuration ...

Страница 11: ...h SAS SATA hard disk drive with a maximum height of 1 inch 2 5 inch SAS hard disk drives up to twelf 2x6 HDD modules each accomodating one 2 5 inch SAS hard disk drive with a maximum height of 15 mm The module is connected to the SAS SATA backplane without cables This allows hard disk drive modules to be simply plugged in or pulled out for further details see section Hot plug Hard Disk Drives on p...

Страница 12: ...n be upgraded The RX300 S3 comes with an onboard RAID5 processor which can be activitated via an optional upgrading kit SAS MegaRAID PCI Express RAID level 0 1 10 5 and 50 are supported You find further information in the Options Guide see Related Publications on page 103 Accessible drives components Various mounting locations are available one location for a 3 5 inch slimline 1 44 MB floppy disk ...

Страница 13: ...fan units are installed each of them form a redundant unit If one fan in one redundant unit fails the other fan unit ensures operation can continue uninterrupted The defective fan can be replaced online for further details see section Replacing a Hot plug Fan on page 88 Every processor has a heatpipe The processors are cooled additionally by the three and or six CPU fans in the fan units High leve...

Страница 14: ...ty The hot plug HDD modules provide additional availability Server management Server management is implemented with the aid of the supplied ServerView software and PDA Prefailure Detection and Analyzing technology from Fujitsu Siemens Computers PDA reports the threat of a system error or overloading early on so that preventative measures can be taken ServerView enables the management of all PRIMER...

Страница 15: ...RX300 S3 Operating manual 15 Introduction Features Further information on ServerView server management is provided in the associated documentation see Related Publications on page 103 ...

Страница 16: ...t causing damage to the respective component PRIMERGY Diagnostic LEDs arranged on the system board identify the component memory module CPU on the system board that is not functioning correctly The flash EPROM program supplied with the Fujitsu Siemens Computers utilities supports a fast BIOS update The integrated Remote Management Cotnroller iRMC as well as the optional remote test and diagnostics...

Страница 17: ...t of ownership and an excellent return on investment for the remote management solution RemoteView helps switch ON OFF the system remotely monitor systems and analyze the cause of faults prepare error resolution or to have this process initiated independently if possible identify potential sources of error configure the system adjust system settings and initiate system restarts from a remote locat...

Страница 18: ...e performed in the order shown V CAUTION pay particular attention to texts marked with this symbol failure to observe this warning may endanger your life destroy the system or lead to the loss of data I indicates additional information notes and tips Power supply unit Multi range Rated voltage range 100 V 240 V Frequency 50 Hz 60 Hz Rated current in basic configuration 4 2 A 1 4 A 100 V 240 V Max ...

Страница 19: ...class A Interference emission EN 55022 class A Harmonic current EN 61000 3 2 Flicker EN 61000 3 3 Interference immunity EN 55024 International standards FCC class A VCCI class A JEIDA C Tick class A BSMI class A CE label according to EU direc tives Low Voltage Directive 73 23 EEC product safety Electromagnetic Compatibility 89 336 EEC Width without front panel 445 mm Total depth with front panel 7...

Страница 20: ...d Noise level Environment class 3K2 Environment class 2K2 EN 60721 section 3 3 EN 60721 section 3 2 Temperature Operation 3K2 Transport 2K2 15 C 35 C 25 C 60 C Humidity 10 85 Sound power level LWAd ISO 9296 7 1 B standby 7 3 B operating Sound pressure level at bystander position LpAm ISO 9296 57 dB A standby 58 dB A operating ...

Страница 21: ... the server into the rack see section Installing Removing the Server into from the Rack on page 34 Ê Cable the server Please also refer to the section Connecting Devices to Server on page 44 and section Instructions on Connecting and Discon necting Cables on page 47 Ê Connect the system to the line voltage see section Connecting the Server to the Line Voltage on page 45 Ê Make yourself familiar wi...

Страница 22: ...section Configuration with ServerStart on page 60 and or section Configuration without ServerStart on page 61 I For further information on remote or local installation of the server please refer to the ServerStart manual The manual contains a Quick Step Guide A PDF version of the manual is contained on the PRIMERGY ServerBooks DVD ...

