![Fujitsu MAW3073 SERIES Скачать руководство пользователя страница 149](http://html.mh-extra.com/html/fujitsu/maw3073-series/maw3073-series_specifications_121513149.webp)
C141-C011
1-131
Note:
These requirements shall be satisfied if any device supplies the TERMPWR.
b. Single-ended output signal characteristics
An active negate driver shall be used for single-ended line signals. This driver can be in the Assert,
Negate, or High-Impedance state. Each signal supplied by the SCSI device shall have the following
output characteristics when measured at the connector position of SCSI device:
1) V
OL
(Low-level output voltage) = 0.0 to 0.5 VDC if I
OL
=48 mA (Signal assert state)
2) V
OH
(High-level output voltage) = 2.5 to 3.7 VDC (Signal negate state)
3)
The output characteristics (in signal negate state) shall be limited to allow operations in
the non-shaded areas only of Figure 1.53.
Содержание MAW3073 SERIES
Страница 6: ...This page is intentionally left blank ...
Страница 18: ...This page is intentionally left blank ...
Страница 27: ...C141 C011 1 9 M M 0 61 5 16 0 001 0 396 Figure 1 5 SCSI interface connector cable side 16 bit SCSI ...
Страница 61: ...C141 C011 1 43 2 SE Fast 20 Figure 1 21 is the Fast 20 measurement point Figure 1 21 Fast 20 Measurement Point ...
Страница 69: ...C141 C011 1 51 Figure 1 26 ARBITRATION phase ...
Страница 116: ...1 98 C141 C011 Figure 1 43 Bus phase sequence 1 of 2 ...
Страница 117: ...C141 C011 1 99 Figure 1 43 Bus phase sequence 2 of 2 ...
Страница 118: ...1 100 C141 C011 Figure 1 44 Example of bus phase transition at execution of a single command 1 of 5 ...
Страница 119: ...C141 C011 1 101 Figure 1 44 Example of bus phase transition at execution of a single command 2 of 5 ...
Страница 120: ...1 102 C141 C011 RESELECTION Figure 1 44 Example of bus phase transition at execution of a single command 3 of 5 ...
Страница 121: ...C141 C011 1 103 Figure 1 44 Example of bus phase transition at execution of a single command 4 of 5 ...
Страница 122: ...1 104 C141 C011 Figure 1 44 Example of bus phase transition at execution of a single command 5 of 5 TASK COMPLETE ...
Страница 127: ...C141 C011 1 109 Figure 1 47 SPI information unit sequence during initial connection ...
Страница 128: ...1 110 C141 C011 Figure 1 48 SPI information unit sequence during data type transfers ...
Страница 129: ...C141 C011 1 111 Figure 1 49 SPI information unit sequence during data stream type transfers ...
Страница 130: ...1 112 C141 C011 Figure 1 50 SPI information unit sequence during status transfers ...
Страница 154: ...1 136 C141 C011 Figure 1 56 Connection to the LVD receivers ...
Страница 160: ...2 2 C141 C011 Figure 2 1 Message format ...
Страница 165: ...C141 C011 2 7 Figure 2 2 SCSI pointer configuration ...
Страница 200: ...This page is intentionally left blank ...
Страница 204: ...This page is intentionally left blank ...
Страница 206: ...This page is intentionally left blank ...
Страница 208: ...This page is intentionally left blank ...
Страница 209: ......
Страница 210: ......