En-11
2
Band
Drain
hole
1
Joint hose
Hard PVC side
(2) Be sure to insert Joint hose
1
to the very end of the Drain
pan of the unit with no space.
Ensure there
is no space.
Applying
area of
adhesive
Joint pipe
(Field supply)
Drain pipe (VP25)
(Field supply)
4 mm or less
2
Band
1
Joint hose
Fasten the Band
2
at the position where the
screw is vertical.
The screw must be positioned at the rightside of
the Joint hose
1
as in the
fi
gure.
Drain pan
CAUTION
Do not connect to the Drain hole with adhesive. Using
adhesive may cause damage and water leaks.
(3) After installing the Joint hose
1
, check if the drainage is
smooth.
Downward
gradient
2.5-5.0mm
OK
NO GOOD
CAUTION
To prevent excessive force on Joint hose
1
, avoid bends or
twists. (To bend or twist may cause water leaks.)
(4) After checking for drainage, attach the Drain hose
insulation B
3
to insulate, following the instructions as in
the
fi
gures.
To avoid space with Joint hose
1
and Band
2
, press
fi
rmly the Drain hose insulation B
3
.
3
Drain hose
insulation B
Ensure thereis
no space.
Butt the insulation
against the unit.
STEP 1
Control box
Slit
Press
fi
rmly.
STEP 2
Slit
Press
fi
rmly.
Roll the insulation
over the joint.
STEP 3
FINISH
Press
fi
rmly.
• When using the drain port on the left side of the unit, remove
the drain cap and install it to the right side drain port.
Drain cap
Unit
CAUTION
Make sure the drain water is properly drained.
Содержание ARXB07L
Страница 36: ......