Страница 23: ...you can set up the device contact your sales outlet or our customer service team V CAUTION The actions described in these instructions should only be performed by technical specialists Equipment repairs should only be performed by authorized qualified staff Any unauthorized openings and improper repairs could expose the user to risks electric shock energy hazards fire hazards and could also damage...

Страница 24: ...ks and jolts Installation and operation V CAUTION If the rack model is integrated in an installation that receives power from an industrial public power supply network with the IEC309 connector the public power supply protection must comply with the requirements for the non industrial public power supply networks for the type A connector The server automatically sets itself to a voltage in the ran...

Страница 25: ...hazard Route the cables in such a way that they cannot be damaged When connecting up a device refer to the relevant notes in this manual Make sure that no objects such as bracelets or paper clips fall into or liquids spill into the device risk of electric shock or short circuit In emergencies e g damaged casing controls or cables penetration of liquids or foreign matter switch off the device immed...

Страница 26: ...g label e g lightning symbol may only be opened removed or exchanged by authorized qualified personnel The hot plug power supply units are exceptions to this rule Notes on handlingCDs and CD DVD ROM drives V CAUTION Use only CDs in proper condition in the CD DVD ROM drive of your server to prevent data loss damage to the device and injuries Therefore check each CD for damage cracks breakage etc be...

Страница 27: ...ces a stronger laser beam than laser class 1 Direct view into this laser beam is dangerous Never remove parts of the CD DVD ROM drive assembly Batteries V CAUTION Incorrect replacement of batteries may lead to a risk of explosion The batteries may only be replaced with identical batteries or with a type recommended by the manufacturer see the technical manual for the system board If possibly inser...

Страница 28: ...sification as a pollutant Cd Cadmium Hg Mercury Pb Lead Modules with electrostatic sensitive components Systems and components that might be damaged by electrostatic discharge ESD are marked with the following label Figure 3 ESD label When you handle components fitted with ESDs you must observe the following points under all circumstances Remove the power plug s from the power socket s before inse...

Страница 29: ...ortant points When cleaning the device please observe the relevant notes in section Cleaning the Server on page 63 Keep this operating manual and all additional documentation such as the technical manual CD together with the device All documentation should be included if the device is passed on to a third party 3 2 CE Certificate The shipped version of this device complies with the requirements of...

Страница 30: ... Important notes in the technical manual for the corresponding rack The technical manual is supplied with the corre sponding rack Make sure when installing the rack that the anti tilt mechanism is properly mounted For safety reasons no more than one unit may be removed from the rack at any one time during installation and maintenance work If several units are removed from the rack at the same time...

Страница 31: ...on packaging Please do not throw away the packaging You may need it later for transporting your system unit If possible the device should only be transported in its original packaging Information on handling consumables Please dispose of printer consumables and batteries in accordance with the applicable national regulations In accordance with EU directives batteries must not be disposed of with u...

Страница 32: ...Siemens Computers Recycling Center D 33106 Paderborn Tel 49 5251 8 18010 Fax 49 5251 8 18015 The device must not be disposed of with domestic waste This device is labeled in compliance with European directive 2002 96 EG on waste electrical and electronic equipment WEEE This directive sets the framework for returning and recycling used equipment and is valid across the EU When returning your used d...

Страница 33: ...rd Disk Drives HDD Modules on page 77 Avoid the formation of condensation inside and on the outside of the hard disk drives before setting up the server must be acclimatized in its operating environment for an acclimatization time table 3 I The temperature difference in table 3 represents the difference between the operating temperature and the external transport or storage temperature Temperature...

Страница 34: ...Check whether the delivery agrees with the details on the delivery receipt The identification rating plate is located on the rear area on the server Notify your supplier immediately should you discover that the delivery does not correspond to the delivery receipt 4 2 Installing Removing the Server into from the Rack V CAUTION Please observe the safety notes in chapter Important Notes on page 23 an...

Страница 35: ...plied via the socket strips available in the rack The main features of the rack systems of the Fujitsu Siemens Computers are PRIMECENTER Rack Frontally bolted telescopic rails The rails are provided with a linear alignment possibility to ensure also an adjustment to different rack depths Extended cable management within the lateral rack area DataCenter Rack Frontally bolted telescopic rails except...

Страница 36: ...support of the cable management delivered with the mounting kit Climatic conditions For the ventilation of the installed server a large extent unhindered air intake in the rack front and air discharge in the rear cover of the rack are necessary 1 rack front side 2 rack rear side A rack depth comparison PRIMECENTER Rack 940 1000 mm B rack width comparison PRIMECENTER Rack 700 mm C clearance of the ...

