GT1-70 Compact
Low Pressure
Undersink RO
Contents
Technical Overview ...................................................................................................................................... 2
I. Important Notes ..................................................................................................................................... 2
II. Before You Purchase/Open .................................................................................................................. 2
III. Space Requirements ............................................................................................................................ 2
IV. Before You Begin Installation ............................................................................................................... 2
V. What is Reverse Osmosis ..................................................................................................................... 2
Installation Introduction ................................................................................................................................. 3
I. Working with Quick Connect Fittings ...................................................................................................... 3
II. Flushing ................................................................................................................................................ 3
Installing Connections .................................................................................................................................. 3
I. Feed Water Connection ......................................................................................................................... 3
II. Drain Clamp .......................................................................................................................................... 3
III. Drilling Faucet Hole - Stainless Steel Sink) .......................................................................................... 3
IV. Mounting the Faucet ............................................................................................................................ 4
V. Storage Tank Assembly ........................................................................................................................ 4
VI. Assembling the System ....................................................................................................................... 5
Connecting the RO System .......................................................................................................................... 5
I. Tubing .................................................................................................................................................... 5
System Start Up & Operation........................................................................................................................ 5
I. Plumber Commissioning Steps .............................................................................................................. 5
II. Client can Complete Commissioning ..................................................................................................... 5
III. Automatic Shut Off ............................................................................................................................... 6
IV. Turning the System On/Off .................................................................................................................. 6
Maintenance ................................................................................................................................................. 6
I. Replacement Parts................................................................................................................................. 6
II. Replacement Cartridges ....................................................................................................................... 6
III. Testing Filters ...................................................................................................................................... 6
Troubleshooting ............................................................................................................................................ 7
Additional Extras........................................................................................................................................... 9
I. Water Hammer Arrester ......................................................................................................................... 9
II. Leak Shut Off Kit ................................................................................................................................... 9
Страница 1: ...ter Connection 3 II Drain Clamp 3 III Drilling Faucet Hole Stainless Steel Sink 3 IV Mounting the Faucet 4 V Storage Tank Assembly 4 VI Assembling the System 5 Connecting the RO System 5 I Tubing 5 Sy...
Страница 2: ...ssure 175 kPa 700 kPa Temperature 4 5 C 38 C pH Level 2 11 TDS 0 mg L 2 000 mg L Iron 0 mg L 0 3 mg L Manganese 0 mg L 0 1 mg L Hardness 0 mg L 200 mg L III Space Requirements System Dimensions Height...
Страница 3: ...tween DO NOT apply thread tape to these connections as they are designed to use the washers only Thread tape is only required on the male thread of the FWA if it is not installing to a flex line With...
Страница 4: ...tance thread the Compression nut over the tubing followed by the cone washer Then firmly press the gasket into the end of the tubing You can then insert the tubing into the base of the faucet and secu...
Страница 5: ...t the faucet due to the low flow rate of the membrane The drain line however should begin to run as soon as water reaches the membrane 5 When the water first comes out of the tap it will be grey and d...
Страница 6: ...e first 45 seconds of water If the system has been shut down for over 1 week discard a full tank of water Maintenance I Replacement Parts Filtration tubing should be replaced periodically about every...
Страница 7: ...Water Quality 1 Turn on the water supply and ensure there are no obstructions to the water flow 2 Disconnect the tube between the membrane and pre filters and run water at full pressure to see if wate...
Страница 8: ...of the water especially when new If you have low TDS water already it is possible for the TDS level out of the alkaline filter to be higher than your inlet water This is because you are adding mineral...
Страница 9: ...suddenly stopped or forced in other directions by fast closing valves Sioux Chief shock arresters are best used at the point of shock and should be installed as close to the valve or piping where the...
Страница 10: ...stems must be installed by a qualified plumber The consumer is responsible for keeping record and proof of installation in the form of an invoice and or receipt Filter systems must be maintained as pe...
Страница 11: ...to terms and conditions outlined below This extended warranty covers the below parts of the system GT8 0S Twin O Ring Housings GT8 31 Reverse Osmosis Housing GT35 12 NPT Stainless Steel Centre Joiner...