background image

En-14

(6)  Press 

ENTER

 switch (SW4) and fix it.

PEAK CUT

(L5)

(L6)

(L7)

0% of rated input ratio
50% of rated input ratio
75% of rated input ratio
100% of rated input ratio

(7)  Return to “Operating status display (Normal operation)” by pressing 

EXIT

 switch 

(SW5).

When pressed number is lost during operation, restart from the beginning of operation 

procedure after returning to “Operation status display (normal operation)” by pressing 

the 

EXIT

 switch once.

s

d

10. TEST RUN

 CAUTION

Always turn on the power 6 hours prior to the start of the operation in order to protect 
the compressor.

10.1. Check items before performing the test run

Make sure to perform the test run.

 

Before performing the test run, be sure to check the following points.

 

(1)  Is gas leaking? 
 

Check connection of each pipe (flare connection part, brazing part).

(2)   Is a breaker installed to the power cable of the outdoor unit?
(3)   Has each cable been securely connected to the terminal according to the 

specifications?

(4)   Are the 3-way valves (gas pipes and liquid pipes) of the outdoor units open?
(5)   Has the power been supplied to the unit for at least 6 hours?
(6)   Has the necessary local setting been done?
(7)   Check insulation resistance of 1 MΩ or more using a 500 V mega tester.

If no problems are found with the above items, perform the test run according to “Test 

 

run method”.
If any problems are found, immediately resolve the problem and re-check the items.

 

10.2. Test run method

 CAUTION

If the test run is performed for 1 outdoor unit in a group control system installation, the 

test run will also be performed for the other units. Therefore, make sure that all of the 

units have been installed before starting a test run.

 

(Group control system installation described in “SPECIAL INSTALLATION METHODS” 

in the installation manual of the indoor unit.)

Operate 

 

ENTER

 (TEST RUN) switch on the display board by the following procedure.

LED display 
part

Operation mode

Upper : HEAT

Lower : COOL

ENTER

 (TEST RUN) switch

10.2.1. Operating procedures for the test run

(1)  Check the 3-way valves (both at the liquid side and gas side) are opened.
(2)  Set the operation mode to “COOL” or “HEAT”.

POWER

MODE

ERROR

TEST

RUN

PUMP

DOWN

LOW NOISE

PEAK CUT

(L1)

(L2)

(L3)

(L4)

(L5)

(L6)

(L7)

In the first test run, be sure to set the operation mode to “COOL”.

 

The operation mode cannot be switched between “COOL” and “HEAT” during the test 

 

run. To switch the operation mode between “COOL” and “HEAT”, stop the test run, 

switch the operation mode, and then start the test run again.

9.2. Peak cut mode (Local work)

Efficient operation while reducing power supply and power consumption with below local 

work. 

Peak cut function can be effective with contact installation of an additional ON-OFF 

 

switch to the CN19 connector on the outdoor control board.

< Example of circuit diagram >

Outdoor unit 

control board

Adapter for 
external input

CN19

Power supply

Red

White

Black

1

2

3

1

2

3

SW2

Remote control 
panel

Local purchase

(1)   Make a circuit like above figure using an 

“Adapter external input” sold separately.

(2)  Set a restriction for below power 

consumption (compared with the rated 
consumption).  Refer to “8. How to 

operate display unit” for settings.

SW2...ON

Level 1 : 0% (Stop) 

 

Level 2 : 50%
Level 3 : 75%
Level 4 : 100%

(Shipment condition)

SW2...OFF

Normal operation

 

9.2.1. Setting for peak cut

SW2

SW3

SW4

SW5

LED display part

(1)   Switch to “Local setting mode” by pressing 

MODE

 switch (SW2) for 3 seconds or 

more.

(2)  Confirm POWER/MODE LED blinks 9 times, and press 

ENTER

 switch (SW4).

