1-18
20.
Remove the drain valve(s), temperature probe(s), high-limit thermostat(s), and ignitor
assemblies. Inspect each of these components carefully and install them in the replacement
frypot if they are in serviceable condition. Use Loctite
®
PST56765 sealant or equivalent on
component threads.
NOTE:
Some servicers, based upon their experience, recommend replacing probes and
thermostats whenever a frypot is replaced; however, this remains the customer’s decision.
21.
Reverse steps 1-19 to reassemble fryer.
NOTE:
Care should be taken not to over-torque nuts on frypots made of 439 stainless steel, as
this could tear the material. One turn past hand-tight is sufficient torque.
22.
Perform steps 14 through 18 of Section 1.6.8 to ensure that there are no leaks in the burner
insulation.
CAUTION
Before installing temperature probe, high-limit thermostat, and drain valve on replacement
frypot, clean the threads and apply Loctite
®
PST56765 thread sealant or equivalent.
1.6.11
Replacing Frypot Insulation and/or Upper Burner Rails
NOTE:
Replacing the burner rails requires completely tearing down the frypot and installing new
frypot insulation. See the referenced illustrations for component identification.
To remove the old insulation and/or upper burner rails (use illustration on page 1-20):
1.
Remove the frypot according to the instructions in Section 1.6.10.
2.
Remove the burner assemblies (1).
3.
Remove insulation retainers and blanket insulation (2).
4.
Remove the upper oil zone insulation bracket and upper oil zone insulation (3).
5.
Remove the plenum (4).
6.
Remove the front lower combustion chamber insulation retainer and insulation (5), and the front
lower combustion chamber inner insulation retainer and insulation (6).
NOTE:
Full-vat units have
two-piece insulation retainer and insulation components. Dual-vat units have one-piece components.
7.
Remove the upper combustion chamber insulation retainer and insulation (7).
8.
Remove the inner upper combustion chamber insulation retainer and insulation (8).
9.
Remove the rear lower combustion chamber retainers, back, and insulation (9).
NOTE:
Full-vat
units have two-piece backs and four retainers. Dual-vat units have one-piece backs and two
retainers.
10.
Remove the flue assembly (10).
11.
Remove the upper burner rails (11).
12.
Remove any residual insulation, sealant, and/or oil from the exterior of the frypot.
Содержание FOOTPRINT H50
Страница 24: ...1 19 Disassembling A Frypot Full vat Illustrated Spacers Spacer 10 2 3 4 5 6 7 8 1 11 9...
Страница 47: ...1 42 1 11 2 Pro H50 55 Series Fryer Single Full vat 805 1675...
Страница 48: ...1 43 1 11 3 Pro H50 55 Series Fryer Single Dual vat...
Страница 49: ...1 44 1 11 4 Pro H50 55 Series Fryer Single CE...
Страница 50: ...1 45 1 11 5 Pro H50 55 Series Fryer Single FAST ready...
Страница 52: ...1 47 1 11 6 3 FPPH 250 255 450 455 Transformer Filter Box 8051340C...
Страница 53: ...1 48 1 11 6 4 FPPH 350 355 Transformer Filter Box...
Страница 54: ...1 49 1 11 7 Modular Basket Lift 100 120V 1 2 4 3 5 6 12 7 8050518E...
Страница 56: ...1 51 1 11 9 Wiring Diagrams Oil Return Disposal Oil Return Wand Wiring Japan Oil Return Disposal Wiring Sonic...
Страница 67: ...2 11 2 5 Drain Filtration and Oil Return System Components 2 5 1 Filtration System Components...
Страница 69: ...2 13 2 5 2 Drain Valves and Associated Components...
Страница 79: ...2 23 2 6 Electronics and Electrical Components for Controllers Page 2 10 2 6 1 Component Boxes...
Страница 86: ...2 30 2 7 2 Dual Vat Frypot Components...
Страница 97: ...3 3 3 3 Single H50 55 Component Boxes...