background image

GT1-26-4 

4 Stage Undersink RO 

Contents 

Technical Overview ...................................................................................................................................... 2

 

I. Important Notes ..................................................................................................................................... 2

 

II. Before You Purchase/Open .................................................................................................................. 2

 

III. Space Requirements ............................................................................................................................ 2

 

IV. Before You Begin Installation ............................................................................................................... 2

 

V. What is Reverse Osmosis ..................................................................................................................... 2

 

Installation Introduction ................................................................................................................................. 3

 

I. Working with Quick Connect Fittings ...................................................................................................... 3

 

II. Flushing ................................................................................................................................................ 3

 

Installing Connections .................................................................................................................................. 3

 

I. Feed Water Connection ......................................................................................................................... 3

 

II. Drain Clamp .......................................................................................................................................... 3

 

III. Drilling Faucet Hole - Stainless Steel Sink) .......................................................................................... 3

 

IV. Mounting the Faucet ............................................................................................................................ 4

 

V. Storage Tank Assembly ........................................................................................................................ 4

 

VI. Assembling the System (Photos Below) .............................................................................................. 5

 

Connecting the RO System .......................................................................................................................... 6

 

I. Tubing .................................................................................................................................................... 6

 

System Start Up & Operation........................................................................................................................ 6

 

I. Plumber Commissioning Steps .............................................................................................................. 6

 

II. Client can Complete Commissioning ..................................................................................................... 6

 

III. Automatic Shut Off ............................................................................................................................... 7

 

IV. Turning the System On/Off .................................................................................................................. 7

 

Maintenance ................................................................................................................................................. 7

 

I. Replacement Parts................................................................................................................................. 7

 

II. Replacement Cartridges ....................................................................................................................... 7

 

III. Testing Filters ...................................................................................................................................... 7

 

Troubleshooting ............................................................................................................................................ 8

 

Additional Extras......................................................................................................................................... 10

 

I. Water Hammer Arrester ....................................................................................................................... 10

 

II. Leak Shut Off Kit ................................................................................................................................. 10

 

 

 

Содержание GT1-26-4

Страница 1: ...3 II Drain Clamp 3 III Drilling Faucet Hole Stainless Steel Sink 3 IV Mounting the Faucet 4 V Storage Tank Assembly 4 VI Assembling the System Photos Below 5 Connecting the RO System 6 I Tubing 6 Sys...

Страница 2: ...350 kPa 700 kPa Temperature 4 5 C 38 C pH Level 2 11 TDS 0 mg L 2 000 mg L Iron 0 mg L 0 3 mg L Manganese 0 mg L 0 1 mg L Hardness 0 mg L 200 mg L III Space Requirements System Dimensions 4 Stage Hei...

Страница 3: ...tween DO NOT apply thread tape to these connections as they are designed to use the washers only Thread tape is only required on the male thread of the FWA if it is not installing to a flex line With...

Страница 4: ...tance thread the Compression nut over the tubing followed by the cone washer Then firmly press the gasket into the end of the tubing You can then insert the tubing into the base of the faucet and secu...

Страница 5: ...al cartridges maintain minimal contact with the surface of the carbon filter handle by the end caps only to avoid contamination 5 Screw up the housings while they are in a vertical position to ensure...

Страница 6: ...he water it gives the water a milky appearance This will eventually dissipate as the air is flushed from the system this can sometimes take a few days to stop completely The water is still safe to dri...

Страница 7: ...ing the Pressure Limiting Valve every 2 years If the system is having issues with the shut off valve and is over 2 years old the 4 way shut off valve should also be replaced II Replacement Cartridges...

Страница 8: ...e changed 3 Reverse Osmosis required 50psi Minimum to operate 70psi is ideal If you have lower than 50psi pressure this unit may not be suitable for you 4 Ensure that the water quality meets the feed...

Страница 9: ...mmendations it is likely that the increased TDS is due to the filters needing replacing 4 This is common as sometimes the lines may be mixed up Make sure that the tubing connected to the Drain Line fl...

Страница 10: ...of shock and should be installed as close to the valve or piping where the shock originates from Sioux Chief shock arresters are designed with the latest diaphragm technology A high grade diaphragm i...

Страница 11: ...stems must be installed by a qualified plumber The consumer is responsible for keeping record and proof of installation in the form of an invoice and or receipt Filter systems must be maintained as pe...

Страница 12: ...to terms and conditions outlined below This extended warranty covers the below parts of the system GT8 0S Twin O Ring Housings GT8 31 Reverse Osmosis Housing GT35 12 NPT Stainless Steel Centre Joiner...

Страница 13: ......

Отзывы: