/ Perfect Charging / Perfect Welding /
Solar Energy
42,0426,0318,EN 012-22112018
Fronius Symo HybridBYD B-BOX HVWiring examples
Installations instructions
Grid-connected inverter
EN
Страница 1: ...Perfect Charging Perfect Welding Solar Energy 42 0426 0318 EN 012 22112018 Fronius Symo Hybrid BYD B BOX HV Wiring examples Installations instructions Grid connected inverter EN...
Страница 2: ...2...
Страница 3: ...rgy into the grid 7 Cabling variants including emergency power circuits and 4 pin separation e g Germany 8 Circuit diagram 8 Functions 8 Cabling for emergency power circuits and non emergency power ci...
Страница 4: ...4...
Страница 5: ...grid operator and obtaining their express approval This obligation ap plies in particular to those parties responsible for constructing the system e g the install er The examples suggested here show t...
Страница 6: ...s need to be divided into emergency power circuits and non emergency power circuits The total load of the emergency power circuits must not exceed the nominal output of the inverter The emergency powe...
Страница 7: ...the lock ing was successfully performed by relay K3 5 The inverter decides based on both the relay s feedback as well as the measurement that the emergency power mode can be activated 6 The inverter...
Страница 8: ...de only the emergency power circuits are disconnected at all pins from the grid by contactors K1 and K2 a ground connection is only established for these circuits The rest of the home network is not s...
Страница 9: ...is prevents unintentional activation of contactors K1 K2 K4 and K5 and thus a grid connection when voltage is restored in the grid 6 The NO contact of relay K3 gives additional feedback to the inverte...
Страница 10: ...Hz Modbus RTU communication External ENS Other types and manufacturers are permitted if they are technically and functionally iden tical to the following e g Manufacturer Bender e g Type VMD460 NA D...
Страница 11: ...Appendix...
Страница 12: ...X4 L2 L3 N 1 X5 2 3 4 5 6 L1 X2 L2 L3 N L1 X3 L2 L3 N 1 3 2 4 5 6 K2 A1 A2 K2 31 32 K2 7 11 14 K3 FRONIUS SYMO HYBRID A1 A1 A4 1 HYBRID MANAGER IO 3 11m I 4 14m 12m 13m I 6 I 7 15m I 9 I 8 I 5 16m A1...
Страница 13: ...1 X1 L1 L2 L3 N PE X4 L1 L2 L3 N X5 1 2 3 X5 4 5 6 X2 L1 L2 L3 N X3 L1 L2 L3 N FRONIUS SYMO HYBRID A1 A1 A4 1 HYBRID MANAGER IO 3 11m I 4 14m 12m 13m I 6 I 7 15m I 9 I 8 I 5 16m A1 A4 1 X2 IO 2 1m 5m...
Страница 14: ...21 22 K5 31 32 K1 31 32 K4 1 3 2 4 5 6 7 8 K2 1 2 F3 A1 A2 K2 31 32 K2 21 22 K3 A1 A2 K4 A1 A2 K5 A1 A2 K1 L1 X1 L2 L3 N PE L1 X4 L2 L3 N 1 X5 2 3 4 5 6 L1 X2 L2 L3 N L1 X2 L2 L3 N 7 11 14 K3 IO 3 11m...
Страница 15: ...ON RESISTORS LOAD UTILITY METER METER FUSE METER FUSE IO 3 11m I 4 14m 12m 13m I 6 I 7 15m I 9 I 8 I 5 16m A1 A4 1 X2 IO 2 1m 5m 8m 2m IO 1 D D 9m 7m 3m 6m 4m IO 0 10m PV A1 X2 PV X DC 1 BAT DC 2 BAT...
Страница 16: ...usplatz 1 Austria E Mail pv sales fronius com www fronius com Fronius USA LLC Solar Electronics Division 6797 Fronius Drive Portage IN 46368 E Mail pv us fronius com www fronius usa com Under www fron...