22
Operating Manual
CX420
S1
Important information
Before starting up
V
CAUTION!
●
During installation and before operating the device, observe the
instructions on environmental conditions for your device (see
Node Cluster Server specification" on page 13
●
If the Dual Node Cluster Server has been moved from a cold
environment, condensation may form both inside and on the outside
of the machine.
Wait until the Dual Node Cluster Server has acclimatized to room
temperature and is absolutely dry before starting it up. Material
damage may be caused to the Dual Node Cluster Server if this
requirement is not met.
●
Only transport the Dual Node Cluster Server in the original packaging
or in packaging that protects it from impacts and jolts.
Installation and operation
V
CAUTION!
●
This unit should not be operated in ambient temperatures above
35 °C.
●
If the unit is integrated into an installation that draws power from an
industrial power supply network with an IEC309 connector, the PSU's
fuse protection must comply with the requirements for non-industrial
power supply networks for type A connectors.
●
The unit automatically adjusts itself to a mains voltage in a range of
200 - 240 V(High Line) or 100 - 240 V (Wide Range); depends on
which PSU option is used. Ensure that the local mains voltage lies
within these limits.
●
This device must only be connected to properly grounded power
outlets or insulated sockets of the rack's internal power supply with
tested and approved power cords.
●
Ensure that the device is connected to a properly grounded power
outlet close to the device.