RX200 S3
Operating Manual
33
Hardware Installation
Installing/Removing the Server in/from the Rack
3rd party rack
Certain general conditions must be met:
–
Installation dimensions (see the dimensions shown in
–
You must ensure that the safety mechanisms on the server, e.g. stoppers or
retaining systems, are functioning correctly.
–
The shape of the rack support uprights must ensure that the rails can be
bolted to the front.
–
Telescopic rails screwed to the front
The rails have a linear alignment feature to ensure that they can be adjusted
to different rack depths.
–
No support of the cable management (delivered with the mounting kit).
–
Climatic conditions.
An unobstructed air intake in the rack front and air discharge in the rear
cover of the rack are essential for ventilation of the installed server.
1
Front of rack
2
Rear of rack
A
Rack depth (comparison PRIMECENTER Rack 940/1000 mm)
B
Rack width (comparison PRIMECENTER Rack 700 mm)
C
Clearance for 19" installation level
C1
Front 19" installation level
C2
Rear 19" installation level
D
Cable routing area (cable area depth) and ventilation
E
Space for front panel and ventilation
F
Space for right and left support systems
P
PRIMERGY rack installation depth
a1
Front left support upright
a2
Front right support upright
b1
Rear left support upright
b2
Rear right support upright