Страница 37: ...the ventilation concept plans that the necessary cooling is reached by the horizontal self ventilation of the installed devices air flow from the front to the rear Power supply For the installation in 3rd Party Racks it is to be made certain that appro priate socket strips are present Figure 4 Mechanical conditions ...

Страница 38: ...acket In this section instructions and figures include the vario rail General information are provided in the Technical Manual for the PRIMECENTER and or DataCenter Rack see also Related Publica tions on page 103 For mounting the left telescopic rail in the PRIMECENTER DataCenter Rack the delivered support bracket must first be mounted on the rear left support upright The bracket must be mounted l...

Страница 39: ...igure 6 Removing the outermost telescopic rail Ê Open the telescopic rail completely 1 Ê Unlock the outermost telescopic rail 2 and remove it Ê Repeat the steps with the second telescopic rail I To fasten the telescopic rails no flange nuts are necessary since the rails are equipped with threaded holes ...

Страница 40: ...will clamp the rail between the front left support upright and the support bracket The rail will be adjust automatically in the rack clearance depth Ê Secure the rail on the support upright a and on the support bracket b each with two screws M5x10 including plugwashers 3 Ê Repeat the steps with the right rail to be mounted on the right support uprights Ê Mount the PRIMECENTER DataCenter Rack cable...

Страница 41: ...assistance V CAUTION With the installation in 3rd Party Rack it is to be made certain that the air flow is ensured from the front to the rear in the rack Ê Mount the necessary manufacturer original parts like support bracket or cable management I Sometimes a number of parts of the delivered mounting kit cannot be used because original parts of the 3rd Party Rack are to be used Ê Remove the outermo...

Страница 42: ... rails as described in section Mounting into the PRIME CENTER DataCenter Rack on page 38 Ê Mount the server see section Installing the Server on page 42 and route the cables as described in the original manual of the Rack 4 2 3 Installing the Server Figure 8 Preparing the server Ê Attach the telescopic rail to the server one onto each side see arrow 1 in figure 8 Push the telescopic rails towards ...

Страница 43: ...position the server in the rack Ê Insert the prepared server into the projecting internal telescopic rails 1 until the rails click into place Ê Release the locking mechanism of both rails 2 and insert the server completely into the rack 3 Ê Fasten the server 4 using two knurled screws front panel To remove the server follow the same procedure in the reverse order 2 3 3 4 4 1 ...

Страница 44: ... are marked with symbols and some are color coded Figure 10 Ports and connectors I Some of the devices that can be connected may require special drivers see the documentation for the connected device Ê Connect the data cables to the server and peripherals 1 Mouse port PS 2 green 5 USB port 1 and 2 black 2 LAN port 2 10 100 1000 MBps 6 Serial port COM1 turquoise 3 LAN port 1 10 100 1000 MBps 7 Keyb...

Страница 45: ... deactivated The corresponding monitor port can not be used Plug the data cable of the monitor into the monitor port of the graphics card Ê Connect the power cable of the monitor to the mains socket strip of the rack V CAUTION The rated current for the monitor can be found on the technical data label on the monitor or in the operating manual for the monitor 4 4 Connecting the Server to the Line Vo...

Страница 46: ...re 12 Connecting the server to the line voltage Ê Connect the insulated connector of the power cable to the power supply unit of the server 1 and the power plug into the mains socket strip of the rack see Technical Manual of the rack I A phase redundancy in the power supply of the server can be set up if two hot plug power supply units are installed In this case the two power supply units can be d...

Страница 47: ...nect and disconnect the cables in the order described below Connecting cables Ê Turn off all power and equipment switches Ê Pull all power plugs out of the grounded power sockets Ê Plug all cables into the server and peripherals Ê Plug all data communication cables into the utility sockets Ê Plug all power cables into the grounded power sockets Disconnecting cables Ê Turn off all power and equipme...

Страница 48: ......

Страница 49: ...age 50 Operating elements ON OFF button When the system is switched OFF it can be switched ON again by pressing the ON OFF button When the system is operating pressing the ON OFF button will switch OFF the system I The ON OFF button does not disconnect the server from the mains To disconnect from the mains completely remove the power plug s NMI NMI button I Please do not press The NMI button may o...

