30
Operating Manual
ETERNUS JX40 S2
Rack mounting
Installation
© c
o
g
n
it
as
. Ges
e
lls
c
h
ft
fü
r
T
e
c
hnik
-Dok
u
ment
at
ion mbH 2015
Pf
ad:
C:
\Us
e
rs
\guda
t\
Doc
u
ment
s
\___
___F
T
S
\_
ST
O
R
A
G
E\
J
X
40_
S2\
F
M\
s
x
4
0
-ba
-en\
s
x
40
-ba-en
.k
08
Ê
On the front of the rack, place the screws in the appropriate holes of the
support upright and screw the sliding rails tight at the 19“ profiles on the
front.
Figure 7: Position of the cage nuts (front side of the rack, left support upright as example)
Ê
Place the cage nuts for fastening the subsystem in the appropriate holes of
the front support uprights.
Ê
Put the subsystem on the support angles of the sliding rails and push the
subsystem into the rack as far as it will go.
The following steps can be performed by a single person:
Figure 8: Fastening the 2.5" subsystem
Figure 9: Fastening the 3.5" subsystem
Ê
Secure the subsystem within the rack using the two screws on each side.