4. OPERATION:
Level the rear tray to the operation position.
Overlap upper and lower film in the front of Heat Shoe.
Set the Operation Lever up to “OPEN”.
Position a Film Setting Board between the Heat Rollers
together with films.
Set Operation Lever down to “LAMINATE”. Switch the Motor Switch to the FWD position and pass the film web through
the rollers using the film setting board (threading card) (included with the laminator).
Be certain that the threading card exits the rear of the machine. Allow the threading card to drop towards the floor as
the machine runs.
If the threading board does not exit the machine STOP THE MOTOR and use the reverse function to bring the card back
out the front. Left to run in this manner will cause damage to delicate parts on the interior of the machine.