![Fujitsu BS2000 Скачать руководство пользователя страница 7](http://html.mh-extra.com/html/fujitsu/bs2000/bs2000_operating-manual_120935007.webp)
U41860-J-Z126-1-76
7
D
ok
us
ch
a
bl
on
en 1
9x
24 V
e
rs
ion 7.
4
us
fü
r F
ram
e
M
ak
er
V
7
.x
vo
m
0
9.
02
.2
010
©
c
og
ni
ta
s G
m
bH
2
001
-2
010
D
ok
us
chab
lone
n 19
x2
4 V
er
si
o
n 7.
4u
s f
ür
F
ram
e
M
ak
er
V
7
.x
vo
m
09
.02.
20
10
©
c
og
ni
ta
s Gm
b
H
20
01
-20
10
2
9.
J
un
e 20
15 S
ta
nd
1
4:
43
.1
3
P
fad
: P
:\
F
T
S
-B
S
\S
e
rv
er
\S
E
-S
e
rv
er
\S
E
-D
ok
u\
1
303
908
_B
A
_S
U
_x
86
\p
ro
d_e
\b
a_
su
x8
6.
k0
3
2 Server Unit SU300
This section describes the Server Unit SU300. SE300 is equipped with an SU300 as the
first Server Unit. SE300, SE500 and SE700 can optionally be equipped with one or two
additional Server Units SU300.
i
Components and ports which are not used are not described below.
In the SU300 the base system X2000 enables BS2000 to execute (in Native mode or on
BS2000 VMs). Optionally X2000 enables Linux/Windows systems to operate in parallel on
XenVMs.
A SU300 occupies four height units (HUs) in the rack.
Features
–
16 models are available with up to 16 BS2000 processors. Capacity on Demand
permits temporary processor attachment.
–
Depending on the model, the size of the main memory (for BS2000 and for the base
system X2000) is 32 to 64 GB in the basic configuration. All models can be enhanced
to 1504 GB.
–
For the input/output system the Server Unit contains two 2.5'' SATA hard disks, each
with a capacity of 600 GB in size in the basic configuration, which are mirrored.
–
The Server Unit contains a DVD-RW drive.
–
Fibre Channels operating at 8 or 16 Gbps are available for connecting peripherals.
–
At least one 4-port LAN card is connected on the Server Unit. The first two ports are
used for the connection to the Net Unit, and the other two can, if required, be used for
BS2000 applications. Optionally LAN controllers operating at 10 Gbps can also be
used.
–
Each Server Unit is equipped with 4 power supply units. 2 + 2 redundancy in 2 phases
is thus guaranteed. If one phase fails completely, the Server Unit will continue to
operate.
Содержание BS2000
Страница 1: ...Edition June 2015 English SE700 SE500 SE300 Server Unit x86 FUJITSU Server BS2000 Operating Manual ...
Страница 4: ...Contents U41860 J Z126 1 76 Related publications 27 Index 29 ...
Страница 6: ...6 U41860 J Z126 1 76 ...
Страница 24: ...Rear of the Server Unit Server Unit SU300 24 U41860 J Z126 1 76 ...
Страница 28: ...Related publications 28 U41860 J Z126 1 76 ...
Страница 30: ...Index 30 U41860 J Z126 1 76 ...