
50
Operating Manual
CX420
S1
Starting up and operation
Switching the server node on
Ê
Press the On/Off button of the desired server node on the rear or on the
front.
Then the power-on indicator lights up green.
–
Starting up for the first time:
For the Japanese market, please refer to "
はじめにお読みください
".
Ê
Insert ServerView Suite DVD 1 in the DVD drive.
Ê
Follow the on-screen instructions (for further details see Operating
Manual of the installed server node).
–
System already installed
:
Ê
The server node is switched on, performs a system test and boots the
operating system.
I
In the case of configurations with a large memory size, the boot
process may be prolonged and the screen may remain dark for about
20 seconds.
Switching the server node off
Ê
Shut down the operating system properly.
The power-on indicator (item 1 in figure
) is off.
I
If the operating system does not switch the server node off automatically,
press the On/Off button of the desired server node on the rear or on the
front for at least four seconds and/or send a corresponding control signal
for power-on indicator override.
Other On/Off options
Besides the On/Off button, the server node can be switched ON and OFF in the
following ways:
–
Wake up On LAN (WOL)
The server node is switched on by a command via the LAN (Magic
Packet™).