Страница 50: ...e ID button is pressed The two ID indicators are synchronized 1 HDD BUSY indicator 7 Drive access indicator 2 HDD FAULT indicator 8 Global Error indicator 3 Floppy disk drive indicator 9 ON OFF button 4 ID indicator 10 NMI button 5 ID button 11 Reset button 6 Power on indicator 12 CD ROM DVD ROM indicator Power on indicator bicolor Lights orange when the server is switched OFF but mains voltage is...

Страница 51: ...ce incident or critical event has occurred Lights orange when a prefailure event has been recognized Users can check system and eventlog or via ServerView for event details Flashes orange when a critical event has occurred Users can check BIOS Setup system and eventlog or via ServerView for event details If the event is still acute after a power failure the indicator is activated after the restart...

Страница 52: ...ments Preparation for Use and Operation Indicators on the optional USB hot plug tape drive Figure 14 USB Hot plug tape drive Hard disk drive indicators Figure 15 3 5 inch HDD module indicators 1 Clean indicator 2 Media indicator 3 Drive indicator Table 4 123 ...

Страница 53: ...h a RAID controller does not light No HDD Error lights HDD Faulty or Rebuild Stopped drive defective needs replacing a rebuild process was stopped or the HDD module is not correctly inserted slow blink HDD Rebuild the data is restored by the RAID controller after changing a hard disk drive fast blink HDD Identify four fast blinks pause HDD Predicted Fault two fast blinks pause HDD Hot Spare Hot sp...

Страница 54: ...lug PSU see page 57 1 Global Error indicator orange Does not light when the system is ok No service incident or critical event has occurred Lights orange when a prefailure event has been recognized Users can check system and eventlog or via ServerView for event details Flashes orange when a critical event has occurred Users can check BIOS Setup system and eventlog or via ServerView for event detai...

Страница 55: ...indicators are synchronized The ID indicator can also be activated via ServerView and its status reported to ServerView 3 LAN transfer rate indicator bicolor Lights orange for a LAN transfer rate of 1 Gbps Lights green for a LAN transfer rate of 100 Mbps Does not light for a LAN transfer rate of 10 Mbps or there is no LAN connection available 4 LAN active indicator green Lights green when a LAN co...

Страница 56: ...t light Device operating PCI slot is in enable or disable sequence Wait until the green LED has changed its status does not light after disable or lights after enable sequence lights does not light Device operating PCI slot powered up No board may be installed or removed does not light lights Device operating a problem has occurred There are two possible causes for this status The MRL sensor was p...

Страница 57: ... set via commands in the server management Power indicator 6 green Error indicator 5 orange Status description does not light does not light Device switched OFF lights does not light Device operating PCI slot powered up Table 6 Operating system without hot plug functionality hot plug PCI indicator modes LED Color State Meaning 7 Operation orange ON Line Voltage OK standby mode green ON Server oper...

Страница 58: ... ON OFF button position 9 in figure 13 on page 50 Ê Insert the ServerStart DVD and or an installation disk in the corre sponding drive Ê Follow the instructions on the monitor see also section Configuration with ServerStart on page 60 and or section Configuration without ServerStart on page 61 System already installed Ê Press the ON OFF button position 9 in figure 13 on page 50 The server is switc...

Страница 59: ...ing ways Specified switch on time switch off time The server is switched ON or OFF at a time specified in the ServerView program Ring indicator The server is switched ON via an internal or external modem Wake On LAN WOL The server is switched on by a command via the LAN Magic Package After power failure The server automatically reboots following a power failure depending of the settings in the BIO...

Страница 60: ...e Integrated Mirroring User s Guide on the ServerBooks DVD choose Controllers from the menu With the ServerStart DVD provided you can configure the server and install the operating system in a convenient manner The menu guided configuration includes the server configuration with the SCU and the RAID configuration with the GAM Global Array Manager I Descriptions of operating systems not covered in ...

Страница 61: ...board SAS controller configuration in the Technical Manual for the system board see Related Publications on page 103 The configuration of the RAID functionality will be accomplished with the GAM Global Array Manager see Related Publications on page 103 Configuring the PCI RAID controller If your server is fitted with a PCI RAID controller you must configure it as described in the related documenta...

