![FS FS-S038-2IO-24F Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/fs/fs-s038-2io-24f/fs-s038-2io-24f_quick-start-manual_2340638004.webp)
EN
3
Installation
Open the Closure
FOSC cover
FOSC hoop (left)
FOSC hoop (right)
Hoop connector
Hoop fixing bolt
Bracket
Base
Entry/exit tube(mass)
Hoop locking system
Determine the Length of Fiber Cable
Fiber cable
Temp.
locating mark
100mm sealing and fixing length of fiber cable inside inlet/outlet tube
1750mm length of protective coat of fiber cable to be stripped off
150mm length of fiber with protective coat
(the distance from fixing point of fiber cable to fixing point of FOST)
1600mm length of protective coat of fiber to be stripped
off(to be spliced and winded inside the FOST)
2(A)
Demount hoop fixing bolt and pull hoop locking system out, then proceed in demounting the hoop.
Pull the FOSC cover upwards out.
NOTE:
If the weather condition is not good enough, then a tent must be pitched for
waterproof and dustproof.
Grommet
Fiber holding tray
FOST
Fixing device for
reinforced core
Big gasket
ring
Fixing seat
Entry/exit tube