background image

En-5

Lo

Hi

Service hose

Gauge manifold

Vacuum pump

 CAUTION

Use a clean gauge manifold 
and charging hose for R410A 
exclusively.

 CAUTION

Do not purge the air with refrigerants, but use a vacuum pump to vacuum the 
installation.
There is no extra refrigerant in the outdoor unit for air purging.
Use a vacuum pump and gauge manifold and charging hose for R410A exclusively.
Using the same vacuum for different refrigerants may damage the vacuum pump or the 
unit.

ADDITIONAL CHARGE

 CAUTION

When moving and installing the air conditioner, do not mix gas other than the 
speci

fi

 ed refrigerant R410A inside the refrigerant cycle.

When charging the refrigerant R410A, always use an electronic balance for refrig-
erant charging (to measure the refrigerant by weight).
When charging the refrigerant, take into account the 
slight change in the composition of the gas and liquid 
phases, and always charge from the liquid phase side 
whose composition is stable.

R410A

Liquid

Gas

Add refrigerant from the charging valve after the comple-
tion of the work.
If the units are further apart than the maximum pipe length, correct operation can-
not be guaranteed.

GAS LEAKAGE INSPECTION 

 CAUTION

After connecting the piping, check the all joints for gas leakage with gas leak detector.

When inspecting gas leakage, always use the vacuum pump for pressure. Do not use 
nitrogen gas.

5.7. TEST RUN

  Perform test operation and check items below.

  For the test operation method, refer to the operating manual.

   The outdoor unit, may not operate, depending on the room temperature. In this 

case, keep on pressing the MANUAL AUTO button of the indoor unit for more than 
10 seconds. The operation indicator lamp and timer indicator lamp will begin to 

fl

 ash 

simultaneously during cooling test run. Then, heating test run will begin in about three 
minutes when HEAT is selected by the remote control operation. (Please follow the 
operating manual for remote control operation.)

   To end test operation, keep on pressing the MANUAL AUTO button of the indoor unit for 

more than 3 seconds.

   (When the air conditioner is run by pressing the MANUAL AUTO button, the OPERA-

TION indicator lamp and TIMER indicator lamp of the indoor unit will simultaneously 

fl

 ash slowly.)

OUTDOOR UNIT

(1)  Is there any abnormal noise and vibration during operation?
(2)  Will noise, wind, or drain water from the unit disturb the neighbors?
(3)  Is there any gas leakage?

 CAUTION

Always turn on the power 12 hours prior to the start of the operation in order to 
ensure compressor protection.

BENDING PIPES

(1)  When bending the pipe, be careful not to crush it.
(2)  To prevent breaking of the pipe, avoid sharp bends.
 

Bend the pipe with a radius of curvature of 70 mm or over.

(3)  If the copper pipe is bend the pipe or pulled to often, it will become stiff. Do not 

bend the pipes more than three times at one place.

Holding spanner

90°

Body side

Torque wrench

To prevent gas leakage, coat the 

fl

 are 

surface with refrigerator oil.

Table 1 

Flare nut tightening torque

Flare nut [mm (in.)]

Tightening torque [N 

• 

m (lbf 

• 

ft)]

6.35 (1/4) dia.

16 to 18 (11.8 to 13.3)

9.52 (3/8) dia.

32 to 42 (23.6 to 31.0)

12.70 (1/2) dia.

49 to 61 (36.1 to 45.0)

Table 2 

Pipe outside diameter

Pipe outside diameter [mm (in.)]

A [mm (in.)]

Flare tool for R410A, clutch type

6.35 (1/4)

0 to 0.5 (0 to 1/32)

9.52 (3/8)

12.70 (1/2)

 CAUTION

Fasten a 

fl

 are nut with a torque wrench as instructed in this manual. If fastened too 

tight, the 

fl

 are nut may be broken after a long period of time and cause a leakage of 

refrigerant.
Install heat insulation around both the gas and liquid pipes. Failure to do so may cause 
water leaks.
Use heat insulation with heat resistance above  248 °F. (Reverse cycle model only)
In addition, if the humidity level at the installation location of the refrigerant piping is 
expected to exceed 70%, install heat insulation around the refrigerant piping. If the 
expected humidity level is 70-80%, use heat insulation that is 15 mm or thicker and if 
the expected humidity exceeds 80%, use heat insulation that is 20 mm or thicker.
If heat insulation is used that is not as thick as speci

fi

 ed, condensation may form on the 

surface of the insulation.
In addition, use heat insulation with heat conductivity of 0.045 W/(m·K) or less (at 68 °F).