Страница 62: ...4 The possible indicator modes and their meaning are explained in table 5 on page 56 and table 6 on page 57 If it is attempted to remove the relevant board despite the illuminated green indicator the slot is automatically powered off to protect the board and the system from any damage an NMI is initiated blue screen system reboot necessary V CAUTION Not all currently available operating systems su...

Страница 63: ...e this job to a service technician Do not use any cleaning agents that contain abrasives or may corrode plastic Ensure that no liquid enters the system Ensure that the ventilation areas of the server and the monitor are clear Clean the keyboard and the mouse with a disinfecting cloth Wipe the server and monitor casing with a dry cloth If particularly dirty use a cloth that has been moistened in a ...

Страница 64: ......

Страница 65: ...s DVD see also Related Publications on page 103 Preventing unauthorized BIOS Setup calls You can activate this protection by entering a setup password in the Security menu In addition you can suppress the Press F2 for Setup message in the Security menu This message is then no longer displayed while the server s startup routine is in progress Preventing unauthorized system access You can activate t...

Страница 66: ...from being overwritten To activate this protection select the value Disabled for the Flash Write field in the Security menu Protecting the server from being switched on by an external device To activate this protection select the value Disabled for the Remote Power On field in the Security menu Protecting the server from being switched off by a program To activate this protection select the value ...

Страница 67: ... list of the steps and the circumstances that led to the fault Also make a list of any error messages that were displayed Ê Switch OFF the server Ê Contact our customer service team 7 1 Power On Indicator Remains Dark The power on indicator remains dark after switching ON Power cord incorrectly connected Ê Make sure that the power cable is correctly connected to the server and to the grounded sock...

Страница 68: ...e appropriate password Brightness control is set to dark Ê Set the brightness control on the monitor to light For detailed information please refer to the Operating Manual supplied with your monitor Power cable or monitor cable not connected Ê Switch OFF the monitor and the server Ê Check whether the power cable is properly connected to the monitor and to the grounded socket Ê Check whether the mo...

Страница 69: ...ingly 7 5 No Monitor Display or the Display Drifts The wrong horizontal frequency or resolution has been selected for the monitor or for the application program Ê Find out which horizontal frequency your monitor screen supports You will find the horizontal frequency also known as line frequency or horizontal deflection frequency in the documentation for your monitor Ê Refer to the documentation fo...

Страница 70: ...Ê Check in the BIOS Setup whether the floppy disk drive controller and write permission are enabled see technical manual for system board on the PRIMERGY ServerBooks DVD 7 8 Incorrect Time and or Date Ê Set the time and or date in the operating system or in BIOS Setup I If the time and date are repeatedly wrong when you switch ON your server you must change the lithium battery Contact our Service ...

Страница 71: ... provided in the manual on the RAID controller 7 11 Added Drive Reported Defective RAID controller is not configured for this hard disk drive The drive was probably installed when the system was switched OFF Ê Reconfigure the RAID controller for the drive with the corresponding utility Information is contained in the documentation on the RAID controller or Ê Reinstall the drive while the system is...

Страница 72: ...ressed an NMI is initiated Blue Screen Ê Press the ON OFF button for longer than five seconds or remove the power plug s Ê Reboot the server 7 13 Hot Plug PCI Power Indicator not Lighting after Replacing the Board Incorrect PCI board installed Only PCI boards of the same type and with the same settings may be exchanged If the boards do not match the new board is not commissioned the enable sequenc...

Страница 73: ...ctly Ê Repeat the enable process see section Replacing hot plug PCI Boards on page 90 If the error occurs again it is probable that the PCI board is defective Ê Repeat the enable process with a new PCI board If the error continue to occur contact our Service group 7 14 Error Messages on the Monitor The meanings of the error messages are explained in the manual for the BIOS Setup and in the documen...

Страница 74: ......

Страница 75: ...ower Supply Units I A redundant power supply can be created by installing a second hot plug power supply unit optional If one power supply unit fails the other unit ensures operation can continue The defective power supply unit can be replaced online hot swap 8 1 1 Removing the Dummy Module The slot for the second power supply unit is provided with a dummy module that must be removed before instal...

Страница 76: ... replacing a non defective power supply unit in a non redundant configuration only one power supply unit present the server must be switched OFF Ê Remove the cable from the installed power supply unit Ê Push the transport look green latch in the direction of the arrow 1 and pull the power supply unit out of the location 2 Ê Insert the new power supply unit in the empty location until it engages I ...

