Service Manual for FNDX 5
08/2009 FR
16.1.7 ACCEPTANCE TESTRUN OF THE PROCESSOR
The Safety Inspetor must make a Testrun as described in the Instruction Manual and have to check
the full function!
Processor:
- minimum 1 Heat-up phase of the Heating components checked
F
c
O.K.
F
c
not O.K.
- Testrun like in the Instruction Manual described done and completed
F
c
O.K.
F
c
not O.K.
Safety Inspector: ...............................................
Location, Date:
...............................................
16.1.8 TEST FOR LEAKS
The Safety Inspetor must check the whole Hose-System and must test the Processor for leaks!
Processor:
- Internal and external Piping and Hose-System
F
c
O.K.
F
c
not O.K.
Safety Inspector: ...............................................
Location, Date:
...............................................
ACCEPTANCE BILL:
A complete technical inspection has been carried out and specific problems has been discussed with the
customer.
16.1.6 CHECK OF THE INTERLOCK SWITCH
The Safety Inspector must make sure that the Covers are mounted correctly!
Processor:
- Interlock Switch is fix and safety
F
c
O.K.
F
c
not O.K.
Safety Inspector: ...............................................
Location, Date:
...............................................
Page 30