POWER

MODE

ERROR

TEST

RUN

(L1)

(L2)

(L3)

(L4)

(L5)

(L6)

(L7)

PUMP

DOWN

LOW NOISE

PEAK CUT

Blinks 

 

(9 times)

Sign “   ” : Lights off

(3)  Press 

SELECT

 switch (SW3), and adjust LED display as shown below. (Current 

setting is displayed)

TEST

RUN

(L1)

(L2)

(L3)

(L4)

PUMP

DOWN

LOW NOISE

Blink

PEAK CUT 

MODE

(4)  Press 

ENTER

 switch (SW4).

TEST

RUN

(L1)

(L2)

(L3)

(L4)

PUMP

DOWN

LOW NOISE

PEAK CUT 

MODE

   

 

Sign “   ” : Lights on

(5)  Press 

SELECT

 switch (SW3), and adjust LED display as shown in below figure.

PEAK CUT

(L5)

(L6)

(L7)

Blink

Blink

Blink Blink

Blink

0% of rated input ratio
50% of rated input ratio
75% of rated input ratio
100% of rated input ratio

9379069274-04_IM.indb   14

28/11/2555   10:57:17

Содержание AOYG36LATT

Страница 1: ...utorizado MANUALE DI INSTALLAZIONE UNITÀ ESTERNA tipo a 3 fasi A uso esclusivo del personale tecnico autorizzato ΕΓΧΕΙΡΙΔΙΟ ΕΓΚΑΤΑΣΤΑΣΗΣ ΕΞΩΤΕΡΙΚΗ ΜΟΝΑΔΑ Τριφασικού Τύπου Μόνο για εξουσιοδοτημένο τεχνικό προσωπικό MANUAL DE INSTALAÇÃO UNIDADE EXTERIOR Tipo trifásica Apenas para pessoal de assistência autorizado РУКОВОДСТВО ПО УСТАНОВКЕ ВНЕШНИЙ МОДУЛЬ 3 фазного типа Только для авторизованного обслу...

Страница 2: ...ain the unit Do not place any other electrical products or household belongings under indoor unit or outdoor unit Dripping condensation from the unit might get them wet and may cause damage or malfunction of your property 2 ABOUT THE UNIT d 2 1 Precautions for using R410A refrigerant WARNING Do not introduce any substance other than the prescribed refrigerant into the refrigeration cycle If air en...

Страница 3: ...rant pipe connections or other areas Touching the refrigerant directly can cause frostbite If a refrigerant leak occurs during operation immediately vacate the premises and thoroughly ventilate the area If the refrigerant comes in contact with a flame it produces a toxic gas The basic installation work procedures are the same as conventional refrigerant models However pay careful attention to the ...

Страница 4: ...tion route installation space maintenance space and access and install the unit in a location with sufficient space for the refrigerant piping Observe the installation space specifications that are shown in the figures Keep the same space at rear air intake Provide the same space for the air intake at the rear of the outdoor unit If the installation is not performed according to the specifications...

Страница 5: ...low If overturning prevention is required purchase the necessary commercially available items Bolt 20 mm Nut Base Fix securely with bolts on a solid block Use 4 sets of commercially available M10 bolt nut and washer 4 PIPE SELECTION 4 1 Selecting the pipe material CAUTION Do not use existing pipes Use pipes that have clean external and internal sides without any contamination which may cause troub...

Страница 6: ...ference H1 Indoor unit to outdoor unit m 30 Max height difference H2 Indoor unit to indoor unit m 0 5 View Example L2 L3 L4 L1 H1 H2 1 For the standard pipe diameter 4 4 Connectable pipe diameter and max piping length The figures enclosed by a thick lined frame indicate the standard pipe diameter and max piping length 4 4 1 Single type installation Capacity Btu h class 36 000 45 000 54 000 Pipe di...

Страница 7: ...erant piping branches Branch pipes are twin or triple type for concurrent operation and may be used for piping between the outdoor and indoor units Select a twin or triple type branch pipe and purchase it before starting the installation work Shorten the length of branch pipes from a branch to indoor unit as short as possible Maximum length within 20 m Branch pipes shall be connected by welding br...