Страница 77: ...ge 87 8 2 1 Handling Hard Disk Drives HDD Modules Hard disk drives incorporated in the HDD modules are highly sensitive electro magnetic devices and must be handled with great care It is as likely as not that incorrect handling will lead to partial and or total failure of the hard disk drives These failures will result in data errors and to loss of data or to total corruption of the hard disk driv...

Страница 78: ...h dummy module Ê Press both tabs on the dummy module together see figure 19 until the locking mechanism disengages and remove the dummy module from the mounting location The dummy module is installed in the reverse order V CAUTION Keep the dummy module for future use If the HDD module is removed again and not replaced with a new module the dummy module must be reinstalled due to cooling to comply ...

Страница 79: ... locking mechanism disengages 1 and remove the dummy module from the mounting location 2 The dummy module is installed in the reverse order V CAUTION Keep the dummy module for future use If the HDD module is removed again and not replaced with a new module the dummy module must be reinstalled due to cooling to comply with applicable EMC regulations regulations on electromagnetic compatibility and ...

Страница 80: ...o their original place after an upgrade If this is not taken into account existing data can be destroyed I So that the storage capacity of the hard disk can be recognized at a glance when the hard disk drive is replaced several prefabricated stickers with the storage capacities are provided with the server Each HDD module should bear a sticker indicating its capacity on the front position 5 in fig...

Страница 81: ...ivered as HDD modules with the hard disk drives preinstalled on carriers The hard disk drive may only be removed from the carrier by personnel with the appropriate technical training in compliance with the appropriate ESD guide lines see section Modules with electrostatic sensitive components on page 28 Figure 21 3 5 inch HDD module and dummy cover ...

Страница 82: ... carrier with installed hard disk drive 2 Indicators HDD busy LED green HDD fault LED orange Description see table on page 52 in section Hard disk drive indicators 3 Handle for locking and unlocking of the hard disk drive module 4 Locking button 5 Ridge for the application of a sticker with the current drive identifier 6 Dummy module 7 Locking tabs ...

Страница 83: ...5 inch HDD module Ê Open the locking mechanism by pressing the locking button 1 Ê Push the handle of the HDD module fully in the direction of the arrow I If the HDD modules are provided with a transport lock 1 in the next figure remove these before you open the locking mechanism Figure 24 3 5 inch HDD module removing the transport lock ...

Страница 84: ...Disk Drives Hot plug Components Unlocking the 2 5 inch HDD module Figure 25 Unlocking the 2 5 inch HDD module Ê Open the locking mechanism by pressing the locking button 1 Ê Push the handle of the HDD module fully in the direction of the arrow 2 ...

Страница 85: ...e Figure 26 Installing the 3 5 inch HDD module Ê Unlock the HDD module as described in Unlocking the 3 5 inch HDD module on page 83 Ê Carefully push the HDD module into the empty slot 1 until it stops Ê Push the handle completely in the direction of the arrow 2 until the locking mechanism 3 engages 4 2 3 4 1 ...

Страница 86: ...s no further 3 5 inch HDD modules can be installed Figure 27 Installing the 2 5 inch HDD module Ê Unlock the HDD module as described in Unlocking the 2 5 inch HDD module on page 84 Ê Carefully push the HDD module into the empty slot 1 until it stops Ê Push the handle completely in the direction of the arrow 2 until the locking mechanism 3 engages 4 ...

Страница 87: ... operation proceed as follows Ê If you want to remove a HDD module that is not defective set the drive first to offline via the software RAID controller configuration software Ê Now pull out the HDD module a few centimeters Ê Wait for at least 60 seconds I This period is necessary for the RAID controller to recognize that a HDD module has been pulled out and for the hard disk drive to come to a st...

Страница 88: ...ble due to cooling to comply with applicable EMC regulations regulations on electromag netic compatibility and to protect against fire The maximum opening time of the housing cover amounts to 15 minutes The server is at least equipped with one fan unit which includes four hot plug fans The server can be upgraded with a second fan unit with four hot plug fans The prefailure of a fan is notified by ...