5.5. Vacuum

(1)  Remove the cap, and connect the gauge manifold and the vacuum pump to the 

charging valve by the service hoses.

(2) Vacuum the indoor unit and the connecting pipes until the pressure gauge 

indicates -0.1 MPa (-76 cmHg).

(3)  When -0.1 MPa (-76 cmHg) is reached, operate the vacuum pump for at least 

30 minutes.

(4)  Disconnect the service hoses and 

fi

 t the cap to the charging valve to the speci

fi

 ed 

torque.

(5)  Remove the blank caps, and fully open the spindles of the 2-way and 3-way 

valves with a hexagon wrench [Torque: 2.9 N·m (30 kgf·cm)].

(6)  Tighten the blank caps of the 2-way valve and 3-way valve to the speci

fi

 ed torque.

Tightening torque [N

 

• 

m (lbf

 

• 

ft)]

Blank cap

6.35 mm (1/4 in.)

20 to 25 (14.8 to 18.4)

9.52 mm (3/8 in.)

12.70 mm (1/2 in.)

28 to 32 (20.7 to 23.6)

Charging port cap

10 to 12 (7.4 to 8.8)

Blank cap

Charging port

Cap

Service hose
with valve core

Outdoor unit

3-way valve

Connecting pipe

Hexagon wrench

Use a 4 mm
hexagon wrench.

9379069649_IM.indb   5

9379069649_IM.indb   5

12/8/2014   2:04:46 PM

12/8/2014   2:04:46 PM

Содержание 9RLS3H

Страница 1: ...rvicing Turn the power OFF at the main circuit breaker panel before opening the unit to check or repair electrical parts and wiring Keep your fingers and clothing away from any moving parts Clean up the site after you finish remembering to check that no metal scraps or bits of wiring have been left inside the unit being serviced After installation explain correct operation to the customer using th...

Страница 2: ...r for HFC refrigerant R410A Copper pipes It is necessary to use seamless copper pipes and it is desirable that the amount of residual oil is less than 40 mg 10 m Do not use copper pipes having a collapsed deformed or discolored portion especially on the interior surface Otherwise the expansion value or capillary tube may become blocked with contaminants As an air conditioner using R410A incurs pre...

Страница 3: ...door temperature Cooling Dry Mode About 14 to 115 F Heating Mode About 15 to 75 F 2 7 Accessories Installation manual 1 One set of following parts are necessary installation of this product Name Connection pipe assembly Decorative tape Saddle Tapping screws Connection cable Vinyl tape M10 bold nut Sealant Wall pipe Wall cap 3 SELECTING THE MOUNTING POSITION Decide the mounting position with the cu...

Страница 4: ...will not be able to compress 1 Remove the tapping screw then remove the control box cover 2 Fasten the Inter unit wire harness and power supply to the conduit holder using the lock nut 3 Connect inter unit wire harness and power supply to the terminal 4 Use the tapping screw to install the control box cover NOTE Connector trade size for this unit is 1 2 12 7 mm The connector can be bought at a har...

Страница 5: ...ation in order to ensure compressor protection BENDING PIPES 1 When bending the pipe be careful not to crush it 2 To prevent breaking of the pipe avoid sharp bends Bend the pipe with a radius of curvature of 70 mm or over 3 If the copper pipe is bend the pipe or pulled to often it will become stiff Do not bend the pipes more than three times at one place Holding spanner 90 Body side Torque wrench ...

Страница 6: ...nnot start if the MANUAL AUTO button is not kept on pressing for more than 10 sec onds 2 Close the valve stem of 2 way valve completely 3 Continue the forced cooling operation for 2 to 3 minutes then close all the valve stems on the 3 way valves 4 Stop the operation Press the START STOP button of the remote controller to stop the operation Press the MANUAL AUTO button when stopping the operation f...

Отзывы: