
30
Upgrade and Maintenance Manual
RX2520
M4
Before you start
2.2
Average task duration
The average task duration including preliminary and concluding steps is
indicated at the beginning of each procedure next to the procedure class.
The following table gives an overview of steps taken into account for
calculating the average task duration:
Hardware: 10 minutes
Step
included
Explanation
Server shutdown
no
Shutdown time depends on hardware and
software configuration and may vary
significantly.
For Software tasks necessary before
maintenance, see section
.
Rack removal,
disassembly
yes
Making the server available, removing the
server from the rack (if applicable)
Transport
no
Transporting the server to the service table
(where required) depends on local
customer conditions.
Maintenance
procedures
yes
Maintenance procedures including
preliminary and concluding software tasks
Transport
no
Returning the server to its installation site
(where required) depends on local
customer conditions.
Assembly,
rack installation
yes
Reassembling the server, installing the
server in the rack (if applicable)
Starting up
no
Booting time depends on hardware and
software configuration and may vary
significantly.
Table 1: Calculation of the average task duration
Содержание PRIMERGY RX2520 M4
Страница 6: ...6 Upgrade and Maintenance Manual RX2520 M4 ...
Страница 22: ...Upgrade and Maintenance Manual RX2520 M4 Content ...
Страница 98: ...98 Upgrade and Maintenance Manual RX2520 M4 Basic software procedures ...
Страница 118: ...118 Upgrade and Maintenance Manual RX2520 M4 Power supply unit PSU ...
Страница 194: ...194 Upgrade and Maintenance Manual RX2520 M4 Fans ...
Страница 232: ...232 Upgrade and Maintenance Manual RX2520 M4 Expansion cards and backup units ...
Страница 310: ...310 Upgrade and Maintenance Manual RX2520 M4 Accessible drives ...
Страница 338: ...338 Upgrade and Maintenance Manual RX2520 M4 Front panel ...
Страница 346: ...346 Upgrade and Maintenance Manual RX2520 M4 Serial interface Ê Switching on the server on page 60 ...
Страница 410: ...410 Upgrade and Maintenance Manual RX2520 M4 Appendix A ...
Страница 412: ...412 Upgrade and Maintenance Manual RX2520 M4 Appendix B ...
Страница 413: ...FUJITSU Server PRIMERGY RX2520 M4 System Cabling Overview System Cabling Overview English Cable plan for June 2018 ...
Страница 451: ...List of all used screws for PRIMERGY Servers Assembled in Germany and Japan January 2017 ...