Страница 89: ...e 28 Arrangement of the fans Ê Identify which fan is defective by the LED 19 24 lights flashes orange Figure 29 Removing fan Ê Pull the green handle in the direction of the arrow 1 and disengage the locking mechanism Ê Remove the fan from the cartridge 2 Fan 4 CPU Fan 5 CPU Fan 6 CPU Fan 2 sys Fan 1 sys Fan 1 CPU Fan 2 CPU Fan 3 CPU L23 L24 L21 L22 L27 L28 L25 L26 Front ...

Страница 90: ...CAUTION The actions described in this section may only be performed by personnel with the appropriate technical training Any unauthorized openings and improper repairs could expose the user to risks electric shock fire hazards and could also damage the equipment Please observe the safety information in chapter Important Notes on page 23 In order to replace a hot plug PCI board the housing cover mu...

Страница 91: ...ng Closing the Housing on page 95 Ê If necessary start the PCI hot plug software PCI Card HotReplace You will find operating instructions in the file README for the PCI Hot Plug Software V3 0 on the ServerStart DVD Ê Deactivate the board using the relevant PCI hot plug software or by pressing the button a see figure 30 on page 92 The power indicator for the hot plug PCI slot see table 5 on page 56...

Страница 92: ...t are not lighting The locking slide activates the MRL sensor which informs the operating system that the PCI slot has been deactivated If the MRL sensor is activated without authorization one of the LEDs is still lighting and there is a board in the PCI slot an NMI is initiated blue screen This state cannot be exited There is a risk that data may be lost Ê Remove all cables attached to the board ...

Страница 93: ... move it in the direction of the server front side Ê Activate the board using the relevant software or by pressing the button a The power indicator for the hot plug PCI slot see table 5 on page 56 flashes green The slot is in the enable sequence Ê Wait until the power indicator lights constant The slot is now powered on I If the boards do not match the new board will not be commissioned see sectio...

Страница 94: ...rd it must be mounted into the pull out aid Figure 31 Mounting the PCI board into the pull out aid Ê Press the two green snap fits down completely 1 and remove it from the guidances 2 Ê Place the PCI board into the slot of the pull out aid 3 Ê Carefully press down the green snap fits 4 until the PCI board is fixed Do not jam the board 2 1 3 2 1 4 4 ...

Страница 95: ...nt Please observe the safety information in chapter Important Notes on page 23 V CAUTION The housing cover must be replaced as fast as possible due to cooling to comply with applicable EMC regulations regulations on electromag netic compatibility and to protect against fire The maximum opening time of the housing cover amounts to 15 minutes Figure 32 Opening the housing Ê Push the two locking butt...

Страница 96: ......

Страница 97: ...Server Reconfiguration and Restart ATA Advanced Technology Attachments BIOS Basic Input Output System BMC Baseboard Management Controller CC Cache Coherency CD Compact Disk CD ROM Compact Disk Read Only Memory CHS Cylinder Head Sector CMOS Complementary Metal Oxide Semiconductor COM Communication CPU Central Processing Unit ...

Страница 98: ...irect Memory Access DMI Desktop Management Interface ECC Error Checking and Correcting ECP Extended Capabilities Port EEPROM Electrically Erasable Programmable Read Only Memory EMC ElectroMagnetic Compatibility EMP Emergency Management Port EPP Enhanced Parallel Port ESD ElectroStatic Discharge FPC Front Panel Controller ...

Страница 99: ...rray Manager GUI Graphical User Interface HDD Hard Disk Drive HSC Hot Swap Controller I C Inter Integrated Circuit I O Input Output ICM Intelligent Chassis Management ID Identification IDE Intergrated Drive Electronics IME Intergrated Mirroring Enhanced IRQ Interrupt Request Line LAN Local Area Network ...

Страница 100: ...ber LVD Low Voltage Differential SCSI MMF Multi Mode Faser MRL Manually Retention Latch NMI Non Maskable Interrupt NVRAM Non Volatile Random Access Memory OS Operating System PCI Peripheral Component Interconnect PDA Prefailure Detection and Analysing POST Power ON Self Test RAID Redundant Arrays of Independent Disks ...

Страница 101: ...e Clock RTDS Remote Test und Diagnose System SAF TE SCSI Accessed Fault Tolerance Enclosures SAS Serial Attached SCSI SATA Serial ATA SBE Single Bit Error SCA Single Connector Attachment SCSI Small Computer System Interface SDDC Single Device Data Correction SDR Sensor Data Record SDRAM Synchronous Dynamic Random Access Memory ...