Страница 8: ...art of Blank cap is sealed for protection Fasten blank cap tightly after opening valves Table A Blank cap mm in Tightening torque N m kgf cm 6 35 1 4 20 to 25 200 to 250 9 52 3 8 20 to 25 200 to 250 12 70 1 2 25 to 30 250 to 300 15 88 5 8 30 to 35 300 to 350 19 05 3 4 35 to 40 350 to 400 Operating the valves Use a hexagon wrench size 4 mm Opening 1 Insert the hexagon wrench into the valve shaft an...

Страница 9: ...s 19 05 3 4 15 m 25 m 35 m g m Liquid 12 70 1 2 None 1 000 g 2 000 g 100 g m Gas 15 88 5 8 19 05 3 4 1 Refer to View in the table of 4 3 1 Single type installation Simultaneous operation multi type Twin L1 L2 L3 2 Pre charge length Triple L1 L2 L3 L4 3 Pre charge length 2 Refer to View in the table of 4 3 2 Simultaneous operation multi type installation 3 Refer to View in the table of 4 3 2 Simult...

Страница 10: ... power factor improvement condenser Instead of improving the power factor the condenser may overheat Be sure to perform the earthing grounding work Do not connect earthing grounding wires to a gas pipe water pipe lightning rod or earthing grounding wire for a telephone Connection to a gas pipe may cause a fire or explosion if gas leaks Connection to a water pipe is not an effective earthing ground...

Страница 11: ...s are provided for wiring Fig A Knock out holes are provided 2 each in the same size in front lateral and rear sides Fig B Fig A Fig B Installation method of One touch bush Please fix the One touch bush accessory as shown in the figure below Front connection Lateral connection Rear connection One touch cable bush Accessories One touch cable bush Accessories One touch cable bush Accessories Pipe co...

Страница 12: ...the wiring is complete s d 7 PIPE INSTALLATION 2 WARNING Install the insulated pipes so that they do not touch the compressor 7 1 Installing insulation Use an insulation on the refrigerant pipes to prevent condensation and dripping Fig A Determine the thickness of the insulation material by referring to Table A Table A Selection of insulation for using an insulation material with equal heat transm...

Страница 13: ...EAK CUT L5 L6 L7 Orange Lights on during Peak cut function when local setting is activated Lighting pattern of L5 L6 and L7 indicates peak cut level _ Refer to 9 LOCAL SETTING Switch Function or operation method SW1 DIP switch For selecting cooling or heating during test operation Positions 2 to 4 of DIP switch are not used SW2 Push switch To switch between Local setting and Error code display SW3...

Страница 14: ...AT Lower COOL ENTER TEST RUN switch 10 2 1 Operating procedures for the test run 1 Check the 3 way valves both at the liquid side and gas side are opened 2 Set the operation mode to COOL or HEAT POWER MODE ERROR TEST RUN PUMP DOWN LOW NOISE PEAK CUT L1 L2 L3 L4 L5 L6 L7 In the first test run be sure to set the operation mode to COOL The operation mode cannot be switched between COOL and HEAT durin...

Страница 15: ... valves both at the liquid side and gas side are opened 2 Turn the power on POWER MODE ERROR TEST RUN PUMP DOWN LOW NOISE PEAK CUT L1 L2 L3 L4 L5 L6 L7 3 Press PUMP DOWN switch for 3 seconds or more after 3 minutes after power on ERROR TEST RUN PUMP DOWN LOW NOISE PEAK CUT POWER MODE L1 L2 L3 L4 L5 L6 L7 LED display lights on as shown in the above figure and the fans and the compressor start opera...

Страница 16: ... 4 PFC AD detection error 2 6 4 PFC hardware error 2 6 5 IPM error Trip terminal L error 2 6 8 Rush current limiting resister temp rise protection 2 7 1 Discharge temp sensor error 2 7 2 Compressor temp sensor error 2 7 3 Heat Ex middle temp sensor error 2 7 3 Outdoor unit Heat Ex liquid temp sensor error 2 7 4 Outdoor temp sensor error 2 7 7 Heat sink temp sensor error 2 7 7 PFC heat sink temp se...

Страница 17: ......

Отзывы: