Preparing for use
14
A26361-K666-Z120-1-7619, edition 3
0
I
1
2
1 = Main power switch
2 = ON/OFF switch
0 = PC is switched off
I = PC is ready-to-operate
►
Switch the PC on with the main power switch on the back panel.
►
Press the ON/OFF switch on the front of the PC.
The corresponding indication then appears on the LCD or the relevant indicators light (see chapter
"Indicators on the PC").
Installing the software
►
During installation, follow the instructions on screen.
Consult the operating system manual if there is anything unclear about the requested input data.
i
You will find further information about the system, drivers, utilities, updates, manuals etc.
on the "Drivers & Utilities" CD supplied.