Страница 102: ... Operating manual RX300 S3 Abbreviations SEL System Event Log SMI System Management Interrupt SSU System Setup Utility SVGA Super Video Graphics Adapter USB Universal Serial Bus VGA Video Graphics Adapter ...

Страница 103: ...umentation available in the Internet can be found via the URL http manuals fujitsu siemens com choose industry standard servers 1 Safety notes and other important information 2 Warranty 3 Ergonomics 4 Returning used devices 5 PRIMECENTER Rack Technical Manual 6 PRIMECENTER LC Rack Technisches Handbuch 7 DataCenter Rack Technical Manual 8 LocalView User Manual 9 PRIMERGY ServerView Suite ServerStar...

Страница 104: ...iew User Manual 14 PRIMERGY RX300 S3 Options Guide 15 System Board D2119 Technical Manual 16 BIOS Setup Reference Manual 17 Integrated Mirroring User s Guide 18 Global Array Manager Client Software User s Guide 19 Global Array Manager Server Software User s Guide ...

Страница 105: ...keyboard 63 closing housing 95 components hardware software 7 configuring server 16 60 connecting cables 47 external devices 47 connectors power supply 44 Consumables 31 control panel 49 correcting error 67 CPU fans 13 D data manipulation 7 data protection 65 DataCenter Rack requirements 35 delivery note 34 devices connecting to the server 44 disconnecting cables 47 Disposal devices 32 drive dead ...

Страница 106: ...tem 13 fault display drifts 69 screen dark 69 screen shows flickering stripes 69 system does not boot 70 features 9 flash EPROM 16 floppy disk cannot be read or written 70 floppy disk drive indicator 50 51 G GAM 60 Global Array Manager GAM 60 Global Error indicator 50 51 54 graphics card 45 H hard disk drive 11 carrier 77 handling 77 HDD module 77 hot plug 77 indicator 51 52 online replacing 87 HD...

Страница 107: ...tape drive 52 information additional 9 installing PCI hot plug software 62 server 42 installing in 3rd Party Rack 41 PRIMECENTER Rack 38 Integrated Mirroring Enhanced IME 60 61 L Labels 31 LAN active indicator 55 LAN connection indicator 55 light emitting diode LED 27 lithium battery 27 LocalView module 12 low voltage directive 18 29 M mains voltage connecting the server 45 meaning of the symbols ...

Страница 108: ...ction 65 R rack requirements 35 RAID controller configuring 61 not configured for hard disk drive 71 RAID level 14 Recycling devices 32 redundancy fans 13 power supply 13 reliability 13 RemoteView 16 replacing hot plug PCI board 90 requirements 3rd Party Rack 36 DataCenter Rack 35 PRIMECENTER Rack 35 reset button 49 50 Return of devices 32 routing cables 40 S safety 23 saving energy 31 screen erro...

Страница 109: ... 34 USB port 44 ventilation clearance 19 weight 19 server management 14 ServerStart 16 60 ServerView 14 supported functions 14 service PRIMERGY Diagnostic LED 16 server 16 touch point 16 setup password 65 standards 18 startup hot plug PCI slot 62 server 49 support bracket 38 switching OFF server 58 switching ON server 58 switch OFF time define 59 switch ON time define 59 system fans 13 system boar...

Страница 110: ...110 Operating manual RX300 S3 Index W weight 19 ...

Страница 111: ...Betriebsanleitung RX300 S3 Comments Suggestions Corrections Submitted by Fujitsu Siemens Computers GmbH User Documentation 81730 München Germany Fax 0 700 372 00000 e mail manuals fujitsu siemens com http manuals fujitsu siemens com ...

Страница 112: ......

Страница 113: ...tsu com Copyright Fujitsu Technology Solutions 2009 Hinweise zum vorliegenden Dokument Zum 1 April 2009 ist Fujitsu Siemens Computers in den alleinigen Besitz von Fujitsu übergegangen Diese neue Tochtergesellschaft von Fujitsu trägt seit dem den Namen Fujitsu Technology Solutions Das vorliegende Dokument aus dem Dokumentenarchiv bezieht sich auf eine bereits vor längerer Zeit freigegebene oder nic...

